Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Combined protein construct and synthetic gene engineering for heterologous protein expression and crystallization using Gene Composer

With the goal of improving yield and success rates of heterologous protein production for structural studies we have developed the database and algorithm software package Gene Composer. This freely available electronic tool facilitates the information-rich design of protein constructs and their engineered synthetic gene sequences, as detailed in the accompanying manuscript. In this report, we compare heterologous protein expression levels from native sequences to that of codon engineered synthetic gene constructs designed by Gene Composer. A test set of proteins including a human kinase (P38{alpha}), viral polymerase (HCV NS5B), and bacterial structural protein (FtsZ) were expressed in both E. coli and a cell-free wheat germ translation system. We also compare the protein expression levels in E. coli for a set of 11 different proteins with greatly varied G:C content and codon bias. The results consistently demonstrate that protein yields from codon engineered Gene Composer designs are as good as or better than those achieved from the synonymous native genes. Moreover, structure guided N- and C-terminal deletion constructs designed with the aid of Gene Composer can lead to greater success in gene to structure work as exemplified by the X-ray crystallographic structure determination of FtsZ from Bacillus subtilis. These results validate the Gene Composer algorithms, and suggest that using a combination of synthetic gene and protein construct engineering tools can improve the economics of gene to structure research.

59 BASIC BIOLOGICAL SCIENCES↗

Wetland Water Cooling Partnership: The Use of Constructed Wetlands to Enhance Thermoelectric Power Plant Cooling and Mitigate the Demand of Surface Water Use

Through the Phase I study segment of contract #DE-NT0006644 with the U.S. Department of Energy’s National Energy Technology Laboratory, Applied Ecological Services, Inc. and Sterling Energy Services, LLC (the AES/SES Team) explored the use of constructed wetlands to help address stresses on surface water and groundwater resources from thermoelectric power plant cooling and makeup water requirements. The project objectives were crafted to explore and develop implementable water conservation and cooling strategies using constructed wetlands (not existing, naturally occurring wetlands), with the goal of determining if this strategy has the potential to reduce surface water and groundwater withdrawals of thermoelectric power plants throughout the country. Our team’s exploratory work has documented what appears to be a significant and practical potential for augmenting power plant cooling water resources for makeup supply at many, but not all, thermoelectric power plant sites. The intent is to help alleviate stress on existing surface water and groundwater resources through harvesting, storing, polishing and beneficially re-using critical water resources. Through literature review, development of conceptual created wetland plans, and STELLA-based modeling, the AES/SES team has developed heat and water balances for conventional thermoelectric power plants to evaluate wetland size requirements, water use, and comparative cooling technology costs. The ecological literature on organism tolerances to heated waters was used to understand the range of ecological outcomes achievable in created wetlands. This study suggests that wetlands and water harvesting can provide a practical and cost-effective strategy to augment cooling waters for thermoelectric power plants in many geographic settings of the United States, particularly east of the 100th meridian, and in coastal and riverine locations. The study concluded that constructed wetlands can have significant positive ancillary socio-economic, ecosystem, and water treatment/polishing benefits when used to complement water resources at thermoelectric power plants. Through the Phase II pilot study segment of the contract, the project team partnered with Progress Energy Florida (now Duke Energy Florida) to quantify the wetland water cooling benefits at their Hines Energy Complex in Bartow, Florida. The project was designed to test the wetland’s ability to cool and cleanse power plant cooling pond water while providing wildlife habitat and water harvesting benefits. Data collected during the monitoring period was used to calibrate a STELLA model developed for the site. It was also used to inform management recommendations for the demonstration site, and to provide guidance on the use of cooling wetlands for other power plants around the country. As a part of the pilot study, Duke Energy is scaling up the demonstration project to a larger, commercial scale wetland instrumented with monitoring equipment. Construction is expected to be finalized in early 2014.

20 FOSSIL-FUELED POWER PLANTS↗

Design and construction of coal/biomass to liquids (CBTL) process development unit (PDU) at the University of Kentucky Center for Applied Energy Research (CAER)

This report describes a first phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction of the building and upstream process units for feed handling, gasification, and gas cleaning, conditioning and compression. The deliverables from the operation of this pilot plant [when fully equipped with the downstream process units] will be firstly the liquid FT products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. The facility will produce research quantities of FT liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by FT Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels - will be a primary research objectives. Such a facility has required significant lead time for environmental review, architectural/building construction, and EPC services. UK, with DOE support, has advanced the facility in several important ways. These include: a formal EA/FONSI, and permits and approvals; construction of a building; selection of a range of technologies and vendors; and completion of the upstream process units. The results of this project are the FEED and detailed engineering studies, the alternate configurations and the as-built plant - its equipment and capabilities for future research and demonstration and its adaptability for re-purposing to meet other needs. These are described in some detail in this report, along with lessons learned.

01 COAL, LIGNITE, AND PEAT↗

Autonomous construction agents: An investigative framework for large sensor network self-management

Recent technological advances have made it cost effective to utilize massive, heterogeneous sensor networks. To gain appreciable value from these informational systems, there must be a control scheme that coordinates information flow to produce meaningful results. This paper will focus on tools developed to manage the coordination of autonomous construction agents using stigmergy, in which a set of basic low-level rules are implemented through various environmental cues. Using VE-Suite, an open-source virtual engineering software package, an interactive environment is created to explore various informational configurations for the construction problem. A simple test case is developed within the framework, and construction times are analyzed for possible functional relationships pertaining to performance of a particular set of parameters and a given control process. Initial experiments for the test case show sensor saturation occurs relatively quickly with 5-7 sensors, and construction time is generally independent of sensor range except for small numbers of sensors. Further experiments using this framework are needed to define other aspects of sensor performance. These trends can then be used to help decide what kinds of sensing capabilities are required to simultaneously achieve the most cost-effective solution and provide the required value of information when applied to the development of real world sensor applications.

97 MATHEMATICS AND COMPUTING↗

Appendix F New Construction and Replacement of Existing Facilities at Sandia National Laboratories New Mexico

A number of construction and demolition projects are planned for the 10-year period evaluated in this Sandia National Laboratories, New Mexico (SNL/NM) site-wide environmental impact statement (SWEIS). Construction and decommissioning and demolition (D&D) activities are continually being accomplished at SNL/NM as new facilities are brought on line to replace older, less efficient facilities. The construction and D&D projects presented in this appendix are projected to take place, assuming funding and administrative/regulatory approvals are obtained, under both the No Action Alternative and the Expanded Operations Alternative. Under the Reduced Operations Alternative, no new construction projects were assumed to take place, and D&D activities were assumed to be limited to those needed to maintain a safe operating environment on the site.

42 ENGINEERING↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL-Richland Campus: North Campus Construction (Rev. 3)

Starting in fiscal year 2023, the north area of the PNNL-Richland Campus will undergo development. Initially, infrastructure (water, electrical) improvements will be installed. Later development includes the construction of several new office buildings. The area to be developed currently contains no buildings but does have two existing solar-powered ambient air sampling stations. Under the requirements of Washington State Department of Health Radioactive Air Emissions License -005, the PNNL-Richland Campus must operate and maintain a radiological air monitoring program. This revision documents and evaluates how the new North Campus construction impacts ambient air surveillance stations within the development region. This revision also considers current stack configurations and uses an updated environmental dispersion model and updated meteorological data. The DQO team concluded that one sampling station in the construction area will be relocated and the other remain in place. The evaluations conducted for this DQO also identified a third sampling station outside the development area that is recommended for relocation as a result of updated dispersion modeling. Recommended sites for the relocations are presented. Considerations for sampling in and around a construction zone are also addressed. Additionally, programmatic improvements to the ambient air sampling program were identified in the DQO process.

54 ENVIRONMENTAL SCIENCES↗

Improved digital construction binder solution utilizing calcium aluminate additive for Infrastructure Scale Additive Manufacturing

Oak Ridge National Laboratory (ORNL) worked with Kerneos Inc., a Division of Imerys USA, Inc. to develop an improved digital construction binder using calcium aluminate additives produced by Kerneos along with locally available concrete materials. When the two-stage (2K) binder formulation was added to commercially available Portland Limestone Cement and sand to form a digital construction mortar, its strength exceeded a number of commercially available digital construction binders both at early and later ages. At the same time, the developed formulation showed precise control of setting time after addition and showed very low shrinkage making it a strong, reliable, and easily customizable alternative to fixed proprietary digital construction binders.

36 MATERIALS SCIENCE↗

Light, High Performance and Scalable Coal-Derived Composites for Construction: Precast and Cast-in-Place Applications

The overall objective of this project was to produce a coal-based construction material that has up to ~95 weight percent (wt. %) coal with physical, chemical, and thermal properties exceeding those of ordinary Portland cement (OPC)-based construction materials. Additionally, the project aimed to minimize external binders by implementing novel mixing techniques, while exceeding the performance/cost ratio of OPC. Finally, the project was to demonstrate production of precast products via the design and fabrication of products via a bench scale process. Consistent with some of these objectives, the project successfully fabricated samples of coal-based composite materials with >80 wt% coal with physical, chemical and thermal properties on par with cement-based concrete. Select samples demonstrated compressive strengths with >7,000 psi and flexural strength of >420 psi. The composite materials minimized external binders and also demonstrated durability, as evidenced by resistance to acidic and basic solutions. Finally, larger slab and beam type samples were produced using a process developed by the Recipient, although, the process was not semicontinuous in nature. Taken together, the results of this project suggest that domestic coal has potential to serve as a replacement for cementitious materials utilized in incumbent construction technologies, which could significantly reduce the energy and emissions of the construction industry

01 COAL, LIGNITE, AND PEAT↗

Development of High Throughput Process for Constructing 454 Titanium and Illumina Libraries

We have developed two processes with the Biomek FX robot to construct 454 titanium and Illumina libraries in order to meet the increasing library demands. All modifications in the library construction steps were made to enable the adaptation of the entire processes to work with the 96-well plate format. The key modifications include the shearing of DNA with Covaris E210 and the enzymatic reaction cleaning and fragment size selection with SPRI beads and magnetic plate holders. The construction of 96 Titanium libraries takes about 8 hours from sheared DNA to ssDNA recovery. The processing of 96 Illumina libraries takes less time than that of the Titanium library process. Although both processes still require manual transfer of plates from robot to other work stations such as thermocyclers, these robotic processes represent about 12- to 24-folds increase of library capacity comparing to the manual processes. To enable the sequencing of many libraries in parallel, we have also developed sets of molecular barcodes for both library types. The requirements for the 454 library barcodes include 10 bases, 40-60percent GC, no consecutive same base, and no less than 3 bases difference between barcodes. We have used 96 of the resulted 270 barcodes to construct libraries and pool to test the ability of accurately assigning reads to the right samples. When allowing 1 base error occurred in the 10 base barcodes, we could assign 99.6percent of the total reads and 100percent of them were uniquely assigned. As for the Illumina barcodes, the requirements include 4 bases, balanced GC, and at least 2 bases difference between barcodes. We have begun to assess the ability to assign reads after pooling different number of libraries. We will discuss the progress and the challenges of these scale-up processes.

59 BASIC BIOLOGICAL SCIENCES↗

Orbital construction demonstration study. Volume 1: Executive summary

A conceptual design and program plan for an Orbital Construction Demonstration Article (OCDA), that can be used for technology growth and verification, and as the construction facility for a variety of large structures is presented. The OCDA design includes a large work platform, a rotating manipulator boom, a 250 kw solar array, and a core module of subsystems with a total mass of 37,093 kg, that can be assembled in three shuttle flights. An analysis of OCDA continued utility potential indicates that a shuttle tended platform with 250 kW of power can effectively be used to construct highly beneficial antenna systems and large demonstration articles that advance solar power satellite technologies. The construction of 100 m parabolic reflectors for use as a radiometer for measuring soil moisture and water salinity was found to be within the capabilities of OCDA concept. With 252 fixed beams for high population centers, and 16 scanning beams for rural areas, the antenna has the potential to significantly improve U.S. space based communications systems. The OCDA, that is slightly increased in size, was found adequate to build a large 2 MW solar array which, when coupled to a transmit antenna, demonstrate power transfer from space to ground.

Source record↗

Space construction base support requirements for environmental control and life support systems

A Space Station analysis study is being performed for NASA which identifies cost-effective Space Station options that can provide a space facility capable of performing space construction, space manufacturing, cosmological research, earth services, and other functions. A space construction base concept for the construction of large structures, such as those needed to implement satellite solar power for earth usage, will be used as a basis for discussing requirements that impact the design selection, level of integration, and operation of environmental control and life support systems (ECLSS). The space construction base configuration also provides a basic Space Station facility that can accommodate biological manufacturing modules, ultrapure glasses manufacturing modules, and modules for other services in a building-block fashion. Examples of special problems that could dictate hardware required to augment the basic ECLSS for autonomous modules will be highlighted. Additionally, overall intravehicular (IVA) and extravehicular (EVA) activities and requirements that could impact the basic station ECLSS degree of closure are discussed.

Thiele, R. J.↗

Space power stations - Space construction, transportation, and pre-development, space project requirements

Several features of solar energy space power stations are discussed. An end-to-end analysis of a system using silicon solar cells is reviewed, and the merits of construction in low earth orbit and in geosynchronous orbit are compared. A suggested space construction procedure, described in detail, would use a 'beam builder', an automated machine, to fabricate the first sublevel truss structural members from strip stock material that is stored on reels. An assembly jig would then be used to position a number of beam builders in the proper location and to support the beams as they are produced to facilitate joining them to form the final space power station structure. Space projects for evaluating the construction concept are proposed, and a possible space construction sequence is considered. Space transportation that would be required in conjunction with the space power station is described.

Piland, R.↗

Space construction system analysis. Part 2: Platform definition

The top level system requirements are summarized and the accompanying conceptual design for an engineering and technology verification platform (ETVP) system is presented. An encompassing statement of the system objectives which drive the system requirements is presented and the major mission and subsystem requirements are described with emphasis on the advanced communications technology mission payload. The platform design is defined and used as a reference configuration for an end to space construction analyses. The preferred construction methods and processes, the important interactions between the platform design and the construction system design and operation, and the technology development efforts required to support the design and space construction of the ETVP are outlined.

Hart, R. J.↗

Space construction technology needs

Space construction systems made feasible by an operational Space Shuttle are discussed with a view toward assembly, installation and construction support equipment. The level of construction capability will be reflected in the number of launches to accomplish a certain mission, either in terms of the mission time line or on the density of packaging in the Orbiter payload bay. It is noted that the development of construction support equipment in zero-gravity simulations should be the most productive initial activity. Crew EVAs, as well as the beam builder, cherrypicker and power distribution buses are covered in detail.

Jenkins, L. M.↗

SPS construction perspective. Summary

Projections concerning the general construction requirements for a solar power satellite (SPS) are summarized. It is recognized that the ability to construct an SPS must be developed through an evolutionary process. This process would begin with shuttle operations and when construction timelines exceed the shuttle capability, small manned bases in low Earth orbit (LEO) would be used. The influence of construction methods on design, assembly bases, and crew considerations are addressed.

Benson, H.↗

Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

Brown, J. A.↗

On the construction of the Voronoi mesh on a sphere

The primary feature of the novel construction of the Voronoi (1908) mesh presented is the algorithm's adding of points one-at-a-time, until the final mesh is achieved. The addition of one point to an existing Voronoi mesh of K points means that only local changes are needed to construct a mesh of K + 1 points; this construction is especially suited to time-dependent problems in virtue of the ability to reduce the construction to O(N) operations when configurations are close, while the algorithm does not break down in cases of configurations that are far apart. Illustrative numerical experiments substantiate the O(N) operation count for a typical case.

Augenbaum, J. M.↗