The Value of Day-Ahead Coordination of Power and Natural Gas Network Operations
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
The aim of this paper is to show the importance and applicability of non-self-adjoint operators for description of observables both in relativistic and nonrelativistic quantum mechanics, as well as in quantum electrodynamics. The paper considers (i) a maximally Hermitian (but non-self-adjoint) time operator in nonrelativistic quantum mechanics and in quantum electrodynamics and (ii) the problem of defining the four-dimensional coordinate and momentum operators describing relativistic particles with zero spin (each of these operators contains both Hermitian and anti-Hermitian parts). Some other applications of non-selfadjoint and non-Hermitian operators in physics are analyzed as well. The paper ends with an analysis of a few cases of T -non-invariant interactions, including quantum dissipation and nuclear optical potentials.
The Nowcast of Aerospace Ionizing RAdiation System (NAIRAS) model is a real-time, global, physics-based model originally developed to predict exposure from cosmic radiation to air travelers from both galactic and solar sources. A prototype operational NAIRAS model has provided tabular and graphical data products via its public web site for about ten years. A new version of the NAIRAS model has been developed that incorporates an extension of the model domain from the atmospheric ionizing radiation environment to the space radiation environment, with the addition of the trapped inner belt proton source and altitude-dependent and rigidity-dependent geomagnetic shielding of the galactic cosmic rays (GCR) and solar energetic particle (SEP) protons. New output products of differential and integral particle flux have been developed for the characterization of single-event effects (SEE), expanding the application of NAIRAS from human radiation exposure assessment to allowing end-users to quantify radiation environment risks to aviation and spacecraft microelectronic systems. The NAIRAS model has transitioned to prototype operations at the Community Coordinated Modeling Center (CCMC) where the model now operates in two modes: (1) real-time global predictions of the atmospheric radiation environment and (2) a run-on-request (RoR) service allowing the user to select a specific time period for the global dosimetric calculations, or to upload an aircraft, balloon, or spaceflight trajectory file to provide predictions of the dosimetric and particle flux quantities along the flight path. The new features of NAIRAS version 3.0 are described in this paper and example results of the new output products for low-Earth orbit (LEO), medium-Earth orbit (MEO), and free-space radiation environments are presented
As the airspace becomes increasingly shared by autonomous small Unmanned Aerial Systems (UAS), there would be a pressing need for coordination strategies so that aircraft can safely and independently maneuver around obstacles, geofences, and traffic aircraft. Explicitly coordinating resolution strategies for small UAS would require additional components such as a reliable vehicle-to-vehicle communication infrastructure and standardized protocols for information exchange that could significantly increase the cost of deploying small UAS in a shared airspace. This paper explores a novel approach that enables multiple aircraft to implicitly coordinate their resolution maneuvers. By requiring all aircraft to execute the proposed approach deterministically, it is possible for all of them to implicitly agree on the region of airspace each will be occupying in a given time interval. The proposed approach lends itself to the construction of a suitable feedback mechanism that enables the real-time execution of an implicitly conflict-free path in a closed-loop manner dealing with uncertainties in aircraft speed. If a network infrastructure is available, the proposed approach can also exploit the benefits of explicit information.
Water is one of our most important natural resources and is essential to our national economy and security. Multiple federal government agencies have mission elements that address national needs related to water. Each water-related agency champions a unique science and/or operational mission focused on advancing a portion of the nation’s ability to meet our water-related challenges. These diverse mission needs have engendered a rich and extensive base of water-related data and modeling capabilities. While useful for their intended purposes, these capabilities are not well integrated to address complex regional problems and overarching national problems. These major investments by a number of federal agencies, however, lay the foundation for an integrated hydro-terrestrial modeling and data infrastructure that will enhance knowledge, understanding, prediction, and management of the nation’s diverse water challenges. Creating a more seamless national hydro-terrestrial modeling and data capacity presents an enormous opportunity to advance operational as well as research capabilities leading to more effective water management. Advances are necessary not only in operational tools for forecasting but also in research to identify and resolve knowledge and data gaps that lead to unacceptable uncertainties in forecast outcomes. As such, close coordination across scientific, operational, and resource management communities is required. To this end, an interagency workshop on “Integrated Hydro-Terrestrial Modeling: Development of a National Capacity” was held at the National Science Foundation (NSF) headquarters in Alexandria, Virginia in September 2019, led jointly by the NSF, the U.S. Department of Energy (DOE) and the U.S. Geological Survey (USGS) and with broader interagency support provided through an interagency steering committee. This workshop provided a venue to bring together representatives of water-related agencies and their scientific partners (including university researchers) to initiate and refine a vision for a national Integrated Hydro-Terrestrial Modeling (IHTM) and data infrastructure and advance ideas towards its development. The workshop was designed to address three critical foci to advance the development of a national IHTM capacity: “Priority Water Challenges” around which to motivate and initiate development; Technical and methodological obstacles related to data and modeling; Organizational, structural, and cultural barriers that heretofore have impeded integration of capabilities across the federal and research landscapes. The following “Priority Water Challenge” domain areas represent targets for initiating development of the IHTM and were identified and selected in alignment with priorities of the administration’s Water Sub-Cabinet: (1) Nutrient loading, hypoxia, and harmful algal blooms; (2) Water availability in the western United States; and (3) Extreme weather-related water hazards. These water challenges span agency mission boundaries and encompass a broad range of geographies, complex system dynamics and feedbacks, and critical processes spanning hydrological, climatic, and biophysical systems as well as land-use/land-cover, agricultural, built infrastructure, societal, economic, and decisional environments. These three Priority Water Challenges cannot be fully addressed without leveraging complementary and synergistic capabilities across multiple agencies.
A full-scale, operational implementation of the opportunistic hybrid communications systems for distributed photovoltaic (PV) coordination was successfully developed, simulated, and validated in this 3-year project. The system is considered hybrid because it uses different communications pathways from the scale of residential PV inverters to a transmission network; primary technologies harnessed include Low-Power Wireless Personal Area Network (LoWPAN), Power Line Communication (PLC), WiFi mesh, Worldwide Interoperability for Microwave Access (WiMAX), Ethernet cable, and Optical Ethernet systems. It is opportunistic in that it chooses to route messages through each of these systems based on recent data about latency and availability to ensure reliable message passing.
The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim
This paper identifies and evaluates issues in traditional resource adequacy (RA) assessment practices, and how adjusting these practices may affect and depend on existing institutional arrangements for planning and procurement. The paper proposes a technical-institutional roadmap that would allow regulators in vertically-integrated jurisdictions and system planners and operators in restructured jurisdictions to revise RA practices across a range of components. First, we compile a critical review of current RA assessment practices based on (1) interviews with RA practitioners and (2) a review of recent technical literature. We find that (i) RA may need to expand beyond capacity adequacy to ensure energy adequacy – relevant for energy-limited resources such as storage – and potentially some form of ancillary service adequacy (e.g. enough ramping-up and ramping-down capability in the system); (ii) chronological hourly simulations for all hours in the year are the current best practice; (iii) metrics and models used do not reflect economic criteria in system operation and loss of load; and (iv) there is a need to improve representation of weather dependencies and weather data. Second, we review planning and RA reports for several private and public entities that plan generation and/or transmission infrastructure in the continental U.S. to look for existing practices involving resilience assessments. We find no systematic treatment of the costs of extreme weather and other hazards, the benefits of resilience, and resilience metrics in planning analyses and no systematic treatment of resilience metrics, methods, and outcomes for resource adequacy purposes. Third, we create a technical framework for probabilistic RA assessment and use it to study how key choices about how to model power system operations affect the values that are obtained for RA metrics. We find that (i) non-economic dispatch schemes that ignore economic objectives can lead to accurate RA assessments when coordinated with detailed operational strategies; (ii) multi-year data is critical to capture a wide variety of system conditions; (iii) not incorporating transmission limits into RA assessment could lead to substantial underestimation of traditional “expected value” RA metrics; and (iv) new RA metrics that capture event-specific shortfall characteristics should be used as supplements to traditional metrics. Finally, we examine RA assessments and use this information to propose a guide of evolving industry standards for resource adequacy assessments in resource planning and transmission planning. We report minimum, best, and frontier practices for temporal resolution of assessments, metrics and targets, weather data, load forecasting, characterization of variable renewable resources, characterization of transmission and market transactions, RA modeling and integration with planning processes, and capacity accreditation.
NASA’s vision for Advanced Air Mobility (AAM) is to help emerging aviation markets to safely develop an air transportation system that moves people and cargo between places previously not served or underserved by aviation using revolutionary new aircraft types. Urban Air Mobility (UAM), the concept of expanding transportation networks by serving short flights to transport people and goods around metropolitan areas, is part of a larger paradigm shift toward AAM, in which new technologies and business models are enabling transformational applications of aviation. In NASA’s Concept of Operations for UAM, Providers of Services for UAM (PSU) play a key role to enable safe and efficient UAM operations by sharing operational data among UAM operators. PSUs provide a pre-departure strategic conflict management service that establishes operational plans for new flights and coordinates them with all relevant operations in shared airspace. The strategic conflict management aims to minimize the need for tactical separation provision, while considering anticipated traffic demand, vertiport capacity and availability, forecasted weather, and airspace restrictions. NASA is currently preparing a new lab evaluation activity with aviation industry partners, called the X4 simulation, to demonstrate their airspace services and capabilities and test new information exchange requirements for UAM operations. This simulation activity will support NASA’s National Campaign (NC) flight tests which are planned over the next several years to guide the collective community and stakeholders through a series of scenario-based test activities that involve vehicles and airspace management services operating in a live test environment. This presentation will provide an overview of the X4 simulation, including objectives, scenarios, assumptions, system architecture, and test schedule. The X4 simulation will evaluate the interconnectivity and operational intent sharing between PSUs for multiple operators, as well as the performance of strategic conflict management.
The Savannah River Site (SRS) Saltstone Disposal Facility (SDF) is used to dispose of low-level radioactive liquid waste in the form of grout. The SDF is comprised of a series of concrete saltstone disposal units (SDUs) that receive the grout. The grout solidifies into a cementitious waste form known as saltstone. Properties of saltstone that influence contaminant release have been measured on simulant material but not on samples of emplaced saltstone because samples of emplaced radioactive saltstone are difficult to obtain, transport, and store in a manner that protects the properties of interest. Savannah River Remediation (SRR) initiated a project to obtain samples of emplaced saltstone such that the two critical properties, hydraulic conductivity and reduction capacity, are negligibly impacted by the sample collection effort. The sample collection project was established to manage sample collection efforts beginning with sample collection mock-up activities through field execution. The project focused on three phases: mock-up in a clean environment, development of equipment needed to maintain an inert environment during sample transport and laboratory storage, and coordination of Facility operations and support resources and schedules to support sample collection. A mock-up facility was constructed at SRS to mimic the SDU. Core drill equipment was tested, procedures developed, and operator training conducted using the mockup facility. Concurrent with mock-up activities, inert transportation and storage equipment was designed, manufactured, tested, and specific operating instruction included in the sample collection procedure. Inerting equipment minimized oxidation from the atmosphere as the samples were removed from the disposal unit, transported, and stored in the laboratory awaiting analysis. Coordination with the Saltstone Facility began during construction of the mock-up platform to collect current as-built information for platform construction. Baseline data was collected from the disposal unit vapor space to assess the potential for personnel exposure from chemical hazards associated with trapped vapors. Based on this data, mitigating actions were incorporated into the project scope. Finally, project and facility schedules were integrated to assure that facility non-processing windows, support personnel, equipment fabrication, and field preparation activities were in alignment and supportive of the overall sample collection objectives. During May 2014, 485 linear cm of approximately 5 cm diameter radioactive core material was successfully collected from three access ports in SDU Cell 2A, inerted, transported to the laboratory, and stored in an inert environment for analysis. (authors)
Given a set of pairwise object distances and a dimension $k$, FastMap and RobustMap algorithms compute a set of $k$-dimensional coordinates for the objects. These metric space embedding methods implicitly assume a higher-dimensional coordinate representation and are a sequence of translations and orthogonal projections based on a sequence of object pair selections (called pivot pairs). We develop a matrix computation viewpoint of these algorithms that operates on the coordinate representation explicitly using Householder reflections. The resulting Coordinate Mapping Algorithm (CMA) is a fast approximate alternative to truncated principal component analysis (PCA) and it brings the FastMap and RobustMap algorithms into the mainstream of numerical computation where standard BLAS building blocks are used. Motivated by the geometric nature of the embedding methods, we further show that truncated PCA can be computed with CMA by specific pivot pair selections. Describing FastMap, RobustMap, and PCA as CMA computations with different pivot pair choices unifies the methods along a pivot pair selection spectrum. We also sketch connections to the semi-discrete decomposition and the QLP decomposition.
The Integrated Science Investigation of the Sun (ISIS) is a complete science investigation on the Solar Probe Plus (SPP) mission, which flies to within nine solar radii of the Sun's surface. ISIS comprises a two-instrument suite to measure energetic particles over a very broad energy range, as well as coordinated management, science operations, data processing, and scientific analysis. Together, ISIS observations allow us to explore the mechanisms of energetic particles dynamics, including their: (1) Origins-defining the seed populations and physical conditions necessary for energetic particle acceleration; (2) Acceleration-determining the roles of shocks, reconnection, waves, and turbulence in accelerating energetic particles; and (3) Transport-revealing how energetic particles propagate from the corona out into the heliosphere. The two ISIS Energetic Particle Instruments measure lower (EPI-Lo) and higher (EPI-Hi) energy particles. EPI-Lo measures ions and ion composition from approx. 20 keV/nucleon-15 MeV total energy and electrons from approx.25-1000 keV. EPI-Hi measures ions from approx. 1-200 MeV/nucleon and electrons from approx. 0.5-6 MeV. EPI-Lo comprises 80 tiny apertures with fields-of-view (FOVs) that sample over nearly a complete hemisphere, while EPI-Hi combines three telescopes that together provide five large-FOV apertures. ISIS observes continuously inside of 0.25 AU with a high data collection rate and burst data (EPI-Lo) coordinated with the rest of the SPP payload; outside of 0.25 AU, ISIS runs in low-rate science mode whenever feasible to capture as complete a record as possible of the solar energetic particle environment and provide calibration and continuity for measurements closer in to the Sun. The ISIS Science Operations Center plans and executes commanding, receives and analyzes all ISIS data, and coordinates science observations and analyses with the rest of the SPP science investigations. Together, ISIS' unique observations on SPP will enable the discovery, untangling, and understanding of the important physical processes that govern energetic particles in the innermost regions of our heliosphere, for the first time. This paper summarizes the ISIS investigation at the time of the SPP mission Preliminary Design Review in January 2014.
Nowadays, a significant number of distribution systems are facing problems to accommodate more photovoltaic (PV) capacity, namely due to the overvoltages during the daylight periods. This has an impact on the private investments in distributed energy resources (DER), since it occurs exactly when the PV prices are becoming attractive, and the opportunity to an energy transition based on solar technologies is being wasted. In particular, this limitation of the networks is a barrier for larger consumers, such as commercial and public buildings, aiming at investing in PV capacity and start operating as microgrids connected to the MV network. To address this challenge, this paper presents a coordinated approach to the microgrid investment and planning problem, where the system operator and the microgrid owner collaborate to improve the voltage control capabilities of the distribution network, increasing the PV potential. The results prove that this collaboration has the benefit of increasing the value of the microgrid investments while improving the quality of service of the system and it should be considered in the future regulatory framework.
The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.
Advances in technologies across multiple areas have spurred the motivation and development of new entrants and use cases for the national airspace system to accommodate. The stratosphere, encompassing Upper Class E airspace, is of particular interest due to the types of aircraft that can operate there and the unique missions that can be carried out. The diversity of aircraft that plan to operate and the long durations envisioned presents a challenge for the management of that airspace in a manner that does not burden the current paradigm of air traffic service provision. Upper Class E Traffic Management (ETM) is an approach pioneered by NASA and FAA to enable the cooperative management of high-altitude airspace through operations in cooperative areas facilitated by information exchanges and coordination based on common operating practices. NASA has developed, implemented, and commenced initial tests of the underlying systems and architecture to enable ETM operations. The implementation is the first of its kind and meant to serve as a reference for broader adoption. This paper will present the architecture and details of the system components as well as how it has been implemented for the test. Summary results of initial connectivity tests are included to highlight the functionality of the ETM system, which provides the path forward for more complex operations and interactions at a greater scale.
The creation of a crew-rated spacecraft architecture capable of sending humans to Mars requires the development and integration of multiple vehicle systems and subsystems. Important new technologies will be identified and matured within each technical discipline to support the mission. Architecture maturity also requires coordination with mission operations elements and ground infrastructure. During early architecture formulation, many of these assets will not be co-located and will required integrated, distributed test to show that the technologies and systems are being developed in a coordinated way. When complete, technologies must be shown to function together to achieve mission goals. In this presentation, an architecture will be described that promotes and advances integration of disparate systems within JSC and across NASA centers.
Some aspects of the interpretation of quantum theory are discussed. It is emphasized that quantum theory is formulated in the Cartesian coordinate system; in other coordinates the result obtained with the help of the Hamiltonian formalism and commutator relations between 'canonically conjugated' coordinate and momentum operators leads to a wrong version of quantum mechanics. The origin of time is analyzed by the example of atomic collision theory in detail; it is shown that the time-dependent Schroedinger equation is meaningless since in the high-impact-energy limit it transforms into an equation with two time-like variables. Following the Einstein-Rozen-Podolsky experiment and Bell's inequality, the wave function is interpreted as an actual field of information in the elementary form. The concept 'measurement' is also discussed.
The United States and Canada power systems are not isolated. Cross-border transmission and coordination of system operation create an interconnected power system, which results in combined imports and exports of electricity of greater than 70 TWh per year [1]. Currently, over 5 GW of new international transmission lines are in various stages of permitting and development. These lines may enable greater integration and coordination of the U.S. and Canada systems, which can in turn reduce challenges associated with integration of high penetrations of variable renewables. Furthermore, low-cost Canadian resources, such as wind and hydro, could contribute to compliance with the EPA's recently released Clean Power Plan. Improving integration and coordination internationally will reduce the costs of accessing these resources. This analysis work build on previous work by Ibanez and Zinaman [2]. In this work we seek to better understand the value of additional interconnection between the U.S. and Canadian power systems. Specifically, we quantify the value of additional interconnection and coordination within the Canadian-US integrated power system under scenarios in which large reductions (>80%) in power sector CO2 emissions are achieved. We explore how the ability to add additional cross-border transmission impacts capacity investment, the generation mix, system costs, and the ability of the system to integrate variable renewable energy into the power system. This analysis uses the Regional Energy Deployment System (ReEDS) capacity expansion model [3], [4] to quantify the value of the integrated power system expansion of the United States and Canada. ReEDS is an optimization model that assesses the deployment and operation (including transmission) of the electricity sector of the contiguous United States and Canadian provinces from 2016 through 2050. It has the ability to model the integration of renewable energy technologies into the grid. ReEDS captures renewable energy resources through the use of 356 individual resource regions and 134 balancing areas across the U.S. and is able to handle renewable energy issues such as variability in wind and solar output, transmission costs and constraints, and ancillary services requirements.