Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Implementation of a standard format for GPS common view data

A new format for standardizing common view time transfer data, recommended by the Consultative Committee for the Definition of the Second, is being implemented in receivers commonly used for contributing data for the generation of International Atomic Time. We discuss three aspects of this new format that potentially improve GPS common-view time transfer: (1) the standard specifies the method for treating short term data, (2) it presents data in consistent formats including needed terms not previously available, and (3) the standard includes a header of parameters important for the GPS common-view process. In coordination with the release of firmware conforming to this new format the Bureau International des Poids et Mesures will release future international track schedules consistent with the new standard.

Weiss, Marc A.↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

Reinforcement Learning to Enhance Optimal Operation of Resilient Community Energy Systems

This paper presents a novel model-free multi-agent Reinforcement Learning (RL) control method to enhance the resilience of community energy systems in island mode, which coordinates multiple objectives without the necessity of identifying system models that require expert knowledge. Specifically, a community-level coordinator agent is designed to allocate renewable energy resources among different buildings, and multiple building-level agents are developed to optimize load schedules based on limited energy resources and requirements of building loads and occupants’ comfort. In a two-day evaluation, our RL approach demonstrated a similar performance against MPC without requiring system models and formulation of optimization problems as required in MPC.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

A Task Based Approach for Co-Scheduling Ensemble Workloads on Heterogeneous Nodes

Scientific workflows consist of multiple, connected applications, with data and results flowing from one to another in a pipeline. Traditionally, such workflows are executed in sequential order, storing intermediate data in storage disks. Co-scheduling application workflows concurrently on the same compute nodes would greatly reduce the cost of moving data to/from storage and allow real-time analysis of intermediate results. Nevertheless, most parallel programming runtimes do not allow seamless integration of various applications in a scientific workflow, in part due to the complexity of managing data and resources. The situation is even more complicated for heterogeneous systems. In this work we extend the Minos Computing Library (MCL) runtime to accelerate pipe-lined and parallel workloads where multiple applications are running in the same system. MCL’s asynchronous task library and runtime dynamically manages resources to allow co-scheduling of multiple processes sharing heterogeneous resources. In addition, we design a custom ex- tension of the Open Compute Language (OpenCL) to enable multiple processes to share device memory. We enable MCL to coordinate these shared buffers to allow for easy, fast data sharing between applications. Using malleable micro-benchmarks and two application workflows that combine scientific simulation and AI-based analysis, we show that our method outperforms traditional approaches.

Index Terms—Parallel systems, Scheduling and Task ↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Differential Very Long Baseline Interferometry for 50 nanoradian deep space navigation - Results from quasar pair experiments

Deep space tracking experiments completed at JPL have demonstrated a 50-nanoradian angular positioning accuracy with wideband differential Very Long Baseline Interferometry (delta VLBI). This meets the stringent navigation requirements of NASA's Galileo mission, scheduled for launch in May 1986 and for encounter with Jupiter in December 1988. Pairs of extragalactic radio sources (quasars) with well-known coordinates were used to simulate deep space navigation passes in which quasar-spacecraft pairs are observed. This paper discusses the accuracy of the delta VLBI technique and how it is affected by source separations, source elevations, source strengths, solar plasma and ionosphere. Several observation strategies are discussed and one is shown to be especially effective in minimizing these major error sources.

Trinkle, B. K.↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require the project team to integrate a variety of contributions from NASA centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the HDU from conception in June 2009 to rollout for operations in July 2010, the HDU team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of HDU and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU. A coordinated effort to establish simplified Computer Aided Design standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations.

Kennedy, Kriss J.↗

A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

42 ENGINEERING↗

Dynamic Multi-Sensor Multi-Mission Optimal Planning Tool

Remote sensing systems have firmly established a role in providing immense value to commercial industry, scientific exploration, and national security. Continued maturation of sensing technology has reduced the cost of deploying highly-capable sensors while at the same time increased reliance on the information these sensors can provide. The demand for time on these sensors is unlikely to diminish. Coordination of next-generation sensor systems, larger constellations of satellites, unmanned aerial vehicles, ground telescopes, etc. is prohibitively complex for existing heuristics-based scheduling techniques. The project was a two-year collaboration spanning multiple Sandia centers and included a partnership with Texas A&M University. We have developed algorithms and software for collection scheduling, remote sensor field-of-view pointing models, and bandwidth-constrained prioritization of sensor data. Our approach followed best practices from the operations research and computational geometry communities. These models provide several advantages over state of the art techniques. In particular, our approach is more flexible compared to heuristics that tightly couple models and solution techniques. First, our mixed-integer linear models afford a rigorous analysis so that sensor planners can quantitatively describe a schedule relative to the best possible. Optimal or near-optimal schedules can be produced with commercial solvers in operational run-times. These models can be modified and extended to incorporate different scheduling and resource constraints and objective function definitions. Further, we have extended these models to proactively schedule sensors under weather and ad hoc collection uncertainty. This approach stands in contrast to existing deterministic schedulers which assume a single future weather or ad hoc collection scenario. The field-of-view pointing algorithm produces a mosaic with the fewest number of images required to fully cover a region of interest. The bandwidth-constrained algorithms find the highest priority information that can be transmitted. All of these are based on mixed-integer linear programs so that, in the future, collection scheduling, field-of-view, and bandwidth prioritization can be combined into a single problem. Experiments conducted using the developed models, commercial solvers, and benchmark datasets have demonstrated that proactively scheduling against uncertainty regularly and significantly outperforms deterministic schedulers.

47 OTHER INSTRUMENTATION↗

Framework for Architecture Trade Study Using MBSE and Performance Simulation

Increasing complexity in modern systems as well as cost and schedule constraints require a new paradigm of system engineering to fulfill stakeholder needs. Challenges facing efficient trade studies include poor tool interoperability, lack of simulation coordination (design parameters) and requirements flowdown. A recent trend toward Model Based System Engineering (MBSE) includes flexible architecture definition, program documentation, requirements traceability and system engineering reuse. As a new domain MBSE still lacks governing standards and commonly accepted frameworks. This paper proposes a framework for efficient architecture definition using MBSE in conjunction with Domain Specific simulation to evaluate trade studies. A general framework is provided followed with a specific example including a method for designing a trade study, defining candidate architectures, planning simulations to fulfill requirements and finally a weighted decision analysis to optimize system objectives.

Ryan, Jessica↗

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

Future SAR Imaging Systems: Goals, Plans, Challenges and Opportunities

Synthetic Aperture Radar (SAR) Earth observation data are becoming increasingly ubiquitous as new spaceborne systems become operational and their data are made available to scientists and applications users. The characteristic of active sensors like SAR to be able to observe Earth independent of weather or solar illumination, coupled with regular data acquisition, fosters reliability and encourages the investment in algorithm and product development toward a beneficial result. As SAR systems typically contain proprietary or nationally important technologies, civilian SAR systems are typically developed with a national focus, or in the case of the European Union, with the Union’s focus. As a result, when viewed from a global perspective, SAR programs can be generally viewed as independent developments, each with their own requirements, schedules, development approaches, and data policies. At the same time, these systems can be expensive, and particularly in an era of increasingly open data policies, coordination of programs could reduce redundancy in observations, increase sampling density and measurement diversity, and improve dependability of data streams in the long term. Since 2018, agency representatives from NASA, ESA, DLR, JAXA, ISRO, ASI, and CONAE have been evaluating the possibilities for programmatic and technical coordination of future SAR systems, data sharing, and scientific exploitation. In this paper, we describe the work in discovering trends and possibilities associated with flight systems, by evaluating current and future plans for SAR systems around the world, and identifying opportunities for coordination.

Zink, Manfred↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Scheduling Architecture for Multi-Center Time-Based Metering

The Traffic Management Advisor (TMA) is an air traffic control automation system currently in use in seven Air Route Traffic Control Centers (ARTCCs) to enable time based metering to busy airports within their airspace. However, this system is limited to operation within a single ARTCC, within about a 200 nautical mile radius of the airport, and on relatively simple streams of traffic. The need for coordinated metering within a greater (300+ nautical mile) radius of an airport, on streams of traffic with significant branching, and across ARTCC boundaries, has been identified. Early tests revealed that TMA could not simply be scaled up to handle such a problem. Instead, a loosely coupled hierarchy of schedules, in which constraints from downstream schedules are passed upstream, is required. Such an architecture reduces the reliance on distant projections of arrival times, making schedules robust to changes in sequence and to additions of aircraft (such as aircraft departing inside the system s scheduling horizon). This architecture is also scaleable, easily reconfigurable, and can be networked together. As such, it can be adapted for use in any size or configuration of airspace and with any number of airports delivering restrictions. An implementation of this distributed scheduling architecture is currently undergoing testing in the TMA-Multi Center system. This paper describes the architecture and its motivation.

Landry, Steven↗