Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

SPS construction perspective. Summary

Projections concerning the general construction requirements for a solar power satellite (SPS) are summarized. It is recognized that the ability to construct an SPS must be developed through an evolutionary process. This process would begin with shuttle operations and when construction timelines exceed the shuttle capability, small manned bases in low Earth orbit (LEO) would be used. The influence of construction methods on design, assembly bases, and crew considerations are addressed.

Benson, H.↗

Space Station Freedom program. Commercial infrastructure and technology utilization

The following topics are presented in viewgraph form: (1) the participation of the 'commercial infrastructure' in the evolution of Space Station Freedom (SSF); and (2) the commercial utilization of SSF in terms of developed technologies. Additionally, a comparison between the development of Aviation and Space flight is presented in terms of events occurring on a timeline.

Barquinero, Kevin↗

An Overview of STS-132 MRM1 Cargo Element Thermal Model Development and Analyses

STS-132 was launched in May 2010 and delivered the Russian Mini Research Module 1 (MRM1) cargo element to the International Space Station as part of the ULF-4 assembly flight. The cargo element consisted of the module outfitted with externally mounted Multi-purpose Laboratory Module (MLM) Airlock, MLM radiator, Portable Work Platform (PWP), and a European Robotic Arm (ERA) spare elbow. Prior to every Shuttle flight, hardware developers are required to determine compatibility of their hardware to thermal environments experienced during the Shuttle mission and once the element is integrated with the ISS. Thermal models are provided to the Shuttle program to determine the impact of the payload on the Orbiter hardware, as well as the ISS program to determine impacts on other ISS payloads in the Orbiter. Historically the Russian International Partner (IP) develops models in formats not compatible with software used by Space Shuttle or ISS programs. This prompted NASA and Lockheed Martin to develop a unique set of thermal models for the MRM1 cargo element. Subsequent ULF-4 mission analyses performed with the models assessed the launch to activation response, identified operational criteria documented in flight rules, and ensured compliance with the mission timeline and no hazards to the crew, orbiter, or ISS. This presentation provides an overview of the work performed, depicts unique approaches in model development, discusses lessons learned, and issue resolution approaches. Though development and analysis efforts spanned over four years and presented various integration challenges it provided an example of successful collaboration with our International Partners.

Perez, Miguel Fernando↗

Thermal Protection System Mass Estimating Relationships for Blunt-Body, Earth Entry Spacecraft

System analysis and design of any entry system must balance the level fidelity for each discipline against the project timeline. One way to inject high fidelity analysis earlier in the design effort is to develop surrogate models for the high-fidelity disciplines. Surrogate models for the Thermal Protection System (TPS) are formulated as Mass Estimating Relationships (MERs). The TPS MERs are presented that predict the amount of TPS necessary for safe Earth entry for blunt-body spacecraft using simple correlations that closely match estimates from NASA's high-fidelity ablation modeling tool, the Fully Implicit Ablation and Thermal Analysis Program (FIAT). These MERs provide a first order estimate for rapid feasibility studies. There are 840 different trajectories considered in this study, and each TPS MER has a peak heating limit. MERs for the vehicle forebody include the ablators Phenolic Impregnated Carbon Ablator (PICA) and Carbon Phenolic atop Advanced Carbon-Carbon. For the aftbody, the materials are Silicone Impregnated Reusable Ceramic Ablator (SIRCA), Acusil II, SLA-561V, and LI-900. The MERs are accurate to within 14% (at one standard deviation) of FIAT prediction, and the most any MER under predicts FIAT TPS thickness is 18.7%. This work focuses on the development of these MERs, the resulting equations, model limitations, and model accuracy.

mass estimating relationship (MER)↗

Efforts to Streamline Permitting of Geothermal Projects in the United States

Geothermal permitting timelines in the United States can be a deterrent to new investment, with geothermal project development taking as long as seven to ten years. The Energy Policy Act of 2005 (EPAct 2005) in part aimed to streamline aspects of the geothermal permitting process on federally managed public lands. This article summarizes the general regulatory process for developing geothermal projects in the United States and thereafter discusses efforts proposed or undertaken by the U.S. Congress, U.S. Forest Service, U.S. Bureau of Land Management, state governments, and project developers to increase permitting efficiency.

15 GEOTHERMAL ENERGY↗

Modular System to Enable Extravehicular Activity

The ability to perform extravehicular activity (EVA), both human and robotic, has been identified as a key component to space missions to support such operations as assembly and maintenance of space systems (e.g. construction and maintenance of the International Space Station), and unscheduled activities to repair an element of the transportation and habitation systems that can only be accessed externally and via unpressurized areas. In order to make human transportation beyond lower Earth orbit (LEO) practical, efficiencies must be incorporated into the integrated transportation systems to reduce system mass and operational complexity. Affordability is also a key aspect to be considered in space system development; this could be achieved through commonality, modularity and component reuse. Another key aspect identified for the EVA system was the ability to produce flight worthy hardware quickly to support early missions and near Earth technology demonstrations. This paper details a conceptual architecture for a modular EVA system that would meet these stated needs for EVA capability that is affordable, and that could be produced relatively quickly. Operational concepts were developed to elaborate on the defined needs, and to define the key capabilities, operational and design constraints, and general timelines. The operational concept lead to a high level design concept for a module that interfaces with various space transportation elements and contains the hardware and systems required to support human and telerobotic EVA; the module would not be self-propelled and would rely on an interfacing element for consumable resources. The conceptual architecture was then compared to EVA Systems used in the Space Shuttle Orbiter, on the International Space Station to develop high level design concepts that incorporate opportunities for cost savings through hardware reuse, and quick production through the use of existing technologies and hardware designs. An upgrade option was included to make use of the developing suit port technologies.

Sargusingh, Miriam J.↗

NRAP Recommended Practices for Containment Assurance and Leakage Risk Quantification

This report presents recommendations for quantitatively assessing and managing leakage risk and effective containment assurance at geologic carbon storage (GCS) sites, amidst uncertainty in site characteristics and performance. These recommended practices are a product of the U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management’s National Risk Assessment Partnership (NRAP)—a multi-year collaborative research effort of Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, National Energy Technology Laboratory, and Pacific Northwest National Laboratory. These recommended practices are organized as a set of conceptual workflows that correspond with the stages of the GCS project lifecycle. They consider aspects of site characterization, quantification of potential leakage, assessing the spatial extent of potential environmental impacts, optimizing monitoring design for detection of potential leakage, evaluation of concordance between monitored and forecasted reservoir response, assessing conformance with expected/accepted performance, and determination of the timeline over which risk of impactful leakage can be expected to abate. These conceptual workflows are intended to aid stakeholders in making risk management decisions at GCS sites and to support development of sound, risk-based justifications for characterizing the subsurface, defining area of potential leakage impact, designing site monitoring plans, selecting leakage risk management/mitigation alternatives, and estimating site closure timelines.

54 ENVIRONMENTAL SCIENCES↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

Gateway Autonomy for Enabling Deep Space Exploration

The Gateway spacecraft is an important stepping-stone to exploration of the solar system, integrating commercial and international partners into a tightly coupled system, enabling cislunar activities, and implementing key technologies for missions to Mars. Autonomy is a capability area necessary to handle long communication outages where intervention from Earth is impossible, to prepare to operate with long communication delays that will be common in interplanetary travel, and to make spaceflight more affordable and accessible by reducing sustaining operations costs. The Gateway Concept of Operations states that one of Gateway’s goals is to “focus on infrastructure and systems that will allow autonomous operations aboard the Gateway with robotics, automated systems, advanced communications, and distributed computing.” Gateway’s Vehicle Systems Manager (VSM) and associated Autonomous Spacecraft Management Architecture (ASMA) are key products towards delivering autonomous capability. The primary functions of the control architecture are Mission Management and Timeline Execution, Resource Management, Fault Management, and Vehicle Control and Operation (VCO). In each of these areas, there is an initial level of capability to be delivered at launch, with plans to continue development and grow to greater capability. The initial deployment of VSM will focus on maintaining vehicle safety by focusing on full fault management capabilities and deploying only enough resource and timeline planning functionality to support that. The final deployment of VSM will add significant planning and control optimization functionality to support nominal operations for up to 21 days without ground support, even accommodating fault and failure conditions. While the VSM is the vehicle-level representation of autonomous reasoning, distributed automation is essential to provide the right scope and abstraction of information to process. Module and system support of automation and simplicity of interfaces are two important design paradigms that Gateway is focusing on to garner a systems approach to autonomy. Distribution of reasoning can increase complexity, so Gateway is also taking a strict hierarchical approach to information flow and decision making. VSM is not the only capability necessary to achieve an autonomous spacecraft. Robotics support for maintenance of the spacecraft will be essential to provide continued vehicle functionality even when crew is not present. Technical and programmatic challenges exist when implementing autonomous robotics operations. These challenges include sufficient network flexibility to support data transfer to the rest of the vehicle to coordinate module-to-module robotic walk-offs and finding the proper interfaces to allow sufficient dexterity. Communication system upgrades planned for Gateway include Delay Tolerant Networking to best utilize the complex network of relays that will be part of mature cislunar operations. Distributed computing and management will provide failure tolerance, robustness, and growth of capabilities while still allowing significant reuse of heritage software on heritage systems as well as reuse of common applications across a spacecraft to minimize new development, but this requires adherence to key standards and interfaces. The Gateway program has demonstrated significant progress towards these capabilities and has identified challenges other spacecraft developers should be aware of from the start.

Molly Anderson↗

CWMD Nuclear Forensics Quarterly Report

Analysis and evaluation of nuclear debris is a key component to identify forensic signatures in a post-detonation environment. Currently, methods exist and are practiced in obtaining signatures from post-detonation debris. However, efforts to reduce the timeline in obtaining signatures is continuous within nuclear forensics research and will be forwarded by this research. This education and research project will explore combined material chemistry and separations of radionuclides to provide actionable signatures in less time than standard methods. The research will use the phase distribution of radionuclides in debris to develop targeted and rapid dissolution methods. These dissolution methods will be coupled with microfluidics to achieve samples suitable for analysis within reduced timelines.

and nuclear chemistry↗

Logistics simulation of a remediation effort for a hypothetical radiological contamination scenario

To mitigate the effects following a large-scale nuclear or radiological material release in an urban environment and to expedite recovery, the Integrated Wash-Aid Treatment Emergency Reuse System (IWATERS) was developed. IWATERS consists of three operations: washing contaminated surfaces with an ionic wash solution, collecting, and treating the contaminated wash solution on-site to remove contaminants, and reusing the treated solution throughout operations to preserve the clean water resource. This study develops a framework to simulate the logistics of IWATERS deployment, thereby gaining an understanding of the timeline for decontamination operations. For this purpose, the Analysis of Mobility Platform and GoldSim were leveraged for a hypothetical contamination scenario covering 65,200 m 2 of an urban center. The framework reveals that remediation progress is limited by several resources, notably the availability of vermiculite, a reactive clay that is required to treat the contaminated wash solution. Further, this study also presents how the simulation approach can be used to characterize alternatives to reduce the influence of limited resources on operational progress. Overall, this work lays the foundation for evaluating different decontamination methods through detailed logistics simulation, i.e., by refining simulation assumptions and expanding the range of scenarios the simulation can depict.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

HST Servicing Mission Planning and Replanning Tool

An overview is presented of the Hubble Space Telescope (HST) Service Mission Planning and Replanning Tool (SM/PART) and the approach that was employed to develop the system. SM/PART is an AI expert system utilized by NASA to rapidly build complex timelines and command plans to control HST activities. HST servicing missions are Space Shuttle/Orbiter missions expected to occur every three to five years to rendezvous with the HST in orbit and replace, upgrade, or repair HST components. SM/PART runs on a UNIX-based workstation and is implemented in the C language with a Motif-based graphical user interface.

Johnson, J.↗

We Must Take the Next Steps Towards Safe, Routine Space Travel

This paper presents, in viewgraph form, six in a half generations of airplanes in a century. Some of the topics include: 1) Enterprise goals; 2) Generations of Reusable Launch Vehicles; 3) Space Transportation Across NASA; 4) Three Tiered Implementation Approach for Future Space Transportation Technology; 5) Develop a Comprehensive, Agency Level Space Transportation Plan That Will Enable NASA's Strategic Plan; 6) Timeline for Addressing NASA's Needs; 7) Significant 2nd Generation Technology Drivers; 8) Example Large Scale Ground Demonstrations; and 9) Example Pathfinder Demonstrations. The paper also includes various aircraft designs and propulsion system technology.

Lyles, G. M.↗

JSC Pharmacy Services for Remote Operations

The Johnson Space Center Pharmacy began operating in March of 2003. The pharmacy serves in two main capacities: to directly provide medications and services in support of the medical clinics at the Johnson Space Center, physician travel kits for NASA flight surgeon staff, and remote operations, such as the clinics in Devon Island, Star City and Moscow; and indirectly provide medications and services for the International Space Station and Space Shuttle medical kits. Process changes that occurred and continued to evolve in the advent of the installation of the new JSC Pharmacy, and the process of stocking medications for each of these aforementioned areas will be discussed. Methods: The incorporation of pharmacy involvement to provide services for remote operations and supplying medical kits was evaluated. The first step was to review the current processes and work the JSC Pharmacy into the existing system. The second step was to provide medications to these areas. Considerations for the timeline of expiring medications for shipment are reviewed with each request. The third step was the development of a process to provide accountability for the medications. Results: The JSC Pharmacy utilizes a pharmacy management system to document all medications leaving the pharmacy. Challenges inherent to providing medications to remote areas were encountered. A process has been designed to incorporate usage into the electronic medical record upon return of the information from these remote areas. This is an evolving program and several areas have been identified for further improvement.

Stoner, Paul S.↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gas-cooled Fast Reactor Research and Development Roadmap

The United States Department of Energy (DOE) commissioned the development of technology roadmaps for advanced (non-light water reactor) reactor concepts to help focus research and development funding over the next five years. The roadmaps show the research and development needed to support demonstration of an advanced (non-LWR) concept by 2030, consistent with DOE’s Vision and Strategy for the Development and Deployment of Advanced Reactors. The starting point for the roadmaps is the Technical Readiness Assessment performed as part of an Advanced Test and Demonstration Reactor study released in 2016. The roadmaps were developed based upon a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding research and development needs. Critical path tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic, i.e. not specific to a particular vendor’s design, but features of the General Atomics EM2 were included to provide specific examples to illuminate needed R&D tasks to be conducted in support of demonstration in the 2030-2035 window. This report provides the roadmaps to engineering demonstration for of a Gas-Cooled Fast Reactor with an outlet temperature around 850 C. The selection of tasks and associated timelines rely heavily upon the Generation IV International Forum Technology Roadmaps and more recent information provided by a GFR developer, General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gas-cooled Fast Reactor Research and Development Roadmap

The United States Department of Energy (DOE) commissioned the development of technology roadmaps for advanced (non-light water reactor) reactor concepts to help focus research and development funding over the next five years. The roadmaps show the research and development needed to support demonstration of an advanced (non-LWR) concept by 2030, consistent with DOE’s Vision and Strategy for the Development and Deployment of Advanced Reactors. The starting point for the roadmaps is the Technical Readiness Assessment performed as part of an Advanced Test and Demonstration Reactor study released in 2016. The roadmaps were developed based upon a review of technical reports and vendor literature summarizing the technical maturity of each concept and the outstanding research and development needs. Critical path tasks for specific systems were highlighted on the basis of time and resources needed to complete the tasks and the importance of the system to the performance of the reactor concept. The roadmaps are intended to be generic, i.e. not specific to a particular vendor’s design, but features of the General Atomics EM2 were included to provide specific examples to illuminate needed R&D tasks to be conducted in support of demonstration in the 2030-2035 window. This report provides the roadmaps to engineering demonstration for of a Gas-Cooled Fast Reactor with an outlet temperature around 850 C. The selection of tasks and associated timelines rely heavily upon the Generation IV International Forum Technology Roadmaps and more recent information provided by a GFR developer, General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗