MN Solar Pathways: Enhanced Hosting Capacity Analysis

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Smarter Grid Solutions (SGS) completed an evaluation of emerging technologies as non-wires alternatives to integrate solar PV. SGS evaluated stand-alone smart inverters, centrally coordinated smart inverters, thermal load shifting, energy storage, and a combined technology scenario to compare and contrast the benefits at four distribution feeders. The analysis showed that there is not a “one size fits all” answer to increasing hosting capacity beyond a feeder’s static limit, since each feeder faces different constraints.

14 SOLAR ENERGY↗

Packaging Technology Developed for High-Temperature Silicon Carbide Microsystems

High-temperature electronics and sensors are necessary for harsh-environment space and aeronautical applications, such as sensors and electronics for space missions to the inner solar system, sensors for in situ combustion and emission monitoring, and electronics for combustion control for aeronautical and automotive engines. However, these devices cannot be used until they can be packaged in appropriate forms for specific applications. Suitable packaging technology for operation temperatures up to 500 C and beyond is not commercially available. Thus, the development of a systematic high-temperature packaging technology for SiC-based microsystems is essential for both in situ testing and commercializing high-temperature SiC sensors and electronics. In response to these needs, researchers at Glenn innovatively designed, fabricated, and assembled a new prototype electronic package for high-temperature electronic microsystems using ceramic substrates (aluminum nitride and aluminum oxide) and gold (Au) thick-film metallization. Packaging components include a ceramic packaging frame, thick-film metallization-based interconnection system, and a low electrical resistance SiC die-attachment scheme. Both the materials and fabrication process of the basic packaging components have been tested with an in-house-fabricated SiC semiconductor test chip in an oxidizing environment at temperatures from room temperature to 500 C for more than 1000 hr. These test results set lifetime records for both high-temperature electronic packaging and high-temperature electronic device testing. As required, the thick-film-based interconnection system demonstrated low (2.5 times of the room-temperature resistance of the Au conductor) and stable (decreased 3 percent in 1500 hr of continuous testing) electrical resistance at 500 C in an oxidizing environment. Also as required, the electrical isolation impedance between printed wires that were not electrically joined by a wire bond remained high (greater than 0.4 GW) at 500 C in air. The attached SiC diode demonstrated low (less than 3.8 W/mm2) and relatively consistent dynamic resistance from room temperature to 500 C. These results indicate that the prototype package and the compatible die-attach scheme meet the initial design standards for high-temperature, low-power, and long-term operation. This technology will be further developed and evaluated, especially with more mechanical tests of each packaging element for operation at higher temperatures and longer lifetimes.

Chen, Liang-Yu↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cybersecurity Risk Profiles for Distributed Energy Resource Management Systems

Managing the digitalization of increasingly diversity energy resources is a complex challenge for energy systems planners and managers. As the penetration of solar photovoltaics (PV) and other distributed renewable energy resources (DERs) expands, distributed energy resource management systems (DERMS) will play an increasingly important role in managing, monitoring, and controlling DERs as electric systems before more distributed, interconnected, and networked. However, the cybersecurity implications of DERMS deployments are not well understood today. A lack of understanding around the cybersecurity implications of DERMS deployments and variability in the security posture of DERMS vendors, owners, and operators could introduce new security risks to evolving electric power systems. This paper describes cybersecurity attack scenarios on DERMS, identifies related cybersecurity standards and guidelines, reviews the security features of state-of-the-art DERMS solutions, and offers cybersecurity guidance for DERMS vendors, owners, and operators to protect DERMS' unique capabilities. Standardizing cybersecurity requirements for DERMS could help improve the security of DERMS integrations and improve innovations that are more secure by design. The cybersecurity guidance found in this paper is intended to offer a unified approach and lay the foundation for future standardization of DERMS cybersecurity to reduce risk to the solar industry and other renewable energy stakeholders when integrating these technologies with electric power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MN Solar Pathways: Assessing Opportunities and Challenges for Streamlining Interconnection Processes

As part of the Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, Electric Power Research Institute conducted a survey of existing utility interconnection practices and evaluated opportunities for streamlining them. The report highlights opportunities for electric utilities to improve transparency and automate administrative processes with options to fit the level of interconnections that utilities are experiencing.

14 SOLAR ENERGY↗

Coal Fleet Transition: Retirement Impacts in the Eastern Interconnection

This report examines the impact of announced retirements on the mix of available generating capacity, prices, resource availability, and air emissions in the Eastern Interconnection. The report uses a security constrained economic dispatch (SCED) model - Ventyx's PROMOD IV 11.1 - of the bulk electric system (BES) to model the interconnection.

01 COAL, LIGNITE, AND PEAT↗

Emissions implications of downscaled electricity generation scenarios for the western United States

This study explores how emissions from electricity generation in the Western Interconnection region of the U.S. might respond in circa 2030 to contrasting scenarios for fuel prices and greenhouse gas (GHG) emissions fees. We examine spatial and temporal variations in generation mix across the region and year using the PLEXOS unit commitment and dispatch model with a production cost model database adapted from the Western Electricity Coordinating Council. Emissions estimates are computed by combining the dispatch model results with unit-specific, emissions-load relationships. Wind energy displaces natural gas and coal in scenarios with relatively expensive natural gas or with GHG fees. Correspondingly, annual emissions of NOx, SO2, and CO2 are reduced by 20-40% in these cases. NOx emissions, which are a concern as a precursor of ground-level ozone, are relatively high and consistent across scenarios during summer, when peak electricity loads occur and wind resources in the region are comparatively weak. Accounting for the difference in start-up versus stabilized NOx emissions rates for natural gas plants had little impact on region-wide emissions estimates due to the dominant contribution from coal-fired plants, but would be more important in the vicinity of the natural gas units.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliability Study: On-Site Electrical System, 1998-2015

This report documents an analysis of the reliability of on-site electrical systems at U.S. commercial nuclear plants during the period 1998-2015. The study contains both individual component studies and system studies. The component studies are focused on key electrical components including circuit breakers, battery chargers, buses, batteries, and transformers. Data from the range of 1998 to 2015 were gathered, reviewed, and statistically evaluated for impacts on reliability as a function of relevant parameters: manufacturer, system, operating environment, inspection/testing regimen, operating range (voltages, amperes), setpoints, and other factors. The system studies identify seven operating nuclear power plants/units that represent different designs of offsite power sources and interconnecting power circuit paths, develop electrical single line diagrams and detailed fault tree models for the representing designs, and evaluate the electrical system reliability using the reliability data obtained from the component studies.

99 GENERAL AND MISCELLANEOUS↗

Cantilever testing of sintered-silver interconnects

Cantilever testing is an underutilized test method from which results and interpretations promote greater understanding of the tensile and shear failure responses of interconnects, metallizations, or bonded joints. The use and analysis of this method were pursued through the mechanical testing of sintered-silver interconnects that joined Ni/Au-plated copper pillars or Ti/Ni/Ag-plated silicon pillars to Ag-plated direct bonded copper substrates. Sintered-silver was chosen as the interconnect test medium because of its high electrical and thermal conductivities and high-temperature capability—attractive characteristics for a candidate interconnect in power electronic components and other devices. Deep beam theory was used to improve upon the estimations of the tensile and shear stresses calculated from classical beam theory. The failure stresses of the sintered-silver interconnects were observed to be dependent on test-condition and test-material-system. In conclusion, the experimental simplicity of cantilever testing, and the ability to analytically calculate tensile and shear stresses at failure, result in it being an attractive mechanical test method to evaluate the failure response of interconnects.

36 MATERIALS SCIENCE↗

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS↗

An Electrically Switchable Metal-Organic Framework

Crystalline metal organic framework (MOF) materials containing interconnected porosity can be chemically modified to promote stimulus-driven (light, magnetic or electric fields) structural transformations that can be used in a number of devices. Innovative research strategies are now focused on understanding the role of chemical bond manipulation to reversibly alter the free volume in such structures of critical importance for electro-catalysis, molecular electronics, energy storage technologies, sensor devices and smart membranes. In this letter, we study the mechanism for which an electrically switchable MOF composed of Cu(TCNQ) (TCNQ = 7,7,8,8-tetracyanoquinodimethane) transitions from a high-resistance state to a conducting state in a reversible fashion by an applied potential. The actual mechanism for this reversible electrical switching is still not understood even though a number of reports are available describing the application of electric-field-induced switching of Cu(TCNQ) in device fabrication.

Fernandez, CA↗

Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutian Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.

16 TIDAL AND WAVE POWER↗

Frequency Response Assessment and Improvement of Three Major North American Interconnections due to High Penetrations of Photovoltaic Generation

As photovoltaic (PV) generation penetration increases, the inertial and primary frequency response of North American electric grids after a generation loss disturbance will decrease. This change could negatively influence North American power grids frequency stability. This project produced a series of high PV penetration models from detailed, validated base models of all three U.S. interconnections (Eastern Interconnection, Western Electricity Coordinating Council, and Electric Reliability Council of Texas) so that the effects of increased PV generation on their frequency responses can be fully quantified. Mitigation strategies were also developed and validated using both software and hardware test beds.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗