Search NASA⌕ Search

SEARCH · Search NASA

Results for “fleet managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The CPAT Domain Model - How CPAT "Thinks" from an Analyst Perspective

To help effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supporting Electric Vehicle Supply Equipment Deployment

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps federal agencies electrify their fleets and support the deployment of charging infrastructure. To assist agencies with the transition to zero-emission vehicles (ZEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through on-site and virtual EVSE Tiger Teams.

ADVANCED PROPULSION SYSTEMS↗

INTERFUEL: FAST - FY 2020 Federal Fleet Dataset [Slides]

This presentation provides an overview of the fiscal year (FY) 2020 federal motor vehicle fleet dataset collected through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation discusses the size of the dataset; a high-level look at what the information collected shows about the makeup and operation of the federal motor vehicle fleet during FY 2020 and how that compares with recent years; the process used to review the agency submissions comprising the dataset and the impact of some of the agency-provided corrections to identified issues; activities following the finalization of the dataset.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FEDFLEET: FAST (FY2020 Federal Fleet Dataset Overview) [Slides]

This presentation provides an overview of the fiscal year (FY) 2020 federal motor vehicle fleet dataset collected through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation discusses the size of the dataset; provides a high-level look at what the collected information shows about the makeup and operation of the federal motor vehicle fleet during FY 2020 and how that compares with recent years; discusses the process used to review the agency submissions comprising the dataset and the impact of some of the agency-provided corrections to identified issues.

97 MATHEMATICS AND COMPUTING↗

FY 2021 Federal Vehicle Fleet Data Overview [Slides]

This presentation provides an overview of the fiscal year (FY) 2021 federal motor vehicle fleet dataset collected through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation discusses the size of the dataset; provides a high-level look at what the collected information shows about the makeup and operation of the federal motor vehicle fleet during FY 2021 and how that compares with recent years; discusses the process used to review the agency submissions comprising the dataset; and discusses how overall quality of the dataset has been assessed.

99 GENERAL AND MISCELLANEOUS↗

FEDFLEET: FY 2020 Fleet Data Submissions Status Update [Slides]

This presentation presents a brief overview of the current status of the collection of federal motor vehicle fleet data for fiscal year (FY) 2020 through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation covers current status of data collection for FY 2020, the review and feedback process for those submissions, timeline of finalizing the information, and a preliminary high-level overview of the information.

99 GENERAL AND MISCELLANEOUS↗

FY 2020 Federal Fleet Data Submissions: Status Update [PowerPoint]

This presentation presents a brief overview of the current status of the collection of federal motor vehicle fleet data for fiscal year (FY) 2020 through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation covers current status of data collection for FY 2020, the review and feedback process for those submissions, timeline of finalizing the information, and a preliminary high-level overview of the information.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Duluth Transit Authority Battery-Electric Bus Evaluation

Duluth Transit Authority (DTA) collaborated with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate a fleet of seven battery-electric buses (BEBs) in revenue service in Duluth, Minnesota. The focus of the evaluation was to compare performance and cost of the BEBs to that of conventional technology buses in similar service and track progress over time. DTA enlisted the help of the Center for Transportation and the Environment (CTE) to manage the project and provide technical services with the BEB fleet and infrastructure. This report summarizes the results of the BEB evaluation and contains a combination of analyses performed by NREL and by CTE during the overall data collection period of December 2018 through February 2022.

33 ADVANCED PROPULSION SYSTEMS↗

Integrated Traffic Flow Management Decision Making

A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

Grabbe, Shon R.↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safe Operations at Roadway Junctions - Design Principles from Automated Guideway Transit

Herein this paper describes a system-level view of a fully automated transit system comprising a fleet of automated vehicles (AVs) in driverless operation, each with an SAE level 4 Automated Driving System, along with its related safety infrastructure and other system equipment. This AV system-level control is compared to the automatic train control system used in automated guideway transit technology, particularly that of communications-based train control (CBTC). Drawing from the safety principles, analysis methods, and risk assessments of CBTC systems, comparable functional subsystem definitions are proposed for AV fleets in driverless operation. With the prospect of multiple AV fleets operating within a single automated mobility district, the criticality of protecting roadway junctions requires an approach like that of automated fixed-guideway transit systems, in which a guideway switch zone "interlocking" at each junction location deconflicts railway traffic, affirming safe passage. The analogous AV protection safety subsystem is defined as fail-safe equipment that monitors roadway intersections and junctions, communicates traffic signal status, perceives and communicates alerts and signals to AV connected vehicles concerning potential unsafe conditions, and performs related primary safety functions. Conclusions are drawn that the AV protection roadway intersection functions must be performed by local roadside equipment dedicated to protecting each roadway intersection and junction. Further, it is concluded that the communications technology connecting the infrastructure with the vehicle to perform this vital, fail-safe protection should meet specific functional and performance criteria.

33 ADVANCED PROPULSION SYSTEMS↗

Asset Level Data Reporting

This presentation provides an overview of the change in how the Federal Automotive Statistical Tool (FAST) will collect per-vehicle data about the Federal government's fleet of motor vehicles, current status of the implementation effort to support that reporting, and lessons learned to date. This presentation is one of three comprising a panel discussion with representatives from other Federal agencies. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government.

99 GENERAL AND MISCELLANEOUS↗

The History of Orbiter Corrosion Control (1981 - 2011)

After 135 missions and 30 years the Orbiter fleet was retired in 2011. Working with Orbiter project management and a world class engineering team the CCRB was successful in providing successful sustaining engineering support for approximately 20 years. Lessons learned from the Orbiter program have aided NASA and contractor engineers in the design and manufacture of new spacecraft so that exploration of space can continue. The Orbiters are proudly being displayed for all the public to see in New York City, Washington D.C., Los Angeles, and at the Kennedy Space Center in Florida.

Corrosion↗

TPSAS-NF1676L-35747-DND

The Aircraft Certification Service (AIR) Policy & Innovation Division supports aerospace innovation by creating novel means of compliance, develops and maintains AIR regulations, manages the Chief Scientific and Technical Advisors and overall fleet safety, as well as educational outreach.

E H Glaessgen↗

An Experimental System for Strategic Flight Path Management in Advanced Air Mobility

In the concept envisioned for Urban Air Mobility (UAM) operations, fleets of electric vertical takeoff and landing (eVTOL) vehicles would operate between vertiports distributed within a densely populated area. These operations would be largely independent from the existing air traffic control system and would place the responsibility for flight planning and aircraft separation on fleet operators. The fourth major level on the UAM Maturity Level scale, UML-4, relies on “collaborative and responsible” automation to enable operations in non-visual conditions with medium traffic density (hundreds of aircraft in one metropolitan region) and medium complexity. This level of service places many requirements on automation systems to assist the operators of these aircraft. NASA has developed the Autonomous Operations Planner (AOP), a reference prototype Flight Path Management automation system, and has modified AOP to support research of anticipated UML-4 operations. AOP creates a four-dimensional flight plan conforming to the constraints of these operations, evaluates and modifies the flight plan during flight as conditions and constraints evolve, and coordinates the flight plan with other airspace users and with service providers. This version of AOP has been integrated into the Sikorsky Autonomy Research Aircraft and used in a flight test activity. In this paper we discuss anticipated characteristics of UAM operations, modifications that were made to AOP to adapt to that environment or to support the flight test, and observations of software and aircraft performance during the flight test. The aircraft achieved four-dimensional conformance with the flight plan and AOP provided adequate planning in almost all cases. We discuss improvements that could be made to AOP to address deficiencies that were observed.

Autonomous Operations Planner↗

An Experimental System for Strategic Flight Path Management in Advanced Air Mobility

In the concept envisioned for Urban Air Mobility (UAM) operations, fleets of electric vertical takeoff and landing (eVTOL) vehicles would operate between vertiports distributed within a densely populated area. These operations would be largely independent from the existing air traffic control system and would place the responsibility for flight planning and aircraft separation on fleet operators. The fourth major level on the UAM Maturity Level scale, UML-4, relies on “collaborative and responsible” automation to enable operations in non-visual conditions with medium traffic density (hundreds of aircraft in one metropolitan region) and medium complexity. This level of service places many requirements on automation systems to assist the operators of these aircraft. NASA has developed the Autonomous Operations Planner (AOP), a reference prototype Flight Path Management automation system, and has modified AOP to support research of anticipated UML-4 operations. AOP creates a four-dimensional flight plan conforming to the constraints of these operations, evaluates and modifies the flight plan during flight as conditions and constraints evolve, and coordinates the flight plan with other airspace users and with service providers. This version of AOP has been integrated into the Sikorsky Autonomy Research Aircraft and used in a flight test activity. In this paper we discuss anticipated characteristics of UAM operations, modifications that were made to AOP to adapt to that environment or to support the flight test, and observations of software and aircraft performance during the flight test. The aircraft achieved four-dimensional conformance with the flight plan and AOP provided adequate planning in almost all cases. We discuss improvements that could be made to AOP to address deficiencies that were observed.

Autonomous Operations Planner↗

Federal Automotive Statistical Tool: FY 2018 Federal Fleet Data Call [Slides]

This presentation provides an overview of collecting federal motor vehicle fleet data at the individual vehicle level for the first time during the fall of 2017, lessons learned related how that data was validated, and changes made during the summer of 2018 based on those lessons in preparation for the now in-progress FY 2018 federal fleet reporting activity. This presentation will be given at the October 2018 FedFleet quarterly meeting (convened on-line on 2018-1024 by GSA's Office of Government-wide Policy). The Federal Automative Statistical Tool (FAST)is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government. FAST is developed and maintained by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

FAST FY 2018 Data Call: A Preliminary Review [Slides]

This presentation provides an overview of fiscal year 2018 federal motor vehicle fleet data at the individual vehicle level during the fall of 2018, a preliminary summary of the data collected, and how the collecting project has reviewed that information for potential quality issues. This presentation will be given at the March 2019 INTERFUEL group meeting, hosted by DOE's Federal Energy Management Program (DOE FEMP). The information is collected through the Federal Automotive Statistical Tool (FAST) project. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government. FAST is developed and maintained by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗