Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

C++ Planning and Resource Reasoning (PARR) shell

This paper describes a generic, C++ version of the Planning and Resource Reasoning (PARR) shell which has been developed to supersede the C-based versions of PARR that are currently used to support AI planning and scheduling applications in flight operations centers at Goddard Space Flight Center. This new object-oriented version of PARR can be more easily customized to build a variety of planning and scheduling applications, and C++ PARR applications can be more easily ported to different environments. Genetic classes, constraints, strategies, and paradigms are described along with two types of PARR interfaces.

Mcintyre, James↗

JSC Metal Finishing Waste Minimization Methods

THe paper discusses the following: Johnson Space Center (JSC) has achieved VPP Star status and is ISO 9001 compliant. The Structural Engineering Division in the Engineering Directorate is responsible for operating the metal finishing facility at JSC. The Engineering Directorate is responsible for $71.4 million of space flight hardware design, fabrication and testing. The JSC Metal Finishing Facility processes flight hardware to support the programs in particular schedule and mission critical flight hardware. The JSC Metal Finishing Facility is operated by Rothe Joint Venture. The Facility provides following processes: anodizing, alodining, passivation, and pickling. JSC Metal Finishing Facility completely rebuilt in 1998. Total cost of $366,000. All new tanks, electrical, plumbing, and ventilation installed. Designed to meet modern safety, environmental, and quality requirements. Designed to minimize contamination and provide the highest quality finishes.

Sullivan, Erica↗

Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

scheduling↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

Use of Heritage Hardware on MPCV Exploration Flight Test One

Due to an aggressive schedule for the first orbital test flight of an unmanned Orion capsule, known as Exploration Flight Test One (EFT1), combined with severe programmatic funding constraints, an effort was made to identify heritage hardware, i.e., already existing, flight-certified components from previous manned space programs, which might be available for use on EFT1. With the end of the Space Shuttle Program, no current means exists to launch Multi Purpose Logistics Modules (MPLMs) to the International Space Station (ISS), and so the inventory of many flight-certified Shuttle and MPLM components are available for other purposes. Two of these items are the Shuttle Ground Support Equipment Heat Exchanger (GSE Hx) and the MPLM cabin Positive Pressure Relief Assembly (PPRA). In preparation for the utilization of these components by the Orion Program, analyses and testing of the hardware were performed. The PPRA had to be analyzed to determine its susceptibility to pyrotechnic shock, and vibration testing had to be performed, since those environments are predicted to be significantly more severe during an Orion mission than those the hardware was originally designed to accommodate. The GSE Hx had to be tested for performance with the Orion thermal working fluids, which are different from those used by the Space Shuttle. This paper summarizes the certification of the use of heritage hardware for EFT1.

Rains, George Edward↗

Moving from Bilateral to Multilateral Medical Operations

When the ISS Integrated Medical Group moved to a multilateral configuration for the ASTROLAB mission, several challenges were encountered and overcome that allowed for a streamlined operational experience. Dating back to the early 1990s, the European Space Agency (ESA) has sent flight surgeon and Biomedical Engineering (BME) personnel to NASA-JSC and Russia to train for space flight operational support. This training was tailored towards the needs of particular Shuttle/Soyuz missions, and more generally for eventual ISS support. With the announcement of the ASTROLAB mission, NASA and ESA personnel worked together to develop a detailed training template for ESA BMEs to ensure successful support of the mission from the European Astronaut Center (EAC). This training included the deployment of ESA BMEs to JSC, as well as the development of a rotation of ISS-certified NASA BMEs to the EAC. In addition to training, NASA, ESA, and the Russian Federal Space Agency (FSA) worked together preflight to develop multilateral flight control support concepts and implementation plans. This resulted in flight control support schedules, operational rules of engagement, and the delineation of responsibilities. NASA also assisted ESA with the development and deployment of workstation displays to allow the ESA medical flight control team to monitor ISS telemetry from the EAC. The goal of this presentation is to provide details of the preflight preparation and in-flight support of the ASTROLAB mission by the ESA, NASA, and FSA medical support teams. In addition, it will identify lessons learned that will be implemented for future multilateral endeavors.

Roden, S.↗

Mass transport phenomena in microgravity: Preliminary results of the first MEPHISTO flight experiment

The MEPHISTO space program is the result of a cooperative effort that involves the French nuclear and space agencies (Commissariat a l'energie atomique, CEA - Centre National d'Etudes Spatiales, CNES) and the American National Aeronautics and Space Administration (NASA). The scientific studies and apparatus development were funded in the frame of the GRAMME agreement between CEA and CNES, the flight costs being taken in charge by NASA. Six flight opportunities are scheduled, with alternating French and American principal investigators. It is the purpose of this paper to briefly present MEPHISTO along with the preliminary results obtained during its first flight on USMP-1 in October 1992.

Favier, Jean Jacques↗

Open-Loop Pitch Table Optimization for the Maximum Dynamic Pressure Orion Abort Flight Test

NASA has scheduled the retirement of the space shuttle orbiter fleet at the end of 2010. The Constellation program was created to develop the next generation of human spaceflight vehicles and launch vehicles, known as Orion and Ares respectively. The Orion vehicle is a return to the capsule configuration that was used in the Mercury, Gemini, and Apollo programs. This configuration allows for the inclusion of an abort system that safely removes the capsule from the booster in the event of a failure on launch. The Flight Test Office at NASA's Dryden Flight Research Center has been tasked with the flight testing of the abort system to ensure proper functionality and safety. The abort system will be tested in various scenarios to approximate the conditions encountered during an actual Orion launch. Every abort will have a closed-loop controller with an open-loop backup that will direct the vehicle during the abort. In order to provide the best fit for the desired total angle of attack profile with the open-loop pitch table, the table is tuned using simulated abort trajectories. A pitch table optimization program was created to tune the trajectories in an automated fashion. The program development was divided into three phases. Phase 1 used only the simulated nominal run to tune the open-loop pitch table. Phase 2 used the simulated nominal and three simulated off nominal runs to tune the open-loop pitch table. Phase 3 used the simulated nominal and sixteen simulated off nominal runs to tune the open-loop pitch table. The optimization program allowed for a quicker and more accurate fit to the desired profile as well as allowing for expanded resolution of the pitch table.

Stillwater, Ryan A.↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

Upper-Stage Flight Experiment

For propulsion applications that require that the propellants are storable for long periods, have a high density impulse, and are environmentally clean and non-toxic, the best choice is a combination of high-concentration hydrogen peroxide (High Test Peroxide, or HTP) and a liquid hydrocarbon (LHC) fuel. The HTP/LHC combination is suitable for low-cost launch vehicles, space taxi and space maneuvering vehicles, and kick stages. Orbital Sciences Corporation is under contract with the NASA Marshall Space Flight Center in cooperation with the Air Force Research Lab to design, develop and demonstrate a new low-cost liquid upper stage based on HTP and JP-8. The Upper Stage Flight Experiment (USFE) focuses on key technologies necessary to demonstrate the operation of an inherently simple propulsion system with an innovative, state-of-the-art structure. Two key low-cost vehicle elements will be demonstrated - a 10,000 lbf thrust engine and an integrated composite tank structure. The suborbital flight test of the USFE is scheduled for 2001. Preceding the flight tests are two major series of ground tests at NASA Stennis Space Center and a subscale tank development program to identify compatible composite materials and to verify their compatibility over long periods of time. The ground tests include a thrust chamber development test series and an integrated stage test. This paper summarizes the results from the first phase of the thrust chamber development tests and the results to date from the tank material compatibility tests. Engine and tank configurations that meet the goals of the program are described.

Anderson, W. E.↗

Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions

Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times of the aircraft. Findings from these initial experiments indicate that it is possible to schedule arrivals into Anchorage with minimal delays under low-visibility conditions with less disruption to high-cost, international flights.

Grabbe, Shon↗

Fluid and electrolyte homeostasis during spaceflight: Elucidation of mechanisms in a primate

Although it is now well accepted that exposure to the hypogravic environment of space induces a shift of fluid from the lower extremities toward the upper body, the actual physiological responses to this central volume expansion have not been well characterized. Because it is likely that the fluid and electrolyte response to hypogravity plays a critical role in the development of Cardiovascular Deconditioning, elucidation of these mechanisms is of critical importance. The goal of flight experiment 223, scheduled to fly on SLS-2, is the definition of the basic renal, fluid and electrolyte response to spaceflight in four instrumented squirrel monkeys. The studies were those required to support the development of flight hardware and optimal inflight procedures, and to evaluate a ground-based model for weightlessness, lower body positive pressure (LBPP).

Churchill, Susanne↗

Estimation of Reduction in Airspace Capacity Due to Convective Weather

Severe convective weather routinely disrupts normal flow of air traffic in the United States' National Airspace System (NAS). Over the last decade, severe weather has been the most significant cause, accounting for over 70% of air traffic delays in the NAS. Flights incur modification in their nominal routes due to the presence of severe weather, and hence, suffer increased delays. These delays contribute to increased burden on airlines due to extra fuel costs and missed schedules for connecting flights. In this paper, the reduction in air space capacity and the associated air traffic delays due to severe convective weather will be investigated.

Sheth, Kapil↗

Rat Gestation During Space Flight: Outcomes for Dams and Their Offspring Born After Return to Earth

Sprague-Dawley rats were studied to learn whether gestation in the near-zero gravity, high radiation environment of space impacts selected mammalian postnatal events. Ten rats spent days nine to twenty of pregnancy aboard the space shuttle orbiter Atlantis (STS-66). Their movement was studied shortly after return to Earth; subsequently, several of their offspring were cross-fostered and examined through postnatal day 81 (P81) for whole body growth and somatic motor development. Values for the flight animals were compared to ground-based control groups. Relative to controls, the pregnant flight rats showed a marked paucity of locomotion during the first few hours after returning to Earth. There was greater likelihood of perinatal morbidity for the offspring of flight dams when compared to the control groups. Whole body weight of surviving offspring, averaged for each group separately, showed typical sigmoidal growth curves when plotted against postnatal age. The flight group for our study had a larger ratio of female to male pups, and that was sufficient to account for the lower average daily weight gained by the flight animals when compared to the control groups. Walking was universally achieved by P13 and preceded eye opening, which was complete in all pups by P17. Thus, both of these developmental horizons were attained on schedule in the flight as well as the control rats. Characteristic changes were observed in hind limb step length and gait width as the pups grew. These patterns occurred at the same time in each group of rats. Therefore, prenatal space flight from days nine to twenty of gestation did not interfere with the establishment of normal patterns for hind paw placement during walking.

Wong, Andre M.↗

Scheduling Software

Advanced Scheduling Environment is a software product designed and marketed by AVYX, Inc. to provide scheduling solutions for complex manufacturing environments. It can be adapted to specific scheduling and manufacturing processes and has led to substantial cost savings. The system was originally developed for NASA use in scheduling Space Shuttle flights and satellite activities. AVYX, Inc. is an offshoot of a company formed to provide computer-related services to NASA. TREES-plus, the company's initial product became the programming language for the advanced scheduling environment system.

Source record↗

Simulation Training Versus Real Time Console Training for New Flight Controllers

For new flight controllers, the two main learning tools are simulations and real time console performance training. These benefit the new flight controllers in different ways and could possibly be improved. Simulations: a) Allow for mistakes without serious consequences. b) Lets new flight controllers learn the working style of other new flight controllers. c) Lets new flight controllers eventually begin to feel like they have mastered the sim world, so therefore they must be competent in the real time world too. Real time: a) Shows new flight controllers some of the unique problems that develop and have to be accounted for when dealing with certain payloads or systems. b) Lets new flight controllers experience handovers - gathering information from the previous shift on what the room needs to be aware of and what still needs to be done. c) Gives new flight controllers confidence that they can succeed in the position they are training for when they can solve real anomalies. How Sims could be improved and more like real-time ops for the ISS Operations Controller position: a) Operations Change Requests to review. b) Fewer anomalies (but still more than real time for practice). c) Payload Planning Manager Handover sheet for the E-1 and E-3 reviews. d) Flight note in system with at least one comment to verify for the E-1 and E-3 reviews How the real time console performance training could be improved for the ISS Operations Controller position: a) Schedule the new flight controller to be on console for four days but with a different certified person each day. This will force them to be the source of knowledge about every OCR in progress, everything that has happened in those few days, and every activity on the timeline. Constellation program flight controllers will have to learn entirely from simulations, thereby losing some of the elements that they will need to have experience with for real time ops. It may help them to practice real time console performance training in the International Space Station or Space Shuttle to gather some general anomaly resolution and day-to-day task management skills.

Heaton, Amanda↗

Emergency medicine and the airline passenger

Problems related to immediate medical care in case of in-flight emergencies are discussed with reference to such critical types of medical emergencies as obstructed airway, cardiac dysfunction, trauma, hemorrhage, hypoxia, and pain. It is shown that training flight attendants to deal with in-flight medical emergencies and to use first-aid support equipment and essential and useful drugs may later help with stabilization of a victim and allow continuing the flight to the scheduled destination without the need for a diverted landing. Among the steps suggested in order to upgrade inflight welfare and safety of passengers are the development of an advisory circular by the FAA covering standardized training for flight attendants, regulatory action requiring upgrading of the present rudimentary first-aid kit, and the enactment of Good Samaritan legislation by the U.S. Government.

Mohler, S. R.↗

Schedule Factors Associated with the Use of Controlled Rest in a Long-Haul Airline

Controlled Rest (CR) refers to a short, voluntary nap opportunity taken by pilots on the flight deck as a countermeasure to unanticipated sleepiness in flight. This study explores the profile of CR use in a long-haul commercial airline. Forty-four pilots wore actiwatches and filled in an application-based sleep/work diary for approximately 2 weeks. After merging sleep diary, actigraphy, and schedule data, complete records were analyzed from 240 flights. Sleep was estimated during CR intervals using the Philips Actiware 6.0.9 (Bend, OR) software with wake threshold set to medium. Timing of sleep periods and flight schedules were analyzed relative to home-base time. A mixed-effects binary logistics regression was used to analyze the impact of schedule factors on CR. Preliminary analyses revealed that CR was taken on 45% (n=107) of flights. Average sleep duration within these rest periods was estimated as 24.8 ± 16.1 minutes. CR was more frequent on return flights (arriving at home-base; 58%, n=69) vs. outbound flights (departing from home-base, 31%, n=38; p<0.001). There was no difference for direction of travel (eastbound: 49%, n= 56; westbound: 40%, n= 44; northbound/southbound: 50%, n=7; p=0.272). CR was more frequent on 2-pilot flights (62%, n=81) compared to augmented crew flights (24%, n=26; p<0.001). Of note, 21% (n=23) of augmented flights contained both CR and Bunk Rest. CR was more frequent on flights <10h duration (<10h: 59%, n=78; >10h: 27%, n=29; p<0.001). Flights departing between 12:00h-19:59h (25%, n=23; p<0.026) had the lowest frequency of CR. Data from this airline show that CR is most commonly used as a countermeasure to sleepiness on return, unaugmented, <10h duration, and nighttime flights. The direction of travel did not influence the use of CR. Future studies are required to determine generalizability of these results to other airlines.

Hilditch, Cassie↗