Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Final Technical Report: Low-Cost Solar Variability Sensors for Ubiquitous Deployment.

In this project, an integrated solution to measuring and collecting solar variability data called the solar variability datalogger (SVD) was developed, tested, and the value of its data to distribution grid integration studies was demonstrated. This work addressed the problem that high-frequency solar variability is rarely measured – due to the high cost and complex installation of existing solar irradiance measuring pyranometers – but is critical to the accurate determination of the impact of photovoltaics to electric grid operation. For example, up to a 300% difference in distribution grid voltage regulator tap change operations (a measure of the impact of PV) [1] has been observed due solely to different solar variability profiles.

47 OTHER INSTRUMENTATION↗

PNNL Plan for Acquiring, Anonymizing, and Protecting Utility Data

This plan details the processes that PNNL will use for acquiring, anonymizing and protecting utility data offered for use in research projects affiliated with the U.S. Department of Energy’s Office of Electric Reliability and Resilience (OE). PNNL has been tasked with obtaining agreements with utilities to provide PMU and related data for research purposes, and to assemble anonymized practice and test datasets for the three primary U.S. electric grid interconnections. DOE intends to provide anonymized PMU data to selected researchers to explore the capability of artificial intelligence tools to identify and improve existing knowledge, and to discover new insights and tools for better grid operation and management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Variable Renewable Energy - Russia

To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. Because solar and wind tend to be more variable and uncertain than conventional sources, meeting these targets will involve changes to power system planning and operations. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE) to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE into the power system while maintaining or increasing system stability and reliability. When considering grid integration, policy makers, regulators, and system operators consider a variety of issues, which can be organized into four broad topics: New Renewable Energy Generation, New Transmission, Increased System Flexibility, Planning for a High RE Future. This is a Russian-language translation of Integrating Variable Renewable Energy into the Grid: Key Issues, Greening the Grid, originally published in English in May 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Storage Futures Study: Key Learnings for the Coming Decades

This report is the final in NREL's Storage Futures Study, a multiyear research project that explored the role and impact of energy storage in the evolution and operation of the U.S. power sector. The SFS examined the potential impact of energy storage technology advancement on the deployment of utility-scale storage and the adoption of distributed storage, and the implications for future power system infrastructure investment and operations. The research findings and supporting data were published across a series of six reports, culminating in this final, seventh publication that draws upon findings from across the study, previous work, and additional analysis to identify eight key learnings about the future of energy storage and its impact on the power system. The key learnings can help policymakers, technology developers, and grid operators prepare for the coming way of energy storage deployment.

25 ENERGY STORAGE↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Western Wind and Solar Integration Study Phase 2 (Presentation)

This presentation accompanies Phase 2 of the Western Wind and Solar Integration Study, a follow-on to Phase 1, which examined the operational impacts of high penetrations of variable renewable generation on the electric power system in the West and was one of the largest variable generation studies to date. High penetrations of variable generation can induce cycling of fossil-fueled generators. Cycling leads to wear-and-tear costs and changes in emissions. Phase 2 calculated these costs and emissions, and simulated grid operations for a year to investigate the detailed impact of variable generation on the fossil-fueled fleet. The presentation highlights the scope of the study and results.

14 SOLAR ENERGY↗

Adapting Grid Criticality for Data Centers

This presentation explores the evolving definition of “critical load” in the electric grid, emphasizing the growing importance of digital infrastructure—particularly data centers—in grid resilience, restoration, and modernization. As utilities increasingly rely on AI-driven analytics and software-defined control systems, data centers have shifted from passive electricity consumers to essential computational hubs that enable National Critical Functions (NCFs) and support real-time grid operations. The deck examines the scale and impact of digital loads, the need for grid modernization to manage rapid load growth, and the diverse computing paradigms required for AI deployment. It introduces a tiered taxonomy for classifying critical loads, highlights operational dependencies between the grid and digital infrastructure, and discusses policy implications for integrating data centers into emergency planning and restoration protocols. Through case studies and practical frameworks, the presentation provides actionable insights for utilities, regulators, and planners navigating the digital transformation of the power sector.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Simulating dispatchable grid services provided by flexible building loads: State of the art and needed building energy modeling improvements

End-use electrical loads in residential and commercial buildings are evolving into flexible and cost-effective resources to improve electric grid reliability, reduce costs, and support increased hosting of distributed renewable generation. This article reviews the simulation of utility services delivered by buildings for the purpose of electric grid operational modeling. We consider services delivered to (1) the high-voltage bulk power system through the coordinated action of many, distributed building loads working together, and (2) targeted support provided to the operation of low-voltage electric distribution grids. Although an exhaustive exploration is not possible, we emphasize the ancillary services and voltage management buildings can provide and summarize the gaps in our ability to simulate them with traditional building energy modeling (BEM) tools, suggesting pathways for future research and development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Realistic Testbed Synthesis for Power System Communication Networks based on Graph Metrics

Communication networks are integral to modern power grid operations and are becoming increasingly critical as grid dynamics speed up and as more controls become closed-loop in form. Focusing on the interdependence between the physical grid and the communication system, we identify several key characteristics and typical graph properties based on analysis of a real communication system for a power grid. Moreover, an automated process was provided for synthetic testbed in the NS-3 simulator for the power system test case, and its network characteristics have been further derived for power system monitoring and control applications

Graph Analysis, Synthetic Testbed, communication n↗

Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed

Grid operators are increasingly turning to advanced grid-support functions in distributed energy resources (DER) to assist with distribution circuit voltage regulation, bulk system frequency control, and power system protection. The U.S. DER certification standard, Underwriters Laboratories (UL) 1741, was revised in September 2016 to add test procedures for multiple grid-support functions. Sandia National Laboratories, SunSpec Alliance, and growing community of collaborators have undertaken a multiyear effort to create an open-source system validation platform (SVP) that automates DER interconnection and interoperability test procedures by communicating with grid simulators, photovoltaic (PV) simulators, data acquisition systems, and interoperable equipment under test. However, the power hardware required for generating the test conditions may be untenable for many organizations. In this paper, we discuss development of the SVP testing capabilities for UL 1741 tests utilizing a controller hardware-in-the-loop testbed that precludes the need for power hardware using a 34.5 kW Austrian Institute of Technology smart grid controller. Finally, analysis of normal ramp rate, soft start ramp rate, specified power factor, volt-VAr, and frequency-watt advanced grid functions, and the effectiveness of the UL 1741 test protocols are included.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Uncertainty on Energy Storage Operation Decisions: Motivation and Framework

Energy Storage Systems (ESSs) are gaining great attention, as they can help operate grid power grids more reliably. The ESS acquisition and operation is motivated by the economics revolving around its provided services and revenue streams. These economics are greatly impacted by uncertainties in predicting the parameters which influence the ESS operation. The main goal of this paper is in addressing these uncertainties. We organize sources of uncertainties which directly impact the value-driven operation of the ESS and propose a framework which combines the uncertain requirements from processes both internal and external to ESS.

Hanif, Sarmad↗

IViz-OT (Intrusion Detection Visualizer for Operational Technology Network) [SWR-22-63]

The Visualizer dashboard provides grid operator highly-trusted alarming environment for an ongoing or potential cyber-attack based on system anomalies and network-based verification. Once anomalies are detected by the IDS tool (HIDES, NREL SWR-19-65), this platform stores the signatures or alert logs that are generated by the intrusion detector, lays out the detailed summary of the possible alerts, and maps these attacks with high-level scenarios. These scenarios are later combined to define a final event using a decision tree approach and a final report is generated out of this tool for further forensic analysis. It also supports authentication and authorization to support roles-based access control (RBAC) for users and a group of people.

Singh, Vivek Kumar↗

Comparison of Distributive Consensus Algorithms for AnomalyDetection on the Power-Grid

As an increasing number of devices in the power-grid rely on high-precision clocks to measure electrical properties and time stamp data, GPS receivers have become a vulnerability on the power-grid. GPS spoofing attacks, in which a fake signal is transmitted, can cause sensor measurement errors that can misinform protective equipment and grid operators for both the transmission and distribution grid. The technology being developed to secure precision clocks in the transmission grid are not appropriate for the distribution grid. Thus, there is a need to developed anomaly detection algorithms that are suitable for the hardware available on the distribution grid. Traditionally, a distributed detection framework is comprised of spatially distributed nodes which acquire observations about a quantity of interest and sends the data to the fusion center, where a global decision is made. Instead the distribution grid has low-power devices, such as smart inverters and microPMUs, that could be used to perform highly parallelized calculations. Having on node calculations is beneficial since it is more network and computation efficient, as the more calculations can be performed where the data is being captured instead of communicating across a slow network to a centralized fusion center. Instead, we could employ an alternate peer-to-peer type of information exchange on the distribution grid that can still reach a global decision. A decentralized approach to anomaly detection makes efficient use of the computational and network bandwidth that exists, and it also lacks the single point of failure of a centralized approach. Thus, a decentralized local information exchange and/or inference is preferred. Lastly, the unreliability of the distribution grid network connections and potential noise or error in the measurements must be considered. In order to produce an effective detection tool, a Byzantine-fault tolerant and asynchronous algorithm must be developed. Thus, the first phase of our project is to develop a distributed, decentralized, asynchronous, Byzantine-fault tolerant, collaborative autonomy-based anomaly detection algorithm to collectively analyze clusters of data for signs of a malicious attack.

97 MATHEMATICS AND COMPUTING↗

Wind Farm Monitoring at Storm Lake I Wind Power Project -- Equipment Only: Cooperative Research and Development Final Report, CRADA Number CRD-10-369

Long-term, high-resolution wind turbine and wind power plant output data are important to assess the impact of wind power on grid operations and to derive meaningful statistics for better understanding of the variability of wind power. These data are used for many research and analysis activities consistent with the Wind Program mission.

17 WIND ENERGY↗

Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation. Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve/ensure accuracy, providing information on normally estimated values such as underground conductor impedance, and characterization of complex loads. Although the input of high-fidelity data to existing tools will be challenging, µPMU data on phase angle (as well as other data from advanced sensors) will be useful for basic operational decisions that are based on a trend of changing data.

25 ENERGY STORAGE↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming↗

Grid-Integrated Distributed Solar: Addressing Challenges for Operations and Planning, Greening the Grid

Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document introduces a brief overview of common technical impacts of PV on distribution systems and operations, as well as emerging strategies for successfully addressing some of the priority issues.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters

This paper investigates operational techniques to achieve seamless (smooth) microgrid (MG) transitions by dispatching a grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control modes during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worth exploring how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. The results show that the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires that the GFM inverter(s) maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-forming control↗