Search NASA⌕ Search

SEARCH · Search NASA

Results for “injectors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Role of Inlet Boundary Conditions on Fuel-Air Mixing at Supercritical Conditions

Advanced engine design and alternative fuels present the possibility of fuel injection at purely supercritical conditions in diesel engines and gas turbines. The complex interactions that govern this phenomenon still need significant research, particularly the boundary conditions for fuel injection are critical for accurate simulation. However, the flow inside the injector itself is often omitted to reduce the computational efforts, and thus, velocity, mass flux, or total pressure is specified at the injector exit (or domain inlet), often with simplified velocity profiles and turbulence levels. This simplified inlet boundary treatment has minimal effects on results for conventional fuel injection conditions, however, the validity of this approach at supercritical conditions has not been assessed. Comprehensive real-gas and binary fluid mixing models have been implemented for computational fluid dynamics (CFD) analysis of fuel-air mixing at supercritical conditions. The model is verified using prior CFD results from the literature. The model is used to investigate the effects of the shape of axial velocity and mass fraction profiles at the inlet boundary with the goal to improve the comparison of predictions to experimental data. Results show that the boundary conditions have a significant effect on the predictions, and none of the cases match precisely with experimental data. Furthermore, the study reveals that the physical location of the inlet boundary might be difficult to infer correctly from the experiments and highlights the need for high-quality, repeatable measurements at supercritical conditions to support the development of relevant high-fidelity models for fuel-air mixing.

02 PETROLEUM↗

Future Circular Collider Feasibility Study Report

In response to the 2020 Update of the European Strategy for Particle Physics , the Future Circular Collider (FCC) Feasibility Study was launched as an international collaboration hosted by CERN. This report describes the FCC integrated programme , which consists of two stages: an electron-positron collider (FCC-ee) in the first phase, serving as a high-luminosity Higgs, top, and electroweak factory; followed by a proton-proton collider (FCC-hh) at the energy frontier in the second phase. The FCC-ee is designed to operate at four key centre-of-mass energies: the Z pole, the WW pair production threshold, the ZH production peak, and the top/anti-top production threshold—each delivering the highest possible luminosities to four experiments. Over 15 years of operation, FCC-ee will produce more than 6 trillion Z bosons, 200 million WW pairs, nearly 3 million Higgs bosons, and 2 million top anti-top pairs. Precise energy calibration at the Z pole and WW threshold will be achieved through frequent resonant depolarisation of pilot bunches. The sequence of operation modes between the Z, WW, and ZH substages remains flexible. The FCC-hh will operate at a centre-of-mass energy of approximately 85 TeV—nearly an order of magnitude higher than the LHC—and is designed to deliver 5 to 10 times the integrated luminosity of the upcoming High-Luminosity LHC. Its mass reach for direct discovery extends to several tens of TeV. In addition to proton-proton collisions, the FCC-hh is capable of supporting ion-ion, ion-proton, and lepton-hadron collision modes. This second volume of the Feasibility Study Report presents the complete design of the FCC-ee collider, its operation and staging strategy, the full-energy booster and injector complex, required accelerator technologies, safety concepts, and technical infrastructure. It also includes the design of the FCC-hh hadron collider, development of high-field magnets, hadron injector options, and key technical systems for FCC-hh.

Benedikt, M. [European Organization for Nuclear Re↗

Assessment of design and location of an active prechamber igniter to enable mixing-controlled combustion of ethanol in heavy-duty engines

Here, this numerical study focuses on assessing the key design parameters of interest for use of an active prechamber igniter as an ignition assistance device to enable mixing-controlled combustion (MCC) of ethanol (E100) in a heavy-duty Caterpillar C9.3B engine. Computational fluid dynamic (CFD) simulations of a baseline diesel and prechamber retrofitted C9.3B at a gross indicated mean effective pressure (IMEPg) of 5 bar and 1800 rpm are carried out using CONVERGE. In particular, the sizing of the prechamber volume, sizing of total orifice cross sectional area (orifice diameter), and location of the prechamber relative to a centrally mounted common rail direct injector are varied to discern the appropriate operational and design characteristics to achieve robust ignition assistance at the selected conditions. Simulation results indicate that use of an active prechamber igniter with E100 as a standalone fuel source can replicate ignition delays and thermal efficiencies similar to diesel combustion at the same engine boundary conditions, thus not requiring any changes to the engine’s air handling system. Igniter mounting location, orifice sizing, and jet targeting were found to have the strongest influence on ignition assistance with preference toward larger orifice diameters that appropriately located heating contributions in near vicinity to the direct injector.

33 ADVANCED PROPULSION SYSTEMS↗

Development of prechamber enabled mixing-controlled combustion strategy for ultra-low methane emissions from lean burn natural gas engines

This numerical study explores the optimization of Prechamber Enabled Mixing-Controlled Combustion (PC-MCC) using natural gas in heavy-duty engines, aiming to enhance combustion efficiency to minimize methane slip and NOx emissions. The approach involves a prechamber ignition system, distinct from conventional spark ignition (SI) systems, to initiate combustion of direct injected natural gas. By leveraging the robust ignition characteristics of the prechamber, the PC-MCC method demonstrates significant potential in achieving efficient combustion akin to diesel engines but with lower greenhouse gas emissions. The research evaluates the effects of various geometric and operational parameters on the combustion process and emissions, including prechamber volume, nozzle diameter, direct injector (DI) geometry, and engine operating strategies. Computational Fluid Dynamics (CFD) simulations are utilized, focusing on a heavy-duty, single-cylinder engine modeled after the Caterpillar C9.3B engine. Key findings indicate that a prechamber volume of 3 cc, coupled with a nozzle diameter of 2.75 mm for two prechamber holes, strikes an optimal balance between combustion efficiency and emissions reduction. This configuration ensures robust combustion across a range of operating conditions while maintaining methane slip within targeted limits. Further investigation into DI geometry shows the significance of the injector umbrella angle and nozzle diameter in shaping the fuel-air mixing and combustion dynamics. An umbrella angle of 130° and a nozzle diameter of 300 microns are identified as optimal, promoting rapid and efficient combustion with minimized methane and NOx emissions. The study also investigates the impact of injection timing and pressure, highlighting their roles in controlling combustion timing and influencing emissions levels. Advanced injection timing is found to be crucial in achieving the desired low methane slip, whereas retarded injection timing assists to reduce NOx emissions while having a slight increase in methane emissions. Operating strategies incorporating various levels of Exhaust Gas Recirculation (EGR) are assessed for their effectiveness in further reducing emissions. The research demonstrates that a judicious combination of internal hot EGR and careful calibration of DI pressure and SOI timing can achieve significant reductions in NOx emissions while keeping methane slip under control. Specifically, an internal EGR level of 15%–25%, combined with DI pressures of 200–300 bar and injection timings at or after top dead center, is recommended. These findings contribute valuable insights into the development of advanced combustion techniques for natural gas engines, offering a viable pathway to reduce methane slip without compromising engine efficiency or performance. The PC-MCC system presents a promising solution for the future of heavy-duty natural gas engine technology to reduce methane emissions.

Nsaif, Osama↗

Optimization of spray breakup model parameters for predicting fuel spray and film characteristics in gasoline direct injection engines

This study investigated the behavior of gasoline direct injection (GDI) sprays using computational fluid dynamics (CFD). The authors developed an approach to identify optimal spray breakup model parameters by evaluating an error function across numerous simulations, with the goal of minimizing discrepancies from experimental data. Using the optimal setup, the simulated spray matched well with projected liquid volume distributions, liquid penetration, and spray width measured in a constant-pressure continuous-flow chamber. To further validate the approach, the same setup was tested across various fuels, injectors, and operating conditions. Subsequently, the optimal setup, along with a recently developed spray-wall interaction model, were applied to a direct-injection spark-ignited engine under late-injection conditions to predict and evaluate fuel film formation and evolution at varying engine coolant temperatures. Here, with the centrally mounted injector directing the spray toward the piston, simulations indicated that the spray tends to impinge on the piston surface. The proposed simulation framework also accurately captured the aggregate film area on the piston surface, aligning with previously published experimental results. Moreover, simulations showed that increasing the coolant temperature from cold start conditions (333 K) to warm conditions (363 K) reduced the fuel mass deposited on the piston by roughly 50%. Furthermore, for the spray-guided engine configuration studied in this work, the CFD model predicted minimal film deposition on the spark plug electrodes regardless of the coolant temperatures due to a relatively weak in-cylinder flow during the compression phase.

Computational fluid dynamics (CFD)↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Previously, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H⁻ beam for injection into the Recycler Ring (RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a cw SRF linac, followed by a ~2-8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed. Research needed to implement the Booster replacement is described.

Neuffer, David V.↗

CONCEPT OF A POLARIZED POSITRON SOURCE FOR CEBAF

Positron beams would provide new and meaningful probes for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab), including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). To address these requirements, a polarized positron injector based upon the bremsstrahlung of an intense CW spin polarized electron beam is considered*. First a polarized electron beam line provides >1 mA of polarized electrons at ~120 MeV to a high-power target for positron production. Next, a second beam line collects, shapes and aligns the spin of positrons for users. Finally, the positron beam is matched into the CEBAF acceptance for acceleration and transport to the end stations with energies up to 12 GeV. An optimized layout to provide positrons beams with intensity >100 nA (polarized) or intensity >3 µA (unpolarized) will be discussed in this poster.

Habet, S. H.↗

Positron beams at Ce+BAF

Positron beams would provide a new and meaningful probe for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab). The JLab Positron Working Group, formed in 2018 and now with over 250 members from 75 institutions, continues to develop an experimental program with high duty-cycle positron beams including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). In this presentation we describe a start-to-end layout for positron beams at 12 GeV CEBAF utilizing the Low Energy Research Facility (LERF) at Jefferson Lab to build two new injectors. A GaAs dc high voltage photo-gun first generates >1 mA of polarized electrons which are then accelerated to 80-150 MeV and directed to a high-power spinning W target for polarized bremsstrahlung and positron pair creation. A second injector then collects, bunches and accelerates the positrons to 123 MeV. The positron beams are transported by a new beam line and injected into the CEBAF acceptance for acceleration to the end stations with energies up to 12 GeV. The layout is optimized to provide Users with positron spin polarization >60% and intensity greater than >100 nA, and with higher intensities when polarization is not required.

Benesch, J.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

A degrader device is being built at the CEBAF injector to degrade the electron beam phase space for machine acceptance studies. The electron beam is degraded through multiple scattering in a thin target before further transport in the injector beamline for injection into CEBAF. The degraded electron beam will approximate phase space distributions expected from a bremsstrahlung-based polarized positron source as in the PEPPo method. The effort is in broader support of the Ce+BAF positron capability that is currently under study. Two options for the degrader device are considered, and simulation results are presented.

Sy, A.↗

Challenges and Optimization of Mu2e Proton Target Design with Radiative Cooling

Mu2e, the Muon-to-Electron Conversion Experiment, aims to identify physics beyond the Standard Model, namely, the conversion of muons to electrons without the emission of neutrinos. The muons are produced from pions generated in a production target when it is hit by an 8 GeV proton beam from the Fermilab Booster/Main Injector. The proton target design space is strongly constrained by a one-year operating lifetime and the need for radiative cooling in a vacuum environment. Uncertainties in the lifetime of the existing baseline design – a monolithic, segmented tungsten target – are large, particularly due to unknown impacts of radiation damage at the very high proton fluences expected in the experiment. We have begun evaluation of a new design utilizing Inconel 718 over the WL10 used in the existing target design. As a result, the structural design of the target has evolved significantly. This evolution focuses on lowering the target temperature, minimizing obstruction to muons, increasing structural stability, maximizing fatigue lifetime, simplifying the fabrication process, and more. The thermal management, structural stability and fatigue lifetime are emphasized here. These optimizations have led to a promising new target design for the Mu2e experiment.

Liu, Z. [Fermilab]↗

High-Gradient Wien Spin Rotators at Jefferson Lab

Nuclear physics experiments performed in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) require spin manipulation of electron beams. Two Wien spin rotators in the injector keV region are essential at CEBAF to establish longitudinal polarization at the end station target, and to flip the polarization direction by ? rad to rule out false asymmetries. In a Wien filter, the homogeneous and independent electric and magnetic fields, along with the velocity vectors of the electrons that traverse it, form a mutually orthogonal system. The magnitude of the electrostatic field, established by biasing two highly-polished electrodes, defines the desired spin angle at the target yet deviates the beam trajectory due to the Lorentz force. The beam trajectory in the Wien is then re-established by adjusting the magnetic field, induced by an electromagnet encasing the device vacuum chamber. This contribution describes the evolution design and high voltage testing of Wien filters for spin manipulation at increased beam energies in the keV injector region, required by high precision parity violation experiments like MOLLER.

Palacios Serrano, G. G.↗

Beam halo formation with different cathode distributions

Beam halo refers to the low-density distribution of particles extending beyond the beam core, and its generation and mitigation are important topics in particle accelerator design. Effective mitigation of beam halo is essential for the cooler design based on Energy Recovery Linac (ERL), which must deliver an electron beam with average beam current of 100 mA and a charge 1 nC per bunch. In the ERL injector and booster linacs, space charge effects are stronger due to relatively low beam energy (6 MeV). Additionally, the longer bunch length of approximately 100 ps in this regime vs the RF period of 5.08 ns makes the formation of beam halos more likely. Therefore, effective collimation of beam halo is critical to maintaining the required beam parameters. To design an effective collimation scheme, several halo distributions were generated at the cathode and used to study halo formation within the injector-merger. This paper presents different halo distributions and halo formation, providing insights on halo collimation strategy.

Accelerator Physics↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

BEAM ACCELERATION WITH A Nb3Sn CRYOMODULE AT JLAB

We report on the electron beam acceleration experiment with a Nb3Sn cryomodule at Thomas Jefferson National Laboratory (JLAB). Two CEBAF-style 5-cell 1.5 GHz Nb3Sn cavities operated at 4 K, accelerating a 100 nA continuous-wave (CW) electron beam from 200 keV to 4 MeV at JLAB’s Upgraded Injector Test Facility (UITF). The acceleration gradients in each cavity reached 11 MV/m and 7 MV/m, respectively. No field emission was observed. The unloaded quality factors reached 2¿109 at low fields at 4 K.

Geng, R. [Thomas Jefferson National Accelerator Fa↗

History Matching and Performance Prediction of a Polymer Flood Pilot in Heavy Oil Reservoir on Alaska North Slope

The first-ever polymer flood pilot to enhance heavy oil recovery on Alaska North Slope (ANS) is ongoing. After more than 2.5 years of polymer injection, significant benefit has been observed from the decrease in water cut from 65% to less than 15% in the project producers. The primary objective of this study is to develop a robust history-matched reservoir simulation model capable of predicting future polymer flood performance. In this work, the reservoir simulation model has been developed based on the geological model and available reservoir and fluid data. In particular, four high transmissibility strips were introduced to connect the injector-producer well pairs, simulating short-circuiting flow behavior that can be explained by viscous fingering and reproducing the water cut history. The strip transmissibilities were manually tuned to improve the history matching results during the waterflooding and polymer flooding periods, respectively. It has been found that higher strip transmissibilities match the sharp water cut increase very well in the waterflooding period. Then the strip transmissibilities need to be reduced with time to match the significant water cut reduction. The viscous fingering effect in the reservoir during waterflooding and the restoration of injection conformance during polymer flooding have been effectively represented. Based on the validated simulation model, numerical simulation tests have been conducted to investigate the oil recovery performance under different development strategies, with consideration for sensitivity to polymer parameter uncertainties. The oil recovery factor with polymer flooding can reach about 39% in 30 years, twice as much as forecasted with continued waterflooding. Besides, the updated reservoir model has been successfully employed to forecast polymer utilization, a valuable parameter to evaluate the pilot test’s economic efficiency. All the investigated development strategies indicate polymer utilization lower than 3.5 lbs/bbl in 30 years, which is economically attractive.

Wang, Xindan↗

Advancing Pressure Gain Combustion for Terrestrial Turbine Systems

The principal objectives of this project were to demonstrate the operability of a natural gas - air RDE at gas turbine engine cycle conditions. To achieve these goals, our specific tasks were to 1) characterize the dynamic injection and mixing performance of candidate injectors, 2) assess the engine operability via interrogation of spatio-temporal dynamics of combustor inlet and exit flows, 3) measure the engine emissions, and 4) complete an overall assessment of the pressure gain potential of the device. In order to advance RDE technology to the greatest extent possible, the reactants and experimental conditions were chosen to replicate combustor and injector conditions in a terrestrial power generation system. This path was taken because the scaling of combustion devices is, in general, an immature area given the challenges of interrelated mixing and chemical kinetics processes both of which scale with operating conditions.

03 NATURAL GAS↗