Search NASA⌕ Search

SEARCH · Search NASA

Results for “interconnected systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Using Distributed Energy Resources to Supply Reactive Power for Dynamic Voltage Regulation

Abstract Distributed energy (DE) resources are power sources located near load centers and equipped with power electronics converters to interface with the grid, therefore it is feasible for DE to provide reactive power (along with active power) locally for dynamic voltage regulation. In this paper, a synchronous condenser and a DE source with an inverter interface are implemented in parallel in a distribution system to regulate the local voltage. Developed voltage control schemes for the inverter and the synchronous condenser are presented. Experimental results show that both the inverter and the synchronous condenser can regulate the local voltage instantaneously although the dynamic response of the inverter is much faster than the synchronous condenser. In a system with multiple DEs performing local voltage regulation, the interaction of multiple DE at different locations under different load levels may have an impact to the control parameter setting for each individual DE control system. Future research is needed to find out the interaction of DEs to identify the optimal control parameter settings with the consideration of many factors such as system configuration, load variation, and so on

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Updating Interconnection Screens for PV System Integration

This white paper evaluates the origins and usefulness of the capacity penetration screen, offer short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen. Short-term andlonger-term alternatives approaches are offered as examples; however, specific modifications to screening procedures should be discussed with stakeholders and must ultimately be adopted by state and federal regulatory bodies.

14 SOLAR ENERGY↗

Probing Signal Design for Power System Identification

This paper investigates the design of effective input signals for low-level probing of power systems. In 2005, 2006, and 2008 the Western Electricity Coordinating Council (WECC) conducted four large-scale system wide tests of the western interconnected power system where probing signals were injected by modulating the control signal at the Celilo end of the Pacific DC intertie. A major objective of these tests is the accurate estimation of the inter-area electromechanical modes. A key aspect of any such test is the design of an effective probing signal that leads to measured outputs rich in information about the modes. This paper specifically studies low-level probing signal design for power-system identification. The paper describes the design methodology and the advantages of this new probing signal which was successfully applied during these tests. This probing input is a multi-sine signal with its frequency content focused in the range of the inter-area modes. The period of the signal is over two minutes providing high-frequency resolution. Up to 15 cycles of the signal are injected resulting in a processing gain of 15. The resulting system response is studied in the time and frequency domains. Because of the new probing signal characteristics, these results show significant improvement in the output SNR compared to previous tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supervised Learning for Distribution Secondary Systems Modeling: Improving Solar Interconnection Processes

The current interconnection process and hosting capacity analysis for distributed energy resources (DERs), such as photovoltaics (PV) and battery energy storage systems, are based on analyzing grid network constraints (voltage and thermal) using only medium-voltage distribution network models. This is because most utilities do not have secondary low-voltage system models that connect service transformers and residential customers. This is important because in many cases the main impact of interconnecting DERs could occur on the low-voltage distribution systems. This paper proposes a supervised learning method to approximate local secondary models to improve the interconnection process. The proposed supervised learning method includes a decision tree model that predicts the secondary topology and a logistic regression model that predicts conductor types. The case studies demonstrate the benefits of including secondary low-voltage circuits in the interconnection process. We report the proposed modeling methodology is readily scalable and thus can reduce the cost and effort of PV interconnection for the industry and stakeholders.

14 SOLAR ENERGY↗

Evaluating How Climate Adaptation Measures Affect the Interconnected Water‐Energy Resource Systems of the Western United States

Abstract The Western US faces increasing water stress from the impacts of climate change, making it difficult to meet water demands for the region's cities, agriculture, and hydropower generators. Existing literature suggests that climate adaptation measures such as water conservation, cropland retirement, wastewater recycling, and managed aquifer recharge can alleviate some of these challenges. Few analyses, however, compare the relative efficacy and system‐wide effects of these adaptations under different climate projections across the entire Western United States. Here we use a Western US‐wide water systems model to evaluate, by sector and sub‐region, how the widespread implementation of these adaptive measures impacts water demands, water deliveries, and electricity use related to the water system for three different climate projections. We find that wastewater recycling has greater potential to lower unmet indoor water demands than urban indoor water conservation measures. However, when implemented at scale, indoor water conservation reduces electricity use by an average of 683 Terawatt hours while wastewater recycling increases energy use by an average of 721 Terawatt hours, cumulatively from 2020 to 2070. Cropland retirement and aquifer recharge adaptations increase the ability to meet agricultural water demand, increase groundwater storage, and reduce summertime electricity use. While most of these findings are consistent across different climate projections, the benefits of aquifer recharge are sensitive to spatial variation of precipitation. Given the limitations and tradeoffs of each individually, the results suggest that a portfolio of adaptation measures will be needed for a climate‐resilient water and energy future in the Western US. Plain Language Summary The Western US faces increased water stress from the impacts of climate change, making it difficult to meet demands for cities, agriculture, and hydropower facilities. Adaptation measures like water conservation, retiring agricultural lands, recycling wastewater, and storing water underground can address these challenges. However, there is little modeling to understand the impact of these adaptations if they were implemented across the entire Western US while also considering climate change. We use a Western US‐wide water systems model to evaluate how implementing adaptation measures impacts groundwater levels, the ability to meet water demands, and electricity use related to water in three different possible climate futures. We find that recycling wastewater to drinking water standards does a better job of meeting urban water demands than water conservation measures. However, indoor water conservation reduces energy use for water while recycling wastewater increases energy use for water. Retiring agricultural lands and storing water underground both increase the ability to meet agricultural water demands, increase underground water storage, and reduce summertime energy use. No adaptation measures provides benefits across every metric we track. Therefore, multiple adaptation measures will likely be needed to achieve a climate‐resilient future for energy and water in the Western US. Key Points Water‐related climate change adaptations have different benefits and tradeoffs for interconnected water‐energy systems in the Western U.S. Wastewater recycling most increases urban water coverage, but has a significant tradeoff in the form of greater electricity use Cropland retirement and aquifer recharge benefit water and electricity systems most in the summer when those systems are most stressed

Singhal, A↗

Scheduled Peripheral Component Interconnect Arbiter

Systems and methods are described for arbitrating access of a communication bus. In one embodiment, a method includes performing steps on one or more processors. The steps include: receiving an access request from a device of the communication bus; evaluating a bus schedule to determine an importance of the device based on the access request; and selectively granting access of the communication bus to the device based on the importance of the device.

Nixon, Scott Alan↗

Ground-referenced single-ended memory interconnect

A system is provided for transmitting signals. The system comprises a first processing unit, a memory subsystem, and a package. The first processing unit is configured to include a first ground-referenced single-ended signaling (GRS) interface circuit. The memory subsystem is configured to include a second GRS interface circuit. The package is configured to include one or more electrical traces that couple the first GRS interface to the second GRS interface, where the first GRS interface circuit and the second GRS interface circuit are each configured to transmit a pulse along one trace of the one or more electrical traces by discharging a capacitor between the one trace and a ground network.

Dally, William J.↗

Ground-referenced single-ended memory interconnect

A system is provided for transmitting signals. The system includes a ground-referenced single-ended signaling (GRS) driver circuit that is configured to pre-charge a first capacitor to store a first charge between a first output node and a first reference node based on a first input data signal during a first pre-charge phase and drive an output signal relative to a ground network based on the first charge during a first drive phase. A control circuit is configured to generate a first set of control signals based on the first input data signal and a first clock signal, where the first set of control signals causes the first GRS driver circuit to operate in either the first pre-charge phase or in the first drive phase.

Dally, William J.↗

Ground-referenced single-ended signaling connected graphics processing unit multi-chip module

A system of interconnected chips comprising a multi-chip module (MCM) includes a processor chip, a system functions chip, and an MCM package configured to include the processor chip, the system functions chip, and an interconnect circuit. The processor chip is configured to include a first ground-referenced single-ended signaling interface circuit. A first set of electrical traces manufactured within the MCM package and configured to couple the first single-ended signaling interface circuit to the interconnect circuit. The system functions chip is configured to include a second single-ended signaling interface circuit and a host interface. A second set of electrical traces manufactured within the MCM package and configured to couple the host interface to at least one external pin of the MCM package. In one embodiment, each single-ended signaling interface advantageously implements ground-referenced single-ended signaling.

Dally, William J.↗

Asymptotic Stability of Interconnected Passive Non-Linear Systems

This paper addresses the problem of stabilization of a class of internally passive non-linear time-invariant dynamic systems. A class of non-linear marginally strictly passive (MSP) systems is defined, which is less restrictive than input-strictly passive systems. It is shown that the interconnection of a non-linear passive system and a non-linear MSP system is globally asymptotically stable. The result generalizes and weakens the conditions of the passivity theorem, which requires one of the systems to be input-strictly passive. In the case of linear time-invariant systems, it is shown that the MSP property is equivalent to the marginally strictly positive real (MSPR) property, which is much simpler to check.

Isidori, A.↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

USAID Energy Storage Decision Guide for Policymakers

The purpose of this report is to arm relevant decision makers with the initial layer of information they need to understand energy storage and to make informed policy, regulatory, and investment decisions around grid-connected energy storage. While many of the case studies presented in this report are based on experiences from the U.S. and Europe, the lessons learned can be applied to power sectors in emerging economies. Importantly, this report covers topics related grid-connected energy storage for power sector applications. The term “grid-connected” implies that the storage system is interconnected to a centralized power system. Topics related to off-grid, micro-grid and mini-grid energy storage applications are not covered in this report, nor are procurement practices for energy storage.

25 ENERGY STORAGE↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurements over distributed high performance computing and storage systems

Requirements are carefully described in descriptions of systems to be acquired but often there is no requirement to provide measurements and performance monitoring to ensure that requirements are met over the long term after acceptance. A set of measurements for various UNIX-based systems will be available at the 1992 Goddard Conference on Mass Storage Systems and Technologies. The authors invite others to contribute to the set of measurements. The framework for presenting the measurements of supercomputers, workstations, file servers, mass storage systems, and the networks that interconnect them are given. Production control and database systems are also included. Though other applications and third party software systems are not addressed, it is important to measure them as well. The capability to integrate measurements from all these components from different vendors, and from the third party software systems was recognized and there are efforts to standardize a framework to do this. The measurement activity falls into the domain of management standards. Standards work is ongoing for Open Systems Interconnection (OSI) systems management; AT&T, Digital, and Hewlett-Packard are developing management systems based on this architecture even though it is not finished. Another effort is in the UNIX International Performance Management Working Group. In addition, there are the Open Systems Foundation's Distributed Management Environment and the Object Management Group. A paper comparing the OSI systems management model and the Object Management Group model has been written. The IBM world has had a capability for measurement for various IBM systems since the 1970's and different vendors were able to develop tools for analyzing and viewing these measurements. Since IBM was the only vendor, the user groups were able to lobby IBM for the kinds of measurements needed. In the UNIX world of multiple vendors, a common set of measurements will not be as easy to get.

Williams, Elizabeth↗

Viscosity Solutions of Systems of PDEs with Interconnected Obstacles and Switching Problem

This paper deals with existence and uniqueness of a solution in viscosity sense, for a system of m variational partial differential inequalities with inter-connected obstacles. A particular case is the Hamilton-Jacobi-Bellmann system of the Markovian stochastic optimal m-states switching problem. The switching cost functions depend on (t,x). The main tool is the notion of systems of reflected backward stochastic differential equations with oblique reflection.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Wind Generation Participation in Power System Frequency Response: Preprint

The electrical frequency of an interconnected power system must be maintained close its nominal level at all times. Excessive under- and overfrequency excursions can lead to load shedding, instability, machine damage, and even blackouts. There is a rising concern in the electric power industry in recent years about the declining amount of inertia and primary frequency response (PFR) in many interconnections. This decline may continue due to increasing penetrations of inverter-coupled generation and the planned retirements of conventional thermal plants. Inverter-coupled variable wind generation is capable of contributing to PFR and inertia with a response that is different from that of conventional generation. It is not yet entirely understood how such a response will affect the system at different wind power penetration levels. The modeling work presented in this paper evaluates the impact of wind generation's provision of these active power control strategies on a large, synchronous interconnection. All simulations were conducted on the U.S. Western Interconnection with different levels of instantaneous wind power penetrations (up to 80%). The ability of wind power plants to provide PFR - and a combination of synthetic inertial response and PFR - significantly improved the frequency response performance of the system.

17 WIND ENERGY↗