Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

Cotton, William B.↗

Distributed ADMM Using Private Blockchain for Power Flow Optimization in Distribution Network With Coupled and Mixed-Integer Constraints

The optimization problem for scheduling distributed energy resources (DERs) and battery energy storage systems (BESS) integrated with the power grid is important to minimize energy consumption from conventional sources in response to demand. Conventionally this optimization problem is solved in a centralized manner, limiting the size of the problem that can be solved and creating a high communication overhead because all the data is transferred to the central controller. These limitations are addressed by the proposed distributed consensus-based alternating direction method of multiplier (DC-ADMM) optimization algorithm, which decomposes the optimization problem into subproblems with private cost function and constraints. The distribution feeder is partitioned into low coupling subnetworks/regions, which solves the private subproblem locally and exchanges information with the neighboring regions to reach consensus. The relaxation strategy is employed for mixed-integer and coupled constraints introduced in the optimal power flow (OPF) problem by stationary and transportable BESS because DC-ADMM convergence is only guaranteed for strict convex problems. The information exchange and synchronization between subnetworks/regions are vital for distributed optimization. In this work, both of these aspects are addressed by the blockchain. The smart contract deployed on the blockchain network acts as a mediator for secure data exchange and synchronization in distributed computation. The blockchain-based distributed optimization problem’s effectiveness is tested for a 0.5-MW laboratory microgrid for one hour ahead and day-ahead for the IEEE 123-bus and EPRI J1 test feeders, and results are compared with a centralized solution.

25 ENERGY STORAGE↗

Conflict-Aware Scheduling Algorithm

conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

Wang, Yeou-Fang↗

Voltage positioning using co-optimization of controllable grid assets in radial networks

With increasing penetration of solar PV, some distribution feeders are experiencing highly variable net-load flows and even reverse flows. To optimize distribution systems under such conditions, the scheduling of mechanical devices, such as OLTCs and capacitor banks, needs to take into account forecasted solar PV and actual grid conditions. However, these legacy switching assets are operated on a daily or hourly timescale, due to the wear and tear associated with mechanical switching, which makes them unsuitable for real-time control. Therefore, there is a natural timescale- separation between these slower mechanical assets and the responsive nature of inverter-based resources. In this paper, we present a network admissible convex formulation for holistically scheduling controllable grid assets to position voltage optimally against solar PV. An optimal hourly schedule is presented that utilizes mechanical resources to position the predicted voltages close to nominal values, while minimizing the use of inverter-based resources (i.e., DERs), making them available for control at a faster time-scale (after the uncertainty reveals itself). A convex, inner approximation of the OPF problem is adapted to a mixed-integer linear program that minimizes voltage deviations from nominal (i.e., maximizes voltage margins). Here, the resulting OPF solution respects all the network constraints and is, hence, robust against modeling simplifications. Simulation based analysis on IEEE distribution feeders validates the approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emulated Spacecraft Communication Testbed for Evaluating Cognitive Networking Technology

The ability to emulate the full space protocol stack is an essential aspect required to evaluate and mature cognitive communication capabilities. The interaction between the physical layer and network layers is key to developing network optimizations for a dynamic and complex environment. We present a laboratory testbed for the evaluation of cognitive radio and networking techniques applied to space communications. The testbed is a high fidelity, flight-like hardware testbed consisting of software-defined radios, channel emulators, modems, and orbital analysis and scheduling software. The testbed uses RF links with signal quality, propagation delay, and Doppler effects driven by orbital mechanics simulations of emulated spacecraft. Our framework enables control of link bidirectionality, data rates, and interference sources. In addition to hardware radio nodes, the testbed can incorporate virtualized emulated nodes for larger and more challenging network scenarios. Our approach to a cognitive communication system uses delay tolerant networking (DTN) to mitigate the challenges of the space environment. While many DTN networks use only preplanned schedules, our system uses User-Initiated Service (UIS) to dynamically schedule service providers. Software-defined radio allows the system to adapt to a variety of service providers. Integration of DTN, UIS, and software-defined radio technologies provides a framework for the implementation of a cognitive communication system. This paper describes the testbed capabilities, network emulation approach, component integration, and initial end-to-end testing results.

cognitive radio↗

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗

Reliable Transport over SpaceWire for James Webb Space Telescope (JWST) Focal Plane Electronics (FPE) Network

NASA's James Webb Space Telescope (JWST) faces difficult technical and budgetary challenges to overcome before it is scheduled launch in 2010. The Integrated Science Instrument Module (ISIM), shares these challenges. The major challenge addressed in this paper is the data network used to collect, process, compresses and store Infrared data. A total of 114 Mbps of raw information must be collected from 19 sources and delivered to the two redundant data processing units across a twenty meter deployed thermally restricted interface. Further data must be transferred to the solid-state recorder and the spacecraft. The JWST detectors are kept at cryogenic temperatures to obtain the sensitivity necessary to measure faint energy sources. The Focal Plane Electronics (FPE) that sample the detector, generate packets from the samples, and transmit these packets to the processing electronics must dissipate little power in order to help keep the detectors at these cold temperatures. Separating the low powered front-end electronics from the higher-powered processing electronics, and using a simple high-speed protocol to transmit the detector data minimize the power dissipation near the detectors. Low Voltage Differential Signaling (LVDS) drivers were considered an obvious choice for physical layer because of their high speed and low power. The mechanical restriction on the number cables across the thermal interface force the Image packets to be concentrated upon two high-speed links. These links connect the many image packet sources, Focal Plane Electronics (FPE), located near the cryogenic detectors to the processing electronics on the spacecraft structure. From 12 to 10,000 seconds of raw data are processed to make up an image, various algorithms integrate the pixel data Loss of commands to configure the detectors as well as the loss of science data itself may cause inefficiency in the use of the telescope that are unacceptable given the high cost of the observatory. This combination of requirements necessitates a redundant, fault tolerant, high- speed, low mass, low power network with a low Bit error Rate(1E-9- 1E-12). The ISIM systems team performed many studies of the various network architectures that meeting these requirements. The architecture selected uses the Spacewire protocol, with the addition of a new transport and network layer added to implement end-to-end reliable transport. The network and reliable transport mechanism must be implemented in hardware because of the high average information rate and the restriction on the ability of the detectors to buffer data due to power and size restrictions. This network and transport mechanism was designed to be compatible with existing Spacewire links and routers so that existing equipment and designs may be leveraged upon. The transport layer specification is being coordinated with European Space Agency (ESA), Spacewire Working Group and the Consultative Committee for Space Data System (CCSDS) PlK Standard Onboard Interface (SOIF) panel, with the intent of developing a standard for reliable transport for Spacewire. Changes to the protocol presented are likely since negotiations are ongoing with these groups. A block of RTL VHDL that implements a multi-port Spacewire router with an external user interface will be developed and integrated with an existing Spacewire Link design. The external user interface will be the local interface that sources and sinks packets onto and off of the network (Figure 3). The external user interface implements the network and transport layer and handles acknowledgements and re-tries of packets for reliable transport over the network. Because the design is written in RTL, it may be ported to any technology but will initially be targeted to the new Actel Accelerator series (AX) part. Each link will run at 160 Mbps and the power will be about 0.165 Watt per link worst case in the Actel AX.

Rakow, Glenn↗

Distributed Scheduling Architecture for Multi-Center Time-Based Metering

The Traffic Management Advisor (TMA) is an air traffic control automation system currently in use in seven Air Route Traffic Control Centers (ARTCCs) to enable time based metering to busy airports within their airspace. However, this system is limited to operation within a single ARTCC, within about a 200 nautical mile radius of the airport, and on relatively simple streams of traffic. The need for coordinated metering within a greater (300+ nautical mile) radius of an airport, on streams of traffic with significant branching, and across ARTCC boundaries, has been identified. Early tests revealed that TMA could not simply be scaled up to handle such a problem. Instead, a loosely coupled hierarchy of schedules, in which constraints from downstream schedules are passed upstream, is required. Such an architecture reduces the reliance on distant projections of arrival times, making schedules robust to changes in sequence and to additions of aircraft (such as aircraft departing inside the system s scheduling horizon). This architecture is also scaleable, easily reconfigurable, and can be networked together. As such, it can be adapted for use in any size or configuration of airspace and with any number of airports delivering restrictions. An implementation of this distributed scheduling architecture is currently undergoing testing in the TMA-Multi Center system. This paper describes the architecture and its motivation.

Landry, Steven↗

OMP-26 - An interactive scheduling tool for the 26 meter subnetwork

Operations Mission Planner for the 26 Meter (26M) Antenna Subnetwork (OMP-26) is an interactive scheduling tool developed by the Jet Propulsion Laboratory (JPL) to assist in allocating the Deep Space Network (DSN) 26M antennas to support Earth-orbiting Spacecraft (SC). Prior to integrating OMP-26 into the 26M scheduling arena, the text-based, labor-intensive task lacked the sufficient means to support the 1992 mission support increase. Therefore, JPL developed the OMP-26 interactive scheduling tool to automate the time consuming tasks of the existing, manual scheduling process. OMP-26 has addressed the scheduling dilemma by assisting schedulers to identify and resolve conflicts more quickly through its graphical display features and constraint-checking editing capability. Although OMP-26 has reduced the scheduler's existing workload by easing the identification and resolution of conflicts, it will not meet the needs of another mission support increase to occur by 1995. Therefore, future plans for OMP-26 involve transitioning from a solely interactive scheduling tool to one that is highly automated and more powerful.

Rosas, Jody L.↗

Experiments with a Parallel Multi-Objective Evolutionary Algorithm for Scheduling

Evolutionary multi-objective algorithms have great potential for scheduling in those situations where tradeoffs among competing objectives represent a key requirement. One challenge, however, is runtime performance, as a consequence of evolving not just a single schedule, but an entire population, while attempting to sample the Pareto frontier as accurately and uniformly as possible. The growing availability of multi-core processors in end user workstations, and even laptops, has raised the question of the extent to which such hardware can be used to speed up evolutionary algorithms. In this paper we report on early experiments in parallelizing a Generalized Differential Evolution (GDE) algorithm for scheduling long-range activities on NASA's Deep Space Network. Initial results show that significant speedups can be achieved, but that performance does not necessarily improve as more cores are utilized. We describe our preliminary results and some initial suggestions from parallelizing the GDE algorithm. Directions for future work are outlined.

scheduling↗

Sheaf Theoretic Models for Routing in Delay Tolerant Networks

One key to communications scalability is routing; as such the goal of this paper is to build upon successful efforts towards general routing for space-based networks. With the ever-increasing accessibility of space, the number of assets is increasing, which becomes a critical communications burden in terms of scheduling, spectrum allocation, and resource allocation. In order to mitigate these concerns, a true networking approach is necessary; a standard approach for space systems is Delay Tolerant Networking (DTN). For DTN to be a meaningful answer to the Solar System Internet (SSI) question, DTN must offer meaningful routing solutions that span the heterogeneous collection of links and nodes. This, in turn, depends on the general structure of these disconnected networks -- a structure that remains largely unknown. In ground communications networks, routing decisions are made based on several pathfinding algorithms working in tandem. In previous work, we modeled Dijkstra's pathfinding algorithm using sheaves and provided a more general framework for determining paths using sheaves over graphs. Continuing our sheaf-theoretic approach, we introduce here an expansion of our pathfinding sheaf to handle more general information, and we expand on additional pathfinding algorithms that can be represented using sheaves. Moreover, we demonstrate means of combining multiple algorithms into a single sheaf structure so that changes of scale can be presented in the language of sheaves. In addition, space communications networks rely upon radio transmitter antennas which can establish broadcast and multicast communications options, rather than the primarily unicast options available to wired networks. Last year, we also introduced a multicast routing sheaf for presenting broadcast, unicast, and multicast communications over a graph. Extending that work, we also introduce queuing sheaves so that we can blend these communications options together to simulate a variety of routing options across space networks. In addition, we include examples to illustrate the applicability of this abstract theory to routing in disconnected networks.

Robert Short↗

Virtual Mission Operations of Remote Sensors With Rapid Access To and From Space

This paper describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the United Kingdom Disaster Monitoring Constellation (UK-DMC), is used as the space-based sensor. The UK-DMC s availability is determined via machine-to-machine communications using SSTL s mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL s and Universal Space Network s (USN) ground assets. The availability and scheduling of USN s assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards.

Ivancic, William D.↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging

This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedules, and more. Outcomes indicate that the existing charging network in New York City is not adequate even in the most optimistic scenario; 1,054 150-kW ports are required when 15% of drivers have access to overnight charging, whereas 367 150-kW ports are needed when 100% of drivers have access. Results also indicate that although charging is demanded in areas nearby high trip demand, fast charging ports are also demanded in areas near driver residences as a supplement for home charging in scenarios with limited overnight charging access. These findings motivate investment into both overnight charging and public fast charging to meet the charging demands of ride-hailing fleets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar power satellite system definition study. Volume 1: Executive summary

Configuration concepts, option sizes, and systems definitions study design evolutions are reviewed. The main features of the present reference design silicon solar cell solar power satellite are described, as well as the provisions for space construction and support systems. The principal study accomplishments and conclusions are summarized according to the following tasks: (1) baseline critique; (2) construction and maintenance; (3) industrial complex needs, cost estimates, and production capacity; (4) launch complex requirements at KSC or at an offshore facility; (5) integration of the SPS/ground power network; (6) technology advancement and development; (7) costs and schedules; and (8) exploratory technology: laser annealing of solar cells degraded by proton irradiation, and a fiber-optic phase distribution link at 980 MHz.

Source record↗

Evolutionary space platform concept study. Volume 3: Programmatics for manned space platform concepts

The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.

Source record↗

Request Generation 2 mission planning and scheduling

Request Generation II (ReGe II) is a PC-based prototype knowledge based system intented to assist USAF personnel in planning and scheduling satellite operations for their Mission Control Complexes (MCC). It aids MCC personnel in producing weekly Program Action Plans (PAPs) for each of the satellite vehicles an MCC is responsible for monitoring and maintaining. The PAPs are input to the Resource Control Complex (RCC) which schedules all satellite support requests for usage of the network.

Greenhut, Darlene D.↗