Search NASA⌕ Search

SEARCH · Search NASA

Results for “operational data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Modeling Study of Reduced Tubing Size Effects on Flow in Depleted Reservoir Natural Gas Storage Wells

This report explores the effects of tubing size reductions on natural gas flow from representative depleted reservoir underground storage wells and fields using basic models for coupled reservoir and pipe flow. This work was motivated by interest at the U.S. Department of Transportation, Pipeline and Hazardous Materials Safety Administration, in evaluating the effects of tubing and packer as a potential safety upgrade to implement double-barrier systems to existing underground natural gas storage wells. Reservoir and well flow models were developed from widely accepted industry equations, verified against a commercial process simulator model, and validated against field data. The study utilized U.S. operator survey data to provide context and assure that modeling parameters including aver age deliverability rates for wells and fields, operating pressures, well depths, and storage capacities were all carefully considered to keep the modeling relevant to the known range of U.S. operations. The models generally found that wells and fields with inherently low deliverability were relatively insensitive to reductions in tubing diameter, primarily because the hydraulics in those cases were controlled by reservoir properties. For the high-producing wells and fields, the models found that reducing tubing diameter could produce significant reductions in deliverability, both at the field- and well-level. When put into context with occurrence data regarding average deliverability of fields and wells, it appears that most wells and most fields across the U.S. would experience deliverability reductions on the low end of what was simulated here, generally below 20%. For fields with moderate to high deliverability, reductions were generally larger, and could reach as high as 60% for the highest-producing wells and fields.

03 NATURAL GAS↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Dataset from ORNL Flexible Research Platform (FRP)

The data comes from a two-story light commercial building which can be used to physically simulate light commercial buildings common in the nation's existing building stock. Based on a data collection plan, these measurements were performed for five different building operations. In the data set for each period, 98 data variables were selected and collected, in which 7 variables are weather data and the rest are all building and system operation data.

Cui, Borui↗

Best Practices for Nuclear Experiment Data Preservation at Idaho National Laboratory: A Guide for Researchers and Reactor Operators

Preserving experimental data is essential for supporting advancements in nuclear science and ensuring the longevity of Idaho National Laboratory's contributions to reactor technology and safety. This report provides a comprehensive guide to best practices for experimental data management and preservation, focusing on standardized data formats, redundancy in storage, metadata documentation, and alignment with international standards. By following these recommendations, experimentalists and reactor operators can enhance the accessibility, reproducibility, and utility of critical datasets for regulatory review, validation computational methods, and future research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bayesian operator inference for data-driven reduced-order modeling

This work proposes a Bayesian inference method for the reduced-order modeling of time-dependent systems. Informed by the structure of the governing equations, the task of learning a reduced-order model from data is posed as a Bayesian inverse problem with Gaussian prior and likelihood. The resulting posterior distribution characterizes the operators defining the reduced-order model, hence the predictions subsequently issued by the reduced-order model are endowed with uncertainty. The statistical moments of these predictions are estimated via a Monte Carlo sampling of the posterior distribution. Since the reduced models are fast to solve, this sampling is computationally efficient. Furthermore, the proposed Bayesian framework provides a statistical interpretation of the regularization term that is present in the deterministic operator inference problem, and the empirical Bayes approach of maximum marginal likelihood suggests a selection algorithm for the regularization hyperparameters. The proposed method is demonstrated on two examples: the compressible Euler equations with noise-corrupted observations, and a single-injector combustion process.

97 MATHEMATICS AND COMPUTING↗

Advanced Cost-Effective Coal-Fired Rotating Detonation Combustor for High Efficiency Power Generation

Coal-based detonation as a means of heat addition in power generation devices is a revolutionary “out of the box” technology concept, wherein it is theoretically possible to achieve an increase in total pressure across the combustor as opposed to a loss of available energy as is the case in conventional combustion systems. Detonation is a revolutionary technology concept of pressure gain combustion that exploits pressure rise from the combustion process to augment high flow momentum and pressures. Recognizing that pressure gain combustion has become a topic of elevated national interest, high energetic modes (exergy) pressure gain combustion (PGC) systems are required. Pressure gain combustion is a key enabling technology for maintaining technological superiority in the development of advanced power generation systems. Pressure gain combustion is an innovative scheme of turbulent combustion that considerably increases thermodynamic cycle efficiencies (~10-20%). This project extends the State-of-the-Art by providing the first direct experimental and computational data of operability dynamics and performance characterization data and create the first validated Coal-Fired RDC investigations. Coal-based RDC is an innovative revolutionary technology that would result in high efficiency power generation and reduced of harmful emissions. Also, the fundamental and open source nature of the project will benefit a broader scientific and industry audience who will be able to utilize the outcomes of this project for advancing the coal-fired RDC power generation development.

01 COAL, LIGNITE, AND PEAT↗

Dataset for Evaluation of Extreme Weather Impacts on Utility-Scale Photovoltaic Plant Performance in the United States

This dataset is a fusion of three data types (operations and maintenance tickets, weather data, and production data) that was used to support machine learning analysis and evaluation of drivers for low performance at photovoltaic (PV) sites during compound, extreme weather events. After being processed with machine learning, the data was used in the "Evaluation of Extreme Weather Impacts on Utility-scale Photovoltaic Plant Performance in the United States" manuscript. Additional details are captured in the associated manuscript.

AI↗

Next-Level Energy Management in Manufacturing: Facility-Level Energy Digital Twin Framework Based on Machine Learning and Automated Data Collection

This research introduces an energy prediction framework at the facility level supported by automated data collection and machine learning models. It investigates whether reducing the prediction time scale allows for applying more complex machine learning techniques and if those techniques improve the prediction accuracy. The primary advantages of this framework lie in its automation of the energy prediction process and its provision of real-time energy data suitable for use in energy dashboards or digital twins. A sitewide dataset was created by combining 15 min energy and daily production data of five shops—assembly, battery, body (electric), body (gas), and paint—from a globally recognized electric vehicle manufacturer. Various machine learning models were evaluated on daily, weekly, and monthly datasets, including, in increasingly complex order: naïve, simple linear regression, net regularized generalized linear regression, principal component regression, k-nearest neighbor, random forest, and Bayesian regularized neural network. Compared to the current state-of-the-art energy consumption prediction for the industrial facility level, this research investigates more complex models and smaller time intervals for higher accuracy. The findings revealed that the more complex monthly models require a minimum of a year and a half of data to operate, while weekly models demand a year of data to achieve improved accuracy. Daily models can operate with only six months of data but exhibit poor performance due to reduced prediction accuracy of production. Key challenges identified include access to reliable, high-quality energy and production data and the initial demand for human labor.

digital twin↗

Data-driven linear time advance operators for the acceleration of plasma physics simulation

In this study, we demonstrate the application of data-driven linear operator construction for time advance with a goal of accelerating plasma physics simulation. We apply dynamic mode decomposition (DMD) to data produced by the nonlinear SOLPS-ITER (Scrape-off Layer Plasma Simulator - International Thermonuclear Experimental Reactor) plasma boundary code suite in order to estimate a series of linear operators and monitor their predictive accuracy via online error analysis. We find that this approach defines when these dynamics can be represented by a sequence of approximate linear operators and is essential for providing consistent projections when compared to an unconstrained application. For linear diffusion and advection–diffusion fluid test problems, we construct and apply operators within explicit and implicit time advance schemes, demonstrating that stability can be robustly guaranteed in each case. We further investigate the use of the linear time advance operators within several integration methods including forward Euler, backward Euler, and the matrix exponential. The application of this method to simulation data from SOLPS-ITER, with varying levels of Markov chain Monte Carlo numerical noise, shows that constrained DMD operators yield a capability to identify, extract, and integrate a (slow) subset of the present timescales. Example applications show that for projected speedup factors of [Formula: see text], and [Formula: see text], a mean relative error of 3%, 5%, and 8% and maximum relative error less than 20% are achievable, which appears acceptable for typical SOLPS-ITER steady-state simulations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Application of Advanced Metering Infrastructure Data to Advanced Utility System Operations: Cooperative Research and Development, CRADA Number CRD-17-00712 (Final Report)

The primary objective of the proposed project is to evaluate the capabilities of Advanced Metering Infrastructure (AMI) based controls for grid operations. This includes monitoring and control at the secondary transformer level using existing AMI infrastructure. In addition, some of the challenges of using a model-less control will also be identified. The lessons learned will be disseminated to other utilities around the country through peer-reviewed publications with the consent of SDG&E. The scope of the work includes using data from SDG&E's existing AMI infrastructure and working with third party vendors selected by SDG&E. The grid edge monitoring systems and controls provided by the selected vendors will perform grid operations using AMI data. The National Renewable Energy Laboratory (NREL) will perform a software and controller-based evaluation of the grid edge controller, intelligent devices and sensors, at the Energy System Integration Facility (ESIF) laboratory.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RTN-008: Rubin Observatory Processing of Gravitational Wave TOO Data in the Early Operations Era

Since the watershed discovery of an electromagnetic counterpart to the LIGO/VIRGO gravitational wave source GW170817, multi-messenger astrophysics has emerged as a major area of strategic focus for the NSF. Rubin Observatory’s depth, survey speed, and data management systems will make it a key asset in the search for EM counterparts. Exploiting this capability during the phases of Rubin commissioning and early operations that coincide with GW observing run O4 may require special actions, however. We discuss potential approaches to data access, template building, and special data processing.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrating tactical planning, operational planning and scheduling using data-driven feasibility analysis

Supply chain operations and scheduling are well-studied problems in the literature. Although these problems are related, they are often solved sequentially. This uncoordinated approach usually leads to sub-optimal solutions. Here this paper proposes a methodology for integrating scheduling operations into the supply chain network, motivated by the available enterprise data, and feasibility analysis. Existing literature on integrated models for addressing the supply chain is reviewed and classified. Then the mathematical model formulation for each level is discussed, after which the proposed data-driven integrated framework is described. The methodology is tested on two different case studies of varying dimensions. For each case study, the solution solves a multi-objective problem with the overall aim of an optimal solution that is robust towards achieving optimal cost while keeping customer satisfaction in mind.

42 ENGINEERING↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Firearm discharge location systems and methods

Firearm discharge location systems and methods are described. According to one aspect, a firearm discharge location system includes a plurality of microphones spaced from one another, timing circuitry configured to generate a plurality of asynchronous timing references, wherein data capture operations with respect to the microphones of a first pair are synchronized with one another using a first of the timing references and data capture operations with respect to the microphones of a second pair are synchronized with one another using a second of the timing references, and processing circuitry configured to use outputs of the first and second pairs of the microphones to identify a location of a firearm discharge.

Gonzalez, Eric G.↗

Polynomial chaos expansions on principal geodesic Grassmannian submanifolds for surrogate modeling and uncertainty quantification

In this work we introduce a manifold learning-based surrogate modeling framework for uncertainty quantification in high-dimensional stochastic systems. Our first goal is to perform data mining on the available simulation data to identify a set of low-dimensional (latent) descriptors that efficiently parameterize the response of the high-dimensional computational model. To this end, we employ Principal Geodesic Analysis on the Grassmann manifold of the response to identify a set of disjoint principal geodesic submanifolds, of possibly different dimension, that captures the variation in the data. Since operations on the Grassmann require the data to be concentrated, we propose an adaptive algorithm based on Riemannian K-means and the minimization of the sample Fréchet variance on the Grassmann manifold to identify “local” principal geodesic submanifolds that represent different system behavior across the parameter space. Polynomial chaos expansion is then used to construct a mapping between the random input parameters and the projection of the response on these local principal geodesic submanifolds. Here, the method is demonstrated on four test cases, a toy-example that involves points on a hypersphere, a Lotka-Volterra dynamical system, a continuous-flow stirred-tank chemical reactor system, and a two-dimensional Rayleigh-Bénard convection problem.

42 ENGINEERING↗

Porting ATLAS Fast Calorimeter Simulation to GPUs with Performance Portable Programming Models

FastCaloSim is a parameterized simulation of the particle energy response and of the energy distribution in the ATLAS calorimeter. It is a relatively small and self-contained package with massive inherent parallelism and captures the essence of GPU offloading via important operations like data transfer, memory initialization, floating point operations, and reduction. It was identified by the High Energy Physics Center for Computational Excellence project as a good testbed for evaluating the performance and ease of portability of programming models. In this paper, we will discuss the results of our evaluation of the porting process to Kokkos, SYCL, Alpaka, OpenMP and std::par (nvc++), and compare performance on NVIDIA, AMD and Intel GPUs, as well as multicore CPUs.

97 MATHEMATICS AND COMPUTING↗