Search NASA⌕ Search

SEARCH · Search NASA

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

EVA 2010: Preparing for International Space Station EVA Operations Post-Space Shuttle Retirement

The expected retirement of the NASA Space Transportation System (also known as the Space Shuttle ) by 2011 will pose a significant challenge to Extra-Vehicular Activities (EVA) on-board the International Space Station (ISS). The EVA hardware currently used to assemble and maintain the ISS was designed assuming that it would be returned to Earth on the Space Shuttle for refurbishment, or if necessary for failure investigation. With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (Extra-vehicular Mobility Unit (EMU), Airlock Systems, EVA tools, and associated support hardware and consumables) to perform ISS EVAs until 2015, and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, the EVA 2010 Project was jointly initiated by NASA and the OneEVA contractor team. The challenges addressed were to extend the operating life and certification of EVA hardware, to secure the capability to launch EVA hardware safely on alternate launch vehicles, to protect for EMU hardware operability on-orbit, and to determine the source of high water purity to support recharge of PLSSs (no longer available via Shuttle). EVA 2010 Project includes the following tasks: the development of a launch fixture that would allow the EMU Portable Life Support System (PLSS) to be launched on-board alternate vehicles; extension of the EMU hardware maintenance interval from 3 years (current certification) to a minimum of 6 years (to extend to 2015); testing of recycled ISS Water Processor Assembly (WPA) water for use in the EMU cooling system in lieu of water resupplied by International Partner (IP) vehicles; development of techniques to remove & replace critical components in the PLSS on-orbit (not routine); extension of on-orbit certification of EVA tools; and development of an EVA hardware logistical plan to support the ISS without the Space Shuttle. Assumptions for the EVA 2010 Project included no more than 8 EVAs per year for ISS EVA operations in the Post-Shuttle environment and limited availability of cargo upmass on IP launch vehicles. From 2010 forward, EVA operations on-board the ISS without the Space Shuttle will be a paradigm shift in safely operating EVA hardware on orbit and the EVA 2010 effort was initiated to accommodate this significant change in EVA evolutionary history.

Chullen, Cinda↗

NASA Airline Operations Research Center

This is a PowerPoint presentation NASA airline operations center (AOC) research. It includes information on using IBM Watson in the AOC. It also reviews a dispatcher decision support tool call the Flight Awareness Collaboration Tool (FACT). FACT gathers information about winter weather onto one screen and includes predictive abilities. It should prove to be useful for airline dispatchers and airport personnel when they manage winter storms and their effect on air traffic. This material is very similar to other previously approved presentations with the same title.

NASA↗

Integrating Wind Profiling Radars and Radiosonde Observations with Model Point Data to Develop a Decision Support Tool to Assess Upper-Level Winds for Space Launch

On the day-of-launch, the 45th Weather Squadron (45 WS) Launch Weather Officers (LWOs) monitor the upper-level winds for their launch customers to include NASA's Launch Services Program and NASA's Ground Systems Development and Operations Program. They currently do not have the capability to display and overlay profiles of upper-level observations and numerical weather prediction model forecasts. The LWOs requested the Applied Meteorology Unit (AMU) develop a tool in the form of a graphical user interface (GUI) that will allow them to plot upper-level wind speed and direction observations from the Kennedy Space Center (KSC) 50 MHz tropospheric wind profiling radar, KSC Shuttle Landing Facility 915 MHz boundary layer wind profiling radar and Cape Canaveral Air Force Station (CCAFS) Automated Meteorological Processing System (AMPS) radiosondes, and then overlay forecast wind profiles from the model point data including the North American Mesoscale (NAM) model, Rapid Refresh (RAP) model and Global Forecast System (GFS) model to assess the performance of these models. The AMU developed an Excel-based tool that provides an objective method for the LWOs to compare the model-forecast upper-level winds to the KSC wind profiling radars and CCAFS AMPS observations to assess the model potential to accurately forecast changes in the upperlevel profile through the launch count. The AMU wrote Excel Visual Basic for Applications (VBA) scripts to automatically retrieve model point data for CCAFS (XMR) from the Iowa State University Archive Data Server (http://mtarchive.qeol.iastate.edu) and the 50 MHz, 915 MHz and AMPS observations from the NASA/KSC Spaceport Weather Data Archive web site (http://trmm.ksc.nasa.gov). The AMU then developed code in Excel VBA to automatically ingest and format the observations and model point data in Excel to ready the data for generating Excel charts for the LWO's. The resulting charts allow the LWOs to independently initialize the three models 0-hour forecasts against the observations to determine which is the best performing model and then overlay the model forecasts on time-matched observations during the launch countdown to further assess the model performance and forecasts. This paper will demonstrate integration of observed and predicted atmospheric conditions into a decision support tool and demonstrate how the GUI is implemented in operations.

Bauman, William H., III↗

Post-Shuttle EVA Operations on ISS

The expected retirement of the NASA Space Transportation System (also known as the Space Shuttle ) by 2011 will pose a significant challenge to Extra-Vehicular Activities (EVA) on-board the International Space Station (ISS). The EVA hardware currently used to assemble and maintain the ISS was designed assuming that it would be returned to Earth on the Space Shuttle for refurbishment, or if necessary for failure investigation. With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (Extra-vehicular Mobility Unit (EMU), Airlock Systems, EVA tools, and associated support hardware and consumables) to perform ISS EVAs until 2015, and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, the EVA 2010 Project was jointly initiated by NASA and the One EVA contractor team. The challenges addressed were to extend the operating life and certification of EVA hardware, to secure the capability to launch EVA hardware safely on alternate launch vehicles, to protect for EMU hardware operability on-orbit, and to determine the source of high water purity to support recharge of PLSSs (no longer available via Shuttle). EVA 2010 Project includes the following tasks: the development of a launch fixture that would allow the EMU Portable Life Support System (PLSS) to be launched on-board alternate vehicles; extension of the EMU hardware maintenance interval from 3 years (current certification) to a minimum of 6 years (to extend to 2015); testing of recycled ISS Water Processor Assembly (WPA) water for use in the EMU cooling system in lieu of water resupplied by International Partner (IP) vehicles; development of techniques to remove & replace critical components in the PLSS on-orbit (not routine); extension of on-orbit certification of EVA tools; and development of an EVA hardware logistical plan to support the ISS without the Space Shuttle. Assumptions for the EVA 2010 Project included no more than 8 EVAs per year for ISS EVA operations in the Post-Shuttle environment and limited availability of cargo upmass on IP launch vehicles. From 2010 forward, EVA operations on-board the ISS without the Space Shuttle will be a paradigm shift in safely operating EVA hardware on orbit and the EVA 2010 effort was initiated to accommodate this significant change in EVA evolutionary history. 1

West, William↗

NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

Baxley, Brian T.↗

NASA's Earth Science Research and Environmental Predictions

NASA Earth Science program began in the 1960s with cloud imaging satellites used for weather observations. A fleet of satellites are now in orbit to investigate the Earth Science System to uncover the connections between land, Oceans and the atmosphere. Satellite systems using an array of active and passive remote sensors are used to search for answers on how is the Earth changing and what are the consequences for life on Earth? The answer to these questions can be used for applications to serve societal needs and contribute to decision support systems for weather, hazard, and air quality predictions and mitigation of adverse effects. Partnerships with operational agencies using NASA's observational capabilities are now being explored. The system of the future will require new technology, data assimilation systems which includes data and models that will be used for forecasts that respond to user needs.

Hilsenrath, E.↗

Differences in the Optical Characteristics of Continental US Ground and Cloud Flashes as Observed from Space

Continental US lightning flashes observed by the Optical Transient Detector (OTD) are categorized according to flash type (ground or cloud flash) using US National Lightning Detection Network (TM) (NLDN) data. The statistics of the ground and cloud flash optical parameters (e.g., radiance, area, duration, number of optical groups, and number of optical events) are inter-compared. On average, the ground flash cloud-top emissions are more radiant, illuminate a larger area, are longer lasting, and have more optical groups and optical events than those cloud-top emissions associated with cloud flashes. Given these differences, it is suggested that the methods of Bayesian Inference could be used to help discriminate between ground and cloud flashes. The ability to discriminate flash type on-orbit is highly desired since such information would help researchers and operational decision makers better assess the intensification, evolutionary state, and severe weather potential of thunderstorms. This work supports risk reduction activities presently underway for the future launch of the GOES-R Geostationary Lightning Mapper (GLM).

Koshak, William↗

The Integrated Medical Model

The goals of the Integrated Medical Model (IMM) are to develop an integrated, quantified, evidence-based decision support tool useful to crew health and mission planners and to help align science, technology, and operational activities intended to optimize crew health, safety, and mission success. Presentation slides address scope and approach, beneficiaries of IMM capabilities, history, risk components, conceptual models, development steps, and the evidence base. Space adaptation syndrome is used to demonstrate the model's capabilities.

Kerstman, Eric↗

Statistical and Probabilistic Extensions to Ground Operations' Discrete Event Simulation Modeling

NASA's human exploration initiatives will invest in technologies, public/private partnerships, and infrastructure, paving the way for the expansion of human civilization into the solar system and beyond. As it is has been for the past half century, the Kennedy Space Center will be the embarkation point for humankind's journey into the cosmos. Functioning as a next generation space launch complex, Kennedy's launch pads, integration facilities, processing areas, launch and recovery ranges will bustle with the activities of the world's space transportation providers. In developing this complex, KSC teams work through the potential operational scenarios: conducting trade studies, planning and budgeting for expensive and limited resources, and simulating alternative operational schemes. Numerous tools, among them discrete event simulation (DES), were matured during the Constellation Program to conduct such analyses with the purpose of optimizing the launch complex for maximum efficiency, safety, and flexibility while minimizing life cycle costs. Discrete event simulation is a computer-based modeling technique for complex and dynamic systems where the state of the system changes at discrete points in time and whose inputs may include random variables. DES is used to assess timelines and throughput, and to support operability studies and contingency analyses. It is applicable to any space launch campaign and informs decision-makers of the effects of varying numbers of expensive resources and the impact of off nominal scenarios on measures of performance. In order to develop representative DES models, methods were adopted, exploited, or created to extend traditional uses of DES. The Delphi method was adopted and utilized for task duration estimation. DES software was exploited for probabilistic event variation. A roll-up process was used, which was developed to reuse models and model elements in other less - detailed models. The DES team continues to innovate and expand DES capabilities to address KSC's planning needs.

Trocine, Linda↗

Technology Development to Support Human Health and Performance in Exploration Beyond Low Earth Orbit

In the course of defining the level of risks and mitigating the risks for exploration missions beyond low Earth orbit, NASA s Human Research Program (HRP) has identified the need for technology development in several areas. Long duration missions increase the risk of serious medical conditions due to limited options for return to Earth; no resupply; highly limited mass, power, volume; and communication delays. New space flight compatible medical capabilities required include: diagnostic imaging, oxygen concentrator, ventilator, laboratory analysis (saliva, blood, urine), kidney stone diagnosis & treatment, IV solution preparation and delivery. Maintenance of behavioral health in such an isolated, confined and extreme environment requires new sensory stimulation (e.g., virtual reality) technology. Unobtrusive monitoring of behavioral health and treatment methods are also required. Prolonged exposure to weightlessness deconditions bone, muscle, and the cardiovascular system. Novel exercise equipment or artificial gravity are necessary to prevent deconditioning. Monitoring of the degree of deconditioning is required to ensure that countermeasures are effective. New technologies are required in all the habitable volumes (e.g., suit, capsule, habitat, exploration vehicle, lander) to provide an adequate food system, and to meet human environmental standards for air, water, and surface contamination. Communication delays require the crew to be more autonomous. Onboard decision support tools that assist crew with real-time detection and diagnosis of vehicle and habitat operational anomalies will enable greater autonomy. Multi-use shield systems are required to provide shielding from solar particle events. The HRP is pursuing the development of these technologies in laboratories, flight analog environments and the ISS so that the human health and performance risks will be acceptable with the available resources.

Kundrot, C.E.↗

Integrated Demand Management: The FCA Balancing Algorithm

The Collaborative Trajectory Options Program (CTOP) is a new NextGen function that resides within the FAA’s Traffic Flow Management System (TFMS) software. CTOP was designed to be used in the United States’ national airspace to control the distribution of air traffic demand, both temporally and geographically, through a set of Flow Constrained Areas (FCAs). Each FCA is assigned capacity values that represent an estimated upper limit of manageable demand, and CTOP controls to that capacity by using Expect Departure Clearance Time (EDCT) air traffic control clearances, and/or rerouting flights to an alternate FCA or out of the CTOP completely. CTOP’s decisions about which control options best meet system and user needs are based on the Trajectory Options Set (TOS) submitted by airline operators for each flight. The FCA Balancing Algorithm (FBA) described in this document is a proposed decision support capability that generates CTOP capacity entries for FCAs controlling traffic to a common downstream constraint. The FBA provides an equitable distribution of impact, and addresses the added complexity of assigning FCA capacity values for this specific type of use case, greatly simplifying the FAA air traffic manager’s task.

IDM↗

Simulation of Terminal-Area Flight Management System Arrivals with Airborne Spacing

A simulation evaluated the feasibility and potential benefits of using decision support tools to support time-based airborne spacing and merging for aircraft arriving in the terminal area on charted Flight Management System (FMS) routes. Sixteen trials were conducted in each treatment combination of a 2X2 repeated-measures design. In trials 'with ground tools' air traffic controller participants managed traffic using sequencing and spacing tools. In trials 'with air tools' approximately seventy-five percent of aircraft assigned to the primary landing runway were equipped for airborne spacing, including flight simulators flown by commercial pilots. The results indicate that airborne spacing improves spacing accuracy and is feasible for FMS operations and mixed spacing equipage. Controllers and pilots can manage spacing clearances that contain two call signs without difficulty. For best effect, both decision support tools and spacing guidance should exhibit consistently predictable performance, and merging traffic flows should be well coordinated.

Callantine, Todd J.↗

Prediction of Weather Impacted Airport Capacity using Ensemble Learning

Ensemble learning with the Bagging Decision Tree (BDT) model was used to assess the impact of weather on airport capacities at selected high-demand airports in the United States. The ensemble bagging decision tree models were developed and validated using the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) data and weather forecast at these airports. The study examines the performance of BDT, along with traditional single Support Vector Machines (SVM), for airport runway configuration selection and airport arrival rates (AAR) prediction during weather impacts. Testing of these models was accomplished using observed weather, weather forecast, and airport operation information at the chosen airports. The experimental results show that ensemble methods are more accurate than a single SVM classifier. The airport capacity ensemble method presented here can be used as a decision support model that supports air traffic flow management to meet the weather impacted airport capacity in order to reduce costs and increase safety.

Weather impact↗

Methodology Development for Assessment of Spaceport Technology Returns and Risks

As part of Kennedy Space Center's (KSC's) challenge to open the space frontier, new spaceport technologies must be developed, matured and successfully transitioned to operational systems. R&D investment decisions can be considered from multiple perspectives. Near mid and far term technology horizons must be understood. Because a multitude of technology investment opportunities are available, we must identify choices that promise the greatest likelihood of significant lifecycle At the same time, the costs and risks of any choice must be well understood and balanced against its potential returns The problem is not one of simply rank- ordering projects in terms of their desirability. KSC wants to determine a portfolio of projects that simultaneously satisfies multiple goals, such as getting the biggest bang for the buck, supporting projects that may be too risky for private funding, staying within annual budget cycles without foregoing the requirements of a long term technology vision, and ensuring the development of a diversity of technologies that, support the variety of operational functions involved in space transportation. This work aims to assist in the development of in methods and techniques that support strategic technology investment decisions and ease the process of determining an optimal portfolio of spaceport R&D investments. Available literature on risks and returns to R&D is reviewed and most useful pieces are brought to the attention of the Spaceport Technology Development Office (STDO). KSC's current project management procedures are reviewed. It is found that the "one size fits all" nature of KSC's existing procedures and project selection criteria is not conducive to prudent decision-making. Directions for improving KSC's - procedures and criteria are outlined. With help of a contractor, STDO is currently developing a tool, named Change Management Analysis Tool (CMAT)/ Portfolio Analysis Tool (PAT), to assist KSC's R&D portfolio determination. A critical review of CMAT/PAT is undertaken. Directions for the improvement of this tool are provided. STDO and KSC intend to follow up on many, if not all, of the recommendations provided.

Joglekar, Prafulla↗

An Evaluation of a Flight Deck Interval Management Algorithm Including Delayed Target Trajectories

NASA's first Air Traffic Management (ATM) Technology Demonstration (ATD-1) was created to facilitate the transition of mature air traffic management technologies from the laboratory to operational use. The technologies selected for demonstration are the Traffic Management Advisor with Terminal Metering (TMA-TM), which provides precise timebased scheduling in the terminal airspace; Controller Managed Spacing (CMS), which provides controllers with decision support tools enabling precise schedule conformance; and Interval Management (IM), which consists of flight deck automation that enables aircraft to achieve or maintain precise in-trail spacing. During high demand operations, TMA-TM may produce a schedule and corresponding aircraft trajectories that include delay to ensure that a particular aircraft will be properly spaced from other aircraft at each schedule waypoint. These delayed trajectories are not communicated to the automation onboard the aircraft, forcing the IM aircraft to use the published speeds to estimate the target aircraft's estimated time of arrival. As a result, the aircraft performing IM operations may follow an aircraft whose TMA-TM generated trajectories have substantial speed deviations from the speeds expected by the spacing algorithm. Previous spacing algorithms were not designed to handle this magnitude of uncertainty. A simulation was conducted to examine a modified spacing algorithm with the ability to follow aircraft flying delayed trajectories. The simulation investigated the use of the new spacing algorithm with various delayed speed profiles and wind conditions, as well as several other variables designed to simulate real-life variability. The results and conclusions of this study indicate that the new spacing algorithm generally exhibits good performance; however, some types of target aircraft speed profiles can cause the spacing algorithm to command less than optimal speed control behavior.

Swieringa, Kurt A.↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗

Flexible User Radio for Lunar Missions

NASA’s Artemis program and other lunar exploration and development programs are planning over 40 lunar missions before 2030. Lunar missions, both crewed and uncrewed, include orbiters, landers, rovers, and surface stations. All these missions require communications with Earth, either via Direct to Earth (DTE) links or through relays in lunar orbit. Multiple DTE options are available among existing and planned ground stations: Deep Space Network (DSN), European Space Agency, and others. Relay options include the planned Lunar Gateway, LunaNet compliant relays, and some lunar landers propose to launch dedicated orbiters. The dilemma for lunar system designers is to identify a communication link which meets mission requirements but does not have issues of limited access (e.g. DSN is in high demand supporting deep space missions with high priority and some with inflexible schedules), system impacts (high power Radio Frequency (RF) for DTE links), cost (dedicated relay), or operational date. To avoid this difficult decision, a Flexible Radio for Lunar Missions is proposed, which will enable system designs to proceed prior to any final decision on the communication network to be used, by enabling compatibility with any of multiple DTE or orbital relay communication systems. The Flexible Radio will support the necessary frequency, bandwidth, modulation, and power requirements to interoperate with the majority of known or planned DTE or relay systems, and can be designed into a lunar mission without prior knowledge of which link will ultimately be used. Furthermore, the link being used can be changed as needed during the mission, in near real time. The Flexible Radio design will leverage work already completed at NASA in the areas of Wideband RF, Software Defined Radio, Adaptive Coding and Modulation, and Phased Array antennas. The Flexible Radio requires sufficient bandwidth to cover the allocated frequencies for both the operation of links in cislunar space and for space-to-Earth links; the flexibility to support multiple modulations, data rates, and coding schemes; the ability to identify available relays, detect and recognize the signals of those relays, and adapt its own frequency, modulation, symbol rate, and code rate to operate with the detected relay (or DTE station); and finally, it requires appropriate software to support network configuration and interoperability with the detected network. The Flexible Radio can be designed in a sufficiently small, lightweight, and low-power package to be used in a wide variety of lunar systems. The initial implementation, as proposed, will focus on the Ka-band, supporting up to 2 GHz bandwidth around the 27 GHz frequency for return links, and 23 GHz for forward links. Other frequency bands are under consideration for future configurations. The software defined modem will support OQPSK, BPSK, and NASA-defined modulations which also support two-way ranging with data. For near-real time adaptation, the Flexible Radio will scan the sky for available relays, using a phased array antenna with Adaptive/Cognitive Communications. It will then configure for network interoperability supporting DTN and other protocol options. The Flexible Radio will support scheduled connections and on-demand use when available.

Lunar Space Communications↗