Search NASA⌕ Search

SEARCH · Search NASA

Results for “operator support systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Emergency Diesel Generator Reliability and Installation Energy Security

The U.S. Department of Defense’s (DoD’s) fixed installations - or military bases - are a critical element of national security. Military bases support the maintenance and deployment of weapons systems, training and mobilization of combat forces, and provide direct support to combat operations. Fixed installations do not operate without energy and they rely largely on electricity to support critical missions and functions. Installations are dependent on a commercial grid that is vulnerable to disruption due to severe weather, physical attacks, and cyberattacks. This report looks at the impact on the highest priority critical loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Master Services Agreement - Flexible Feeder/Distribution System Support: Cooperative Research and Development (Final Report)

PGE will engage NREL on a broad range of projects related to the integration of distributed energy resources (DERs) into the utility's operations. This portfolio of work could include projects focused on DER adoption models, advanced distribution management system (ADMS) and distributed energy management system (DERMS) design, DER dispatch strategy development, and DER valuation framework development. Additional topics could include long-term energy planning, renewable energy, energy efficiency and demand-side management. As well as technology evaluations and design guidance for building retrofits and new construction projects, energy and energy infrastructure planning, policies, and markets (and their analysis), energy storage, energy security and resilience (including energy system-related cybersecurity), transportation and mobility, technology integration analysis. Additionally, other assistance as requested by PGE consistent with NREL’s expertise.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reliable Protection for an Inverter-Based Resources Dominant Grid: Technology Development and Field Demonstration

The project aimed to address the challenges posed by the rapid growth of inverter-based resources (IBR) such as solar, wind, and battery storage, which have fundamentally changed fault behavior, system strength, and protection performance in bulk power systems. Traditional protection schemes, designed for synchronous generator-dominated grids, are inadequate under high IBR penetration. Overall, the project materially advances protection modeling and simulation capabilities needed to maintain reliable grid protection under high IBR penetration. The results build utility confidence in operating power systems safely and reliably across a wide range of generation mixes, supporting grid modernization goals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

European Union's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement - but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda - whose broad purpose is to raise collective ambition - and the Global Power System Transformation (G-PST) Consortium - whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Chile's Action Plan for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from - other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Chile↗

Australia's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

Australia↗

India's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

United Kingdom's Action Plan for Power Sector Decarbonisation

A collaborative report from the Clean Energy Ministerial (CEM) on Lessons Learned for Rapid Decarbonization of Power Sectors was delivered to energy ministers and presented at CEM13 in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several countries signaled intent to develop Action Plans for power sector decarbonization that will be presented at CEM14 in India. These action plans complement but are differentiated from other international power sector initiatives such as the Breakthrough Agenda whose broad purpose is to raise collective ambition and the Global Power System Transformation (G-PST) Consortium whose goals are to convene power system operators to accelerate research innovations and foster peer learning. These action plans, supported by the 21st Century Power Partnership (21CPP) and other CEM workstreams via direct technical assistance and capacity building, are instead intended to focus on implementation actions given each country's existing power sector goals and activities and are an opportunity for countries to display leadership in power sector decarbonization. These action plans are voluntary, developed by each country individually, and can be viewed as a living document that is subject to change.

decarbonization↗

Assessment of Flow-Enhanced Sensors for Actinide Quantification in MSRs

This report serves as the deliverable for Milestone M2RS-22AN0401062 that is part of Work Package RS-22AN040106 (Flow Enhanced Sensors for MSRs – ANL). The goal of this milestone is to assess the capabilities of flow-enhanced electrochemical sensors (FEES) to quantify actinides in molten salt reactors. Flow enhanced electrochemical sensors are a type of electroanalytical sensor that has been developed at Argonne National Laboratory to be installed directly into MSR flow conduits in order to make measurements of the salt composition. These sensors represent a significant improvement in capabilities compared to earlier electroanalytical sensors that instead can only be operated in quiescent conditions. To support this work, Argonne constructed a molten salt flow system to serve as a testbed for the development of safeguards and process monitoring-relevant sensors in challenging molten salt flow conditions. Through extensive flow testing using UCl3-bearing salts, Argonne has been able to show that the FEES are able to make good measurements of salt composition. Concentration measurements with a mean absolute error of 0.09 wt% have been achieved for representative fuel salt mixtures across a range of UCl3 loadings. Repeatability was also good, with the relative standard deviation from repeated measurements being less than 1.0%. These sensors have also been shown to be able to measure the flow rate of the salt within the flow system’s transfer line. Although the accuracy of the sensors has been good, the sensors have thus far not been able to achieve performance good enough to satisfy the nuclear material accountancy requirements in 10 CFR 74. To do so, accuracy levels of 0.1% must be achieved; the FEES when operated in Argonne’s flow system have so far only been able to achieve relative errors of approximately 5.0%. Much of the error that has been observed at this stage is due to challenges in maintaining a stable salt composition in the molten salt flow system, and it is not believed that there are any inherent flaws in the sensor design. Nonetheless, the high degree of accuracy required by 10 CFR 74 represents a significant challenge, and further design evolution and integration of the sensors into multimodal sensing frameworks will likely be needed to push the measurement accuracy to the needed level.

Moore, Colin E.↗

LANSCE CCL Performance Limits

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). Many factors contribute to the performance limits of the CCL accelerator system. One performance limit is set by the CCL mechanical structure and available cooling. Heating of the structure is ultimately linked to the operating RF duty factor of the CCL. Another performance limit is set by the maximum RF and beam duty factors that can be supported by the 805-MHz klystrons and associated HVDC power supplies. The RF and HVDC systems also set limits for the maximum peak beam current that can be accelerated in the CCL. And finally, a maximum beam current limit is set by the beam dynamics determined by the details of the CCL physics design (number of cells per CCL tank, accelerating gradients, magnetic focusing lattice, beam losses, etc.). This limit can be informed by both simulation results and beam measurement data, if available. A detailed explanation of each performance limit is given in the sections below. The results are summarized in the table below. In all cases, it is assumed that the CCL and the RF system are operating in their nominal beam production configuration – nominal magnet set points and nominal cavity fields, unless otherwise specified.

43 PARTICLE ACCELERATORS↗

Proposed Classifications of Remote Operations for Nuclear Reactors Based on Physical and Cybersecurity Considerations

The incorporation of remote operations into reactor operations is a topic of high interest among advanced and small modular reactor (A/SMR) vendors, with some considering it essential to the success of their business models. However, remote operations are a concept novel to the nuclear industry. While various technical aspects of remote operations have been explored, a significant gap remains in understanding the security implications of integrating remote operations into reactor designs, particularly concerning the security requirements for remote-operations facilities and infrastructure. This report aims to address this gap by first defining classes of remote operation based on the extent of remote access to reactor control systems and grounded in the existing regulatory framework with compatible terminology. Secondly, the report outlines the physical and cybersecurity requirements applicable to remote-operations facilities and infrastructure at each defined class. These requirements are based on existing licensing frameworks provided by 10 Code of Federal Regulations (CFR) Part 50 and 10 CFR Part 52, as well as the upcoming A/SMR licensing framework in the proposed Part 53. The assessment focuses specifically on security regulations, such as 10 CFR Part 73, which includes provisions for both cybersecurity (§ 73.54) and physical security (§ 73.55). This report proposes five classes of remote reactor operations. Class 1 involves remote monitoring only, with no control over reactor systems. Class 2 allows for the remote issuance of allowlisted commands to the reactor facility. Class 3 extends control to non-safety-significant, non-safety-related, or not important to safety systems and equipment. Class 4 permits remote control of safety-significant systems. Finally, Class 5 allows remote control of safety-related systems. It is important to note that these classes were defined purely with functionality in mind, without considering the practicality or feasibility of implementation for each class under current or upcoming regulatory guidance. The intention behind this approach is to enable an assessment of which security requirements apply to each class, allowing readers to evaluate the implementation possibilities for their specific use cases. Following the definition of remote-operation classes, the report assesses the specific physical and cybersecurity requirements applicable to the remote-operations facility and infrastructure within each defined class. This includes defining the types and locations of operators that are possible at each class of operation and, based on operator type and location, as well as functionality within each class, outlining the physical and cybersecurity requirements. By detailing the security requirements by class, the report provides readers with the information needed to determine the type of security program they may need to implement for their desired concept of operation. The next contribution of this report was to assess the practicality of implementing each proposed class of remote operations based upon the security requirement assessment. In short, three of the five proposed remote-operation classes were found to possibly have a practical path forward to implementation under the U.S. regulatory framework. Class 1 remote operations are currently in use in the U.S. while Class 2 and 3 remote operations may be logistically possible to implement under the U.S. regulatory framework. The final two Classes, 4 and 5, would likely be logistically difficult, if not infeasible to implement within the current U.S. physical- and cybersecurity regulatory framework. Given the results of the feasibility assessment, an example architecture is proposed for both Class 2, remote allowlisted commands, and Class 3, remote control of non-safety systems as well as security implication assessments of each architecture. These example implementations are not meant to be prescriptive in terms of how Class 2 or Class 3 remote operations should be deployed; instead, they are intended to be informative to stakeholders on how Class 2 or Class 3 could potentially be applied in order to inform their system design. An example architecture for Class 1 remote monitoring was not provided as Class 1 in already in use in U.S. nuclear operations. Example architectures for Class 4 and Class 5 were not provided due to their assessment of being likely infeasible to implement. The final contribution is an assessment of the physical- and cybersecurity implications of introducing autonomous operations into an A/SMR. What was found was that the security implications can be separated into two cases. Autonomous operations supported by SSCs located only at the reactor site, and autonomous operations supported by SSCs outside of the reactor site. For the first case, the introduction of autonomous systems will likely not change the facility’s requirement to comply with existing cyber and physical security regulation

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Cybersecurity Incident Response Guide for Wind

As wind energy systems become increasingly digitized and interconnected, they face a growing array of cyber threats that can disrupt operations, compromise safety, and trigger cascading impacts across the energy ecosystem. The Wind Incident Response Guide provides a structured, wind-specific framework for preparing for, detecting, responding to, and recovering from cyber incidents. Drawing on lessons from field demonstrations, cyber-physical testbeds, and stakeholder engagement across the wind sector, this guide integrates technical, operational, and regulatory considerations to support asset owners, operators, and responders. It outlines key roles and responsibilities, maps incident response phases to wind-specific scenarios, and highlights applicable laws, regulations, standards, and best practices. By tailoring general cybersecurity principles to the unique architectures and operational constraints of wind systems—including remote access, legacy components, and environmental interfaces—this guide aims to enhance resilience, reduce response time, and support coordinated action across public and private stakeholders. It is intended as a practical resource for utilities, developers, regulators, and emergency managers working to secure the future of wind energy.

17 - WIND ENERGY↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AMPP Division Rack Cards [Posters/Cards]

The Actinide Material Processing and Power (AMPP) Division supports plutonium 238 science and manufacturing for NASA exploration, Defense Programs, Advanced Recovery and Integrated Extraction System (ARIES) for nuclear non-proliferation, Materials Recovery & Recycle to enable the future of our operations, and americium production to support well logging for the United States.

99 GENERAL AND MISCELLANEOUS↗

Qudit Dynamical Decoupling on a Superconducting Quantum Processor

Multilevel qudit systems are increasingly being explored as alternatives to traditional qubit systems due to their denser information storage and processing potential. However, qudits are more susceptible to decoherence than qubits due to increased loss channels, noise sensitivity, and crosstalk. To address these challenges, we develop protocols for dynamical decoupling (DD) of qudit systems based on the Heisenberg-Weyl group. We implement and experimentally verify these DD protocols on a superconducting transmon processor that supports qudit operation based on qutrits (d = 3) and ququarts (d = 4). Specifically, we demonstrate single-qudit DD sequences to decouple qutrits and ququarts from system-bath-induced decoherence. Here we also introduce two-qudit DD sequences designed to suppress the detrimental cross-Kerr couplings between coupled qudits. This allows us to demonstrate a significant improvement in the fidelity of time-evolved qutrit Bell states. Our results highlight the utility of leveraging DD to enable scalable qudit-based quantum computing.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rapidly Deployable Acoustic Monitoring and Localization System Based on a Low-Cost Wave Buoy Platform

The primary objective of this project is to develop a cost-effective, fit-for-purpose environmental monitoring system, “NoiseSpotter®,” that characterizes, classifies, and provides accurate location information for anthropogenic and natural sounds in near real-time. NoiseSpotter was developed to support the evaluation of potential acoustic effects of marine energy (ME) projects. By utilizing a compact array of three acoustic particle motion sensors, NoiseSpotter triangulates individual bearings to provide sound source localization to within 5% accuracy, allowing the ability to discern ME device sounds relative to other confounding sounds in the environment, while providing location estimates to nearby marine mammals for environmental mitigation purposes. The ME industry needs proven solutions to meet environmental impact assessment needs. The NoiseSpotter® includes off-the-shelf, modular components that are easy to assemble and disassemble. Its acoustic particle motion sensors are commercially available and the data logger and real-time telemetry system is designed to be plug-and-play. The entire system is relatively compact and can be deployed from small vessels. NoiseSpotter’s near real-time capability enables operational monitoring of ME sounds, particularly during early stages of technology adoption to facilitate mitigation of potential noise effects. Widespread adoption of the technology for acoustic monitoring of ME devices requires that it be cost effective; hence the anticipated commercial cost of system hardware is $35,000. This project contributes to reducing barriers to ME testing through support of scientific research focused on reducing or mitigating environmental risks and lowering costs and complexity of environmental monitoring. This project has developed an acoustic monitoring system, NoiseSpotter® (U.S. Patent No. 11,156,734 and U.S. Registered Trademark No. 6,442,313), to detect and characterize baseline noise and sounds from ME operations and support geolocation of detected sounds. The intended outcome of the project is to mitigate concerns about the potential for ME device noise to alter marine mammal or fish behavior. NoiseSpotter® enables cost-effective, near real-time acoustic monitoring of an operational ME device relative to ambient environmental noise and provides a technical basis for ME developers seeking to navigate the permitting process in an efficient manner.

16 TIDAL AND WAVE POWER↗

Autonomous Energy Systems: A Distributed Approach to Control Millions of Energy Devices

Energy systems of all sizes are becoming increasingly complex. The National Renewable Energy Laboratory has developed new controls that will support real-time operations and management of renewables, storage, electric vehicles and loads for grid efficiency and resilience. This fact sheet presents an overview of these autonomous energy systems.

AES↗