Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Orbital servicing of space platforms

NASA-MSFC is planning systems for the orbital servicing and maintenance of large geosynchronous platforms. The goal is to devise methods to maintain, update, and/or replace the basic spacecraft housekeeping equipment as well as the onboard mission equipment. The planning has passed through the feasibility demonstration level. A hard engineering test unit of such an on-orbit servicing system, complete with control system, is being tested and evaluated by MSFC.

Turner, J. R.↗

Pressure distributions obtained on a 0.10-scale model of the Space Shuttle Orbiter's forebody in the Ames Unitary Plan Wind Tunnel

Pressure distribution test data obtained on a 0.10-scale model of the forward fuselage of the Space Shuttle Orbiter are presented without analysis. The tests were completed in the Ames Unitary Wind Tunnel (UPWT). The UPWT tests were conducted in two different test sections operating in the continuous mode, the 8 x 7 feet and 9 x 7 feet test sections. Each test section has its own Mach number range, 1.6 to 2.5 and 2.5 to 3.5 for the 9 x 7 feet and 8 x 7 feet test section, respectively. The test Reynolds number ranged from 1.6 to 2.5 x 10 to the 6th power ft and 0.6 to 2.0 x 10 to the 6th power ft, respectively. The tests were conducted in support of the development of the Shuttle Entry Air Data System (SEADS). In addition to modeling the 20 SEADS orifices, the wind-tunnel model was also instrumented with orifices to match Development Flight Instrumentation (DFI) port locations that existed on the Space Shuttle Columbia (OV-102) during the Orbiter Flight test program. This DFI simulation has provided a means for comparisons between reentry flight pressure data and wind-tunnel and computational data.

Siemers, P. M., III↗

Infrared astronomy and the Shuttle

The infrared spectral range extends approximately from 1 micron to 1000 microns. Observations in infrared astronomy are made with the aid of ground-based telescopes and telescopes flown in aircraft, balloons, or rockets. Advantages and drawbacks of infrared studies conducted by different approaches are discussed. Infrared astronomers are looking forward to observations made from orbiting spacecraft. Present plans call for placing a large telescope aboard the Space Shuttle Orbiter for short missions lasting from seven days to three weeks several times a year. However, the occurrence of a pollution of the spacecraft environment by dust particles and gases coming from the spacecraft might present a problem for the observations. Possible approaches for solving this problem are discussed.

Harwit, M.↗

Space Technology 5: Changing the Mission Design without Changing the Hardware

The Space Technology 5 (ST-5) Project is part of NASA's New Millennium Program. The validation objectives are to demonstrate the research-quality science capability of the ST-5 spacecraft; to operate the three spacecraft as a constellation; and to design, develop, test and flight-validate three capable micro-satellites with new technologies. A three-month flight demonstration phase is planned, beginning in March 2006. This year, the mission was re-planned for a Pegasus XL dedicated launch into an elliptical polar orbit (instead of the Originally-planned Geosynchronous Transfer Orbit.) The re-plan allows the mission to achieve the same high-level technology validation objectives with a different launch vehicle. The new mission design involves a revised science validation strategy, a new orbit and different communication strategy, while minimizing changes to the ST-5 spacecraft itself. The constellation operations concepts have also been refined. While the system engineers, orbit analysts, and operations teams were re-planning the mission, the implementation team continued to make progress on the flight hardware. Most components have been delivered, and the first spacecraft is well into integration and test.

Carlisle, Candace C.↗

Space shuttle engineering and operations support. ALT separation reference trajectories for tailcone on orbiter forward and aft CG configurations. Mission planning, mission analysis and software formulation

A preflight analysis of the ALT separation reference trajectories for the tailcone on, forward, and aft cg orbiter configurations is documented. The ALT separation reference trajectories encompass the time from physical separation of the orbiter from the carrier to orbiter attainment of the maximum ALT interface airspeed. The trajectories include post separation roll maneuvers by both vehicles and are generated using the final preflight data base. The trajectories so generated satisfy all known separation design criteria and violate no known constraints. The requirement for this analysis is given along with the specifications, assumptions, and analytical approach used to generate the separation trajectories. The results of the analytical approach are evaluated, and conclusions and recommendations are summarized.

Glenn, G. M.↗

Review of extravehicular activity for Shuttle program

Extravehicular activity (EVA) is a baselined Shuttle Orbiter capability. It can provide cost-effective servicing operations for payloads, on-orbit repair, and techniques for meeting various on-orbit contingencies. The basic EVA system planned consists of Orbiter-integral provisions, carry-on life support provisions, and EVA support equipment provisions. The Orbiter-integral provisions include the internal airlock, the EVA Egress module, and the docking module, each of which provides an egress path. The carry-on life support provisions will be two Extravehicular Mobility Units (EMU), composed of an Astronaut Life Support Assembly (ALSA) and a Space Suit Assembly (SSA). The support equipment includes tethers, special tools, translation aids, and workstations. The Shuttle Orbiter EVA requirements and possible tasks, EVA crew rescue equipment and techniques, crew support, EVA training, and EVA timeline activities are described.

Covington, J. H.↗

Orbit Transfer Vehicle Engine Study. Phase A, extension 1: Study plan update

The updated study plan for the Space Transportation System orbit transfer vehicle (OTV) engine study is presented. The study program consists of engine system, programmatic, cost, and risk analyses of OTV engine concepts. Detailed task descriptions for the advanced expander cycle engine optimization, alternate low thrust capability, and safety, reliability, and cost comparisons are given.

Mellish, J. A.↗

Propellant-remaining modeling

A successful satellite mission is predicted upon the proper maintenance of the spacecraft's orbit and attitude. One requirement for planning and predicting the orbit and attitude is the accurate estimation of the propellant remaining onboard the spacecraft. Focuss is on the three methods that were developed for calculating the propellant budget: the errors associated with each method and the uncertainties in the variables required to determine the propellant remaining that contribute to these errors. Based on these findings, a strategy is developed for improved propellant-remaining estimation. The first method is based on Boyle's law, which related the values of pressure, volume, and temperature (PVT) of an ideal gas. The PVT method is used for the monopropellant and the bipropellant engines. The second method is based on the engine performance tests, which provide data that relate thrust and specific impulse associated with a propellant tank to that tank's pressure. Two curves representing thrust and specific impulse as functions of pressure are then generated using a polynomial fit on the engine performance data. The third method involves a computer simulation of the propellant system. The propellant flow is modeled by creating a conceptual model of the propulsion system configuration, taking into account such factors as the propellant and pressurant tank characteristics, thruster functionality, and piping layout. Finally, a thrust calibration technique is presented that uses differential correction with the computer simulation method of propellant-remaining modeling. Thrust calibration provides a better assessment of thruster performance and therefore enables a more accurate estimation of propellant consumed during a given maneuver.

Torgovitsky, S.↗

Mission Plan for the Mars Surveyor 2001 Orbiter and Lander

The Mars Surveyor 2001 Project consists of two missions to Mars, an Orbiter and a Lander, both to be launched in the spring of 2001 for October 2001 (Orbiter) and January 2002 (Lander) arrival at Mars. The Orbiter will support the Lander mission primarily as a communications relay system; the Lander will not have direct-to-Earth communications capability. Science data collected from the Orbiter will also be used to aid in the geologic interpretation of the landing site, along with data from past missions. Combining the Orbiter and Lander missions into a single Project has enabled the streamlining of many activities and an efficient use of personnel and other resources at the Jet Propulsion Laboratory and at the spacecraft contractor, Lockheed Martin Astronautics.

Plaut, J. J.↗

A Space Station tethered orbital refueling facility

A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a long tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity driven transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.

Fester, D. A.↗

Tethered orbital propellant depot

A planned function of the Space Station is to refurbish and refuel an advanced space-based LO2/LH2 orbit transfer vehicle. An alternative to propellant storage at the station is to use a remote facility tied to the station with a log tether. Preliminary design of such a facility is described with emphasis on fluid transfer and storage requirements. Using tether lengths of at least 300 ft, gravity gradient forces will dominate surface tension in such a system. Although gravity given transfer is difficult because of line pressure drops, fluid settling over the tank outlet greatly alleviates acquisition concerns and will facilitate vented tank fills. The major concern with a tethered orbital refueling facility is its considerable operational complexity including transport of the OTV to and from the facility.

Fester, D. A.↗

Determination of Eros Physical Parameters for Near Earth Asteroid Rendezvous Orbit Phase Navigation

Navigation of the orbit phase of the Near Earth steroid Rendezvous (NEAR) mission will re,quire determination of certain physical parameters describing the size, shape, gravity field, attitude and inertial properties of Eros. Prior to launch, little was known about Eros except for its orbit which could be determined with high precision from ground based telescope observations. Radar bounce and light curve data provided a rough estimate of Eros shape and a fairly good estimate of the pole, prime meridian and spin rate. However, the determination of the NEAR spacecraft orbit requires a high precision model of Eros's physical parameters and the ground based data provides only marginal a priori information. Eros is the principal source of perturbations of the spacecraft's trajectory and the principal source of data for determining the orbit. The initial orbit determination strategy is therefore concerned with developing a precise model of Eros. The original plan for Eros orbital operations was to execute a series of rendezvous burns beginning on December 20,1998 and insert into a close Eros orbit in January 1999. As a result of an unplanned termination of the rendezvous burn on December 20, 1998, the NEAR spacecraft continued on its high velocity approach trajectory and passed within 3900 km of Eros on December 23, 1998. The planned rendezvous burn was delayed until January 3, 1999 which resulted in the spacecraft being placed on a trajectory that slowly returns to Eros with a subsequent delay of close Eros orbital operations until February 2001. The flyby of Eros provided a brief glimpse and allowed for a crude estimate of the pole, prime meridian and mass of Eros. More importantly for navigation, orbit determination software was executed in the landmark tracking mode to determine the spacecraft orbit and a preliminary shape and landmark data base has been obtained. The flyby also provided an opportunity to test orbit determination operational procedures that will be used in February of 2001. The initial attitude and spin rate of Eros, as well as estimates of reference landmark locations, are obtained from images of the asteroid. These initial estimates are used as a priori values for a more precise refinement of these parameters by the orbit determination software which combines optical measurements with Doppler tracking data to obtain solutions for the required parameters. As the spacecraft is maneuvered; closer to the asteroid, estimates of spacecraft state, asteroid attitude, solar pressure, landmark locations and Eros physical parameters including mass, moments of inertia and gravity harmonics are determined with increasing precision. The determination of the elements of the inertia tensor of the asteroid is critical to spacecraft orbit determination and prediction of the asteroid attitude. The moments of inertia about the principal axes are also of scientific interest since they provide some insight into the internal mass distribution. Determination of the principal axes moments of inertia will depend on observing free precession in the asteroid's attitude dynamics. Gravity harmonics are in themselves of interest to science. When compared with the asteroid shape, some insight may be obtained into Eros' internal structure. The location of the center of mass derived from the first degree harmonic coefficients give a direct indication of overall mass distribution. The second degree harmonic coefficients relate to the radial distribution of mass. Higher degree harmonics may be compared with surface features to gain additional insight into mass distribution. In this paper, estimates of Eros physical parameters obtained from the December 23,1998 flyby will be presented. This new knowledge will be applied to simplification of Eros orbital operations in February of 2001. The resulting revision to the orbit determination strategy will also be discussed.

Miller, J. K.↗