Search NASA⌕ Search

SEARCH · Search NASA

Results for “payback”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Cataloging and Quantifying Value Streams from Non-Powered Dam Conversion

Hydropower is a key resource in the United States’ renewable energy transition; however, only 3% of existing dams in the United States currently generate electricity. While many non-powered dams (NPDs) have the potential for energy generation, hydropower addition to these dams has been slow. This is likely due, in part, to perceptions that hydropower development has prohibitively long payback periods, especially in comparison to other renewable energy resources that have shorter development processes. On the other hand, powering some NPDs may unlock new value streams in addition to the value obtained from selling generated energy. There is a need to understand and quantify a wider range of additional value streams to help increase the feasibility of such hydropower projects. In this work, we catalog indirect value streams and difficult-to-quantify direct value streams from NPD retrofitting, specifying which stakeholders are affected, and what kind of impacts (positive or negative) might occur. We identify appropriate quantification methodologies for these indirect value streams and describe the best practices around their implementation for NPD site-level analysis. We also demonstrate the quantification of a few indirect value streams for a selected NPD site, allowing for easier integration of these value streams into future studies by providing basis and background for quantifying these elements.

13 HYDRO ENERGY↗

Hanover LED Streetlight Conversion

On May 8, 2017, Hanover residents voted overwhelmingly to transition to 100% renewable electricity by 2030 and heating, cooling and transportation by 2050. In so doing, we became the first municipality in the country to make this commitment by popular vote. To accomplish these goal town leaders developed a plan to address first transitioning municipal energy uses to renewable forms of energy, through on-site generation of the municipal electrical load, load reduction through energy efficiency improvements to town facilities and infrastructure. Significant progress has been accomplished in the generation of energy with 90%+ of the 2024 municipal load being offset by generation and through various energy efficiency projects. The utility owned street lighting was identified as a large energy consumer of 165 MWh annually (7% of the annual municipal load) due to old inefficient high-pressure sodium and mercury vapor streetlights with no ability to reduce wattage during periods with low lighting needs. The Hanover LED Streetlight Replacement Project replaced utility owned streetlights with town owned controllable (dimmable and trimmable) LED lights that can be adjusted by location and time of night. Coupled with ownership of the streetlights transfer to the town, the town’s share of the project pay back is 11 months and for the complete project including federal share the payback is approximately 3 years. With the completion of lighting upgrade, the annual streetlighting energy load has dropped by 60% to 67 MWh in the first year of operation (7/1/24 - 6/30/25). This amounts to an approximate $90,000 annual savings or a local 1% tax rate impact. Additionally, over 200,000 pounds of CO2 will be saved annually.

99 GENERAL AND MISCELLANEOUS↗

Improving Performance via Energy Efficiency JUSTIFI: Open-Source Software for Identifying and Quantifying Non-Energy Benefits

Energy efficiency is pivotal to achieving operational excellence, as it enhances value while reducing waste. This presentation explores the integration of non-energy benefits (NEBs) into energy efficiency projects, which can lead to risk reduction, value creation, and cost savings. By quantifying NEBs - such as improved safety, decreased pollution, and increased productivity - companies can strengthen their business cases for energy investments, ultimately improving payback periods and aligning with strategic goals. Designed for a diverse audience, from trained auditors to novices in energy assessments, we have developed open-source software called JUSTIFI, NEB finding methodology, and training materials which build on existing frameworks and leverages resources from the U.S. Department of Energy and Better Plants energy system analysis software suite such as MEASUR. This work aims to maximize ROI through NEB identification, utilizing tools like JUSTIFI and the NEBs Discovery Protocol.

97 MATHEMATICS AND COMPUTING↗

Evaluating Energy Savings Measures for Building Retrofits in an Interactive Workshop Environment

As part of the Better Buildings Summit 2025, a workshop was developed to simulate the decision process for implementing a set of energy savings measures on an existing building. As part of the workshop a "game" was created around energy savings strategies, and workshop participants selected renovation cards that provided data around the impacts of that renovation choice. Participants then were able to calculate overall savings and payback from the selected retrofit opportunities. This publication has been produced to package the resources used in the activity in an organized document so that the materials can be distributed and reused more broadly. It provides a comprehensive framework for replicating the workshop, including step-by-step instructions, retrofit "game cards" with data points, and facilitation guidance. By using these materials, readers can conduct their own version of this interactive workshop with stakeholders in their networks, such as building owners, energy managers, or policy makers. The goal is to empower users to simulate the decision-making processes for energy projects, foster collaboration, and drive meaningful discussions around cost-effective retrofit opportunities and goal-oriented outcomes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Powering Circularity Through Data Reporting and Collection

Sustainability and Circular Economy have many metrics for evaluation. Calculating mass intensity, energy return on investment, financial payback, and recycling rate for proposed technology changes and lifecycle management can support decision making. Robust data with modeling tools can perform these calculations, informing good decision making. Analyses show that reliability is more critical than recyclability. Improved data gathering and tool accessibility will support our industry to make more circular choices for PV lifecycle management.

14 SOLAR ENERGY↗

Towaoc Housing Solar Initiative

The Towaoc Housing Solar initiative was implemented to install net-metered solar generation systems on twenty-three Tribal buildings in Towoac, CO on the Ute Mountain Ute Reservation. The project was funded 80% by Department of Energy and 20% by the Ute Mountain Ute Tribe. The project and grant are authorized by Ute Mountain Ute Tribal Council Resolution 2020-116. The systems were designed to cumulatively generate 160 direct current (DC) kilowatts on average, translating to 222,585 kilowatt hours per year. The average cost for the generation was calculated at $\$$3.34/watt with a return on investment period anticipated at 22 years for a simple payback of all costs, 11 years for the Tribe’s investment at 50% cost-share. The systems should last for 30 years. The primary goals of the project for the Tribe were identified as the reduction of electricity costs for the twenty three Tribal buildings of the Housing Authority (comprising 22 rental homes and a small apartment building with 11 units) and the reduction of carbon pollution through the transition of energy sources used in the buildings.

14 SOLAR ENERGY↗

Solar Photovoltaics Resilient Fasteners Levelized Cost of Energy (LCOE) Tool

Solar photovoltaics (PV) module fasteners are one of the most common structural failure points on PV systems, particularly in high winds and coastal areas with ocean spray. Some fastener types have been shown to survive these conditions at higher rates than others. The fastener type, material, quantity, and placement all impact performance. Fasteners that fail less often typically have a higher upfront cost, but this investment can pay off in savings from less frequent torque audits (which reduces O&M costs), reduced system damage, and decreased system downtime. We developed an Excel-based tool to evaluate different module fasteners for a PV system - either a new or retrofit project - and compare differences in upfront and outyear costs to determine the expected life cycle costs and simple payback periods of different fastener options. The tool is site-specific, with inputs including system attributes (such as system size, location, price of power) and fastener attributes (such as design, washer type, nut type, use of locking hardware, materials, installation time, and torque audit requirements). A baseline fastener scenario can be compared to up to four proposed fastener scenarios. In addition to presenting expected life cycle cost implications of the different fastener options, the tool produces results showing the reductions in outyear costs needed to offset any initial cost premiums for more reliable fasteners across four categories: preventative O&M, avoided damage, reduced downtime, and reduced insurance premiums. These numbers can serve as decision aids for users when considering fastener options on new or existing projects. This poster will present the tool, methodology, and scenarios using example sites to highlight the tool capabilities and how it can inform different fastener decisions on different projects. Future work includes incorporating lifetime expected damage costs by embedding damage function curves that the authors are developing from field data.

14 SOLAR ENERGY↗

Akiachak Energy Efficiency Retrofit Project

The goal of the project is to reduce the overall energy use of the Akiachak Native Community (ANC) by implementing energy efficiency measures in five high-use Tribal buildings. This project will have the following outcomes: Projected annual energy savings of $17,369; projected annual reduction in fuel oil #1 of 1,200 gallons and electricity of 17,751 kWh; annual reduction in carbon dioxide emissions of approximately 60,340 pounds/year. ANC will install energy efficiency measures in the Laundry, Tribal Indian Reorganization Act (IRA) Office, Clinic, Daycare, and Police Station. ANC obtained energy audits on these buildings in 2018, and this project will implement high-payback recommendations such as replacing lighting with LEDs, installing setback thermostats and occupancy sensors, replacing furnaces with more efficient models, replacing the circulation pumps with variable speed ones, air tightening, and adding insulation. Buildings will see energy cost reductions from 15% to 40%. These retrofits will help build ANC’s long-term vision for sustainable energy usage and address the first goal of the Tribal IRA Council’s Energy Efficiency and Conservation Strategy, to “create and maintain functionally appropriate, sustainable, accessible, high quality tribal infrastructure and facilities.” ANC intends to replicate this project by using the resulting energy savings to address audit recommendations in other buildings as well as to demonstrate the value of energy efficiency to community members. Other outcomes will include an increase in community resiliency, reduced dependence on outside shipments of fuel oil, training for maintenance staff, and no-touch control of building appliances to reduce transmission of diseases such as COVID-19.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Capture of Heat Energy from Diesel Engine Exhaust

Diesel generators produce waste heat as well as electrical power. About one-third of the fuel energy is released from the exhaust manifolds of the diesel engines and normally is not captured for useful applications. This project studied different waste heat applications that may effectively use the heat released from exhaust of Alaskan village diesel generators, selected the most desirable application, designed and fabricated a prototype for performance measurements, and evaluated the feasibility and economic impact of the selected application. Exhaust flow rate, composition, and temperature may affect the heat recovery system design and the amount of heat that is recoverable. In comparison with the other two parameters, the effect of exhaust composition may be less important due to the large air/fuel ratio for diesel engines. This project also compared heat content and qualities (i.e., temperatures) of exhaust for three types of fuel: conventional diesel, a synthetic diesel, and conventional diesel with a small amount of hydrogen. Another task of this project was the development of a computer-aided design tool for the economic analysis of selected exhaust heat recovery applications to any Alaskan village diesel generator set. The exhaust heat recovery application selected from this study was for heating. An exhaust heat recovery system was fabricated, and 350 hours of testing was conducted. Based on testing data, the exhaust heat recovery heating system showed insignificant effects on engine performance and maintenance requirements. From measurements, it was determined that the amount of heat recovered from the system was about 50% of the heat energy contained in the exhaust (heat contained in exhaust was evaluated based on environment temperature). The estimated payback time for 100% use of recovered heat would be less than 3 years at a fuel price of $3.50 per gallon, an interest rate of 10%, and an engine operation of 8 hours per day. Based on experimental data, the synthetic fuel contained slightly less heat energy and fewer emissions. Test results obtained from adding different levels of a small amount of hydrogen into the intake manifold of a diesel-operated engine showed no effect on exhaust heat content. In other words, both synthetic fuel and conventional diesel with a small amount of hydrogen may not have a significant enough effect on the amount of recoverable heat and its feasibility. An economic analysis computer program was developed on Visual Basic for Application in Microsoft Excel. The program was developed to be user friendly, to accept different levels of input data, and to expand for other heat recovery applications (i.e., power, desalination, etc.) by adding into the program the simulation subroutines of the desired applications. The developed program has been validated using experimental data.

08 HYDROGEN↗

Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, Minneapolis, MN

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology conducted in 2009 at the recently reconstructed I-35W bridge in Minneapolis, MN. The project was supported under the U.S. Department of Energy (DOE) Solid-State Lighting GATEWAY Technology Demonstration Program. Other participants in the demonstration project included the Minnesota Department of Transportation (Mn/DOT), Federal Highways Administration (FHWA), and BetaLED™ (a division of Ruud Lighting). Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. DOE has implemented a three-year evaluation of the LED luminaires in this installation in order to develop new longitudinal field data on LED performance in a challenging, real-world environment. This document provides information through the initial phase of the I-35W bridge project, up to and including the opening of the bridge to the public and the initial feedback received on the LED lighting installation from bridge users. Initial findings of the evaluation are favorable, with minimum energy savings level of 13% for the LED installation relative to the simulated base case using 250W high-pressure sodium (HPS) fixtures. The LEDs had an average illuminance level of 0.91 foot candles compared to 1.29 fc for the HPS lamps. The LED luminaires cost $38,000 more than HPS lamps, yielding a lengthy payback period, however the bridge contractor had offered to include the LED luminaires as part of the construction package at no additional cost. One potentially significant benefit of the LEDs in this installation is avoiding rolling lane closures on the heavily-traveled interstate bridge for the purpose of relamping the HPS fixtures. Rolling lane closures involve multiple crew members and various maintenance and safety vehicles, diversion of traffic, as well as related administrative tasks (e.g., approvals, scheduling, etc.). Mn/DOT records show an average cost of relamping fixtures along interstate roadways of between $130-150 per pole. The previous bridge saw a lamp mortality rate of approximately 50% every two years, though the new bridge was designed to minimize many of the vibration issues. A voluntary Web-based feedback survey of nearly 500 self-described bridge users showed strong preference for the LED lighting - positive comments outnumbered negative ones by about five-to-one.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Achieving Energy Savings with Highly-Controlled Lighting in an Open-Plan Office

An installation in a Federal building tested the effectiveness of a highly-controlled, workstation-specific lighting retrofit. The study took place in an open-office area with 86 cubicles and low levels of daylight. Each cubicle was illuminated by a direct/indirectpendant luminaire with three 32 watt lamps, two dimmable DALI ballasts, and an occupancy sensor. A centralized control system programmed all three lamps to turn on and off according to occupancy on a workstation-by-workstation basis. Field measurements taken over the course of several monthsdemonstrated 40% lighting energy savings compared to a baseline without advanced controls that conforms to GSA's current retrofit standard. A photometric analysis found that the installation provided higher desktop light levels than the baseline, while an occupant survey found that occupants in general preferred the lighting system to thebaseline.Simple payback is fairly high; projects that can achieve lower installation costs and/or higher energy savings and those in which greenhouse gas reduction and occupant satisfaction are significant priorities provide the ideal setting for workstation-specific lighting retrofits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Very High Fuel Economy, Heavy Duty, Constant Speed, Truck Engine Optimized Via Unique Energy Recovery Turbines and Facilitated High Efficiency Continuously Variable Drivetrain

The project began under a corporative agreement between Mack Trucks, Inc and the Department of Energy starting from September 1, 2005. The major objective of the four year project is to demonstrate a 10% efficiency gain by operating a Volvo 13 Litre heavy-duty diesel engine at a constant or narrow speed and coupled to a continuously variable transmission. The simulation work on the Constant Speed Engine started on October 1st. The initial simulations are aimed to give a basic engine model for the VTEC vehicle simulations. Compressor and turbine maps are based upon existing maps and/or qualified, realistic estimations. The reference engine is a MD 13 US07 475 Hp. Phase I was completed in May 2006 which determined that an increase in fuel efficiency for the engine of 10.5% over the OICA cycle, and 8.2% over a road cycle was possible. The net increase in fuel efficiency would be 5% when coupled to a CVT and operated over simulated highway conditions. In Phase II an economic analysis was performed on the engine with turbocompound (TC) and a Continuously Variable Transmission (CVT). The system was analyzed to determine the payback time needed for the added cost of the TC and CVT system. The analysis was performed by considering two different production scenarios of 10,000 and 60,000 units annually. The cost estimate includes the turbocharger, the turbocompound unit, the interstage duct diffuser and installation details, the modifications necessary on the engine and the CVT. Even with the cheapest fuel and the lowest improvement, the pay back time is only slightly more than 12 months. A gear train is necessary between the engine crankshaft and turbocompound unit. This is considered to be relatively straight forward with no design problems.

33 ADVANCED PROPULSION SYSTEMS↗

Microgrid Disaster Resiliency Analysis: Reducing Costs in Continuity of Operations (COOP) Planning

The electric grid serves a vital role in the supply chain of nearly all industrial and commercial organizations. A Microgrid infrastructure can provide this service and beneficial non-emergency services including a variety of generation/energy sources. To demonstrate the applicability of microgrids for energy resiliency, we present a microgrid resiliency case study for United Parcel Service’s (UPS) three separate shipping facilities. The goal, to enhance energy security, minimize cost and prevent cascading losses within other related business units. The impacts and consequences of which are quantified in this study using a Mean Failure Cost (MFC) risk assessment measure. MFC accounts for the potential loses to identified stakeholders that may result from a set of identified failures due to a set of identified threats. In this case, our study uses a method we call All Hazards Econometric System (AHES). AHES incorporates the cost of COOP using a strategy that considers the payback period of microgrid installation as compared to other energy delivery strategies.

Abercrombie, Robert K.↗

Dataset For: A Guide to Residential Energy Storage and Rooftop Solar: State Net Metering Policies and Utility Rate Tariff Structures

Federal and state decarbonization goals have led to numerous financial incentives and policies designed to increase access and adoption of renewable energy systems. In combination with the declining cost of both solar photovoltaic and battery energy storage systems and rising electric utility rates, residential renewable adoption has become more favorable than ever. However, not all states provide the same opportunity for cost recovery, and the complicated and changing policy and utility landscape can make it difficult for households to make an informed decision on whether to install a renewable system. This paper is intended to provide a guide to households considering renewable adoption by introducing relevant factors that influence renewable system performance and payback, summarized in a state lookup table for quick reference. Five states are chosen as case studies to perform economic optimizations based on net metering policy, utility rate structure, and average electric utility price; these states are selected to be representative of the possible combinations of factors to aid in the decision-making process for customers in all states. The results of this analysis highlight the dual importance of both state support for renewables and price signals, as the benefits of residential renewable systems are best realized in states with net metering policies facing the challenge of above-average electric utility rates. This dataset is intended to allow readers to reproduce and customize the analysis performed in this work to their benefit. Suggested modifications include: location, household load profile, rate tariff structure, and renewable energy system design.

14 SOLAR ENERGY↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

Raleigh Housing Authority Duct Sealing Evaluation

In multifamily and attached buildings, manual duct sealing methods are often impractical or very costly and disruptive because of the difficulty in accessing leakage sites. In this project, two retrofit duct sealing techniques manually applied sealants and injecting a spray sealant (Aeroseal) in combination with some manual sealing were implemented in several low-rise multi-unit buildings in North Carolina. An analysis of the cost and performance of the two methods is presented. Each method was used in 20 housing units: approximately half of each group of units are single story and the remainder are two story. Results show that duct leakage to the outside was reduced by an average of 59% through the use of manual methods, and by 90% in the units where a combination of injected spray sealant and manual sealing was used. Some of this difference is likely due to the fact that injected spray sealing reached portions of the duct system that were inaccessible to manual methods. It was found that 73% of the leakage reduction in homes that were treated with injected spray sealant was attributable to the manual sealing done at boots, returns, and the air handler. The cost of manually applying sealant ranged from $275 to $511 per unit and for the Aeroseal treated ducts the cost was $700 per unit. Utility bills were collected and compared for 1 year before and after the retrofits for each unit. Energy savings based on utility bills were within 25%-50% of those predicted by the models for most unit types. Utility bill analysis shows 14% and 16% energy savings using the Aeroseal and hand sealing procedures, respectively, in heating season whereas in cooling season, energy savings using Aeroseal and hand sealing were both 16%. Average simple payback based on utility bills was 2.2 years for manual units and 4.7 years for the Aeroseal units. Only 18 of 40 units had usable utility bills. Berkshire Village Court - House Count - 4: Single Story, Hand sealed ducts; Single Story, Aeroseal Ducting; 2-Story, Hand Sealed ducts; 2-Story, Aeroseal ducts Terrace Park Court - House Count - 2: Single Story, Hand sealed ducts; Double Story, Hand sealed ducting Winter Park Court - House Count - 2: Single Story, Hand sealed ducts, Aeroseal sealed ducting; Double Story, Aeroseal ducting

Aeroseal↗

Public Housing: A Tailored Approach to Energy Retrofits - Raleigh

More than 1 million U.S. Department of Housing and Urban Development-supported public housing units provide rental housing for eligible low-income families across the country. These units range from scattered single-family houses to high-rise apartments. In this project, the Advanced Residential Integrated Energy Solutions Collaborative (ARIES) worked with two public housing authorities (PHAs) to develop packages of energy efficiency retrofit measures the PHAs can cost-effectively implement with their own staffs in the normal course of housing operations at the time when units are refurbished between occupancies. ARIES conducted a survey of PHAs to assess their receptiveness to this concept and the applicability of the concept to PHA units. The results of the survey, to which more than 100 PHAs responded, support the proposed approach. The project consisted of a field evaluation in which energy audits were performed on a sample of PHA units at two housing authorities. Energy efficiency turnover protocols were developed for typical units, the protocol was implemented by PHA staff, and the effectiveness of the protocol was quantified through field testing and modeling. The energy efficiency turnover protocols emphasized air infiltration reduction, duct sealing, and measures that improve equipment efficiency. In the 10 housing units in which ARIES documented implementation, reductions in average air leakage of 16%-20% and duct leakage of 38% were obtained. Total source energy consumption savings was estimated at 6%-10% based on Building Energy Optimization modeling with a simple payback of 1.7-2.2 years. Implementation challenges were encountered, mainly related to required operational changes and budgetary constraints. Lack of complete training and inadequate quality control can prevent PHAs from effectively retrofitting units to their full potential. Nevertheless, despite these hurdles, simple improvements, such as caulking and sealing penetrations, windows, and doors; sealing duct boots; and adding pipe insulation into a standardized turnover protocol can feasibly be accomplished by PHA staff at low or no cost. At typical housing unit turnover rates, these measures could impact hundreds of thousands of units per year nationally. Islip Housing Authority - Single Story Typical home - Raleigh, NC Raleigh Housing Authority - 2 story typical home in Raleigh housing authority - Terrace Park

air filtration↗