Search NASA⌕ Search

SEARCH · Search NASA

Results for “power distribution planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Uncertainty Quantification for Capacity Expansion Planning

This report quantifies the uncertainty in output decisions from a Capacity Expansion Planning (CEP) model. The need to understand how uncertainties within CEP models and modeling assumptions affect Quantities of Interest (QoIs) such as expansion and operating costs, as well as expansion decisions remains an ongoing challenge in scientific research and industrial operations. This area of research is particularly important for models which seek to capture how large networks will evolve and operate under increased sources of variable generation, i.e., higher penetration of renewable technologies such as solar and wind generators. Uncertainty quantification (UQ) of CEP models which estimate expansion costs and decisions, and production cost models which estimate operating costs and dispatch decisions, is a key focus of research at NREL. The Regional Energy Deployment System (ReEDS) represents a state-of-the-art CEP model and considers a range of possible grid evolutions in an attempt to identify key drivers, ramifications, and decisions which contribute to better informed investment and policy decisions. However, research to quantify how uncertainties and model assumptions, such as unit commitment (UC), within ReEDS may be affecting its outputs remains challenging due to to size and complexity of the model

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating nuclear-integrated data center pursuits in the USA: SWOT analysis, power-thermal management strategies and demonstration plan

Here, this study explores the increasing interest in leveraging nuclear power to meet the escalating energy demands of data centers in the United States (U.S.) by focusing on key factors that contribute to accelerated deployment. The study highlights the importance of N+1/N+2 power supplies (where N is the required number of units), outlines research and innovations in nuclear-integrated data center thermal management and demonstration plan. It also provides updates about status and costing of various reactor system designs. A summarized strengths, weaknesses, opportunities, and threats (SWOT) analysis shows the potential options for grid connectivity, reactors, and site selection. Suitable site discussions consider land and water availability, grid access, and optical fiber connectivity, and the study presents graded prospects for Department of Energy (DOE) sites with a specific example. Community engagement and partnerships are emphasized, particularly the roles of local government, federal agencies, utilities, and data center industry partners, which are crucial for accelerating deployment, business outreach, and approvals. The study provides actionable insights for stakeholders to accelerate the deployment of nuclear-powered data centers.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Electric Grid Supply Chain Review: Large Power Transformers and High Voltage Direct Current Systems

The report “America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition” lays out the challenges and opportunities faced by the United States in the energy supply chain as well as the federal government plans to address these challenges and opportunities. It is accompanied by several issue-specific deep dive assessments, including this one, in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. The need to modernize and increase the capacity of the U.S. power grid is increasing due to growing population, aging infrastructure, grid resilience requirements, operational flexibility needs, and a growing portfolio of renewable energy. As part of the Paris Climate Agreement the United States has committed to reducing its net greenhouse gas emissions by 50 to 52 percent below 2005 levels in 2030 and has set a goal of 100 percent carbon pollution free electricity by 2035 (The United States of America Nationally Determined Contribution, 2021). Meeting these targets will require a significant expansion of the power system to integrate a large amount of new renewable resources (United States Department of State & United States Executive Office of the President, 2021). However, many critical components supporting the power grid have limited to no domestic manufacturing capacity and face complex challenges in supporting a rapid expansion of the grid to meet multiple objectives, including decarbonization goals. This report focuses on two key grid components: large power transformers (LPTs) and high-voltage direct current (HVDC) transmission.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technoeconomic Opportunity Analysis for Local Power Generation in Falls City, Nebraska

Falls City is a small community in Nebraska interested in understanding how energy from local energy systems could support the community's economic development planning. To address the current community needs and address the future energy demand technical assistance conducted through the Communities Local Energy Action Program (Communities LEAP) assessed the technical and economic opportunities of adding energy technologies to Falls City's municipally owned and operated electric utility system. The modeling performed considered the technical and economic feasibility of technologies using the System Advisor Model (SAM). The modeling explored three technology configurations using multiple years of historical weather and wholesale cost data (2015-2022 & a typical meteorological year), and two different wholesale escalation rates (0.3% and 2.5%). Wholesale energy prices were based on the Southwest Power Pool's (SPP) real-time energy market and the annual escalation rates of these rates based on historical SPP wholesale and national retail electricity price trends. Results from the modeling showed that at current CAPEX costs and SPP wholesale electricity costs no technology combination averaged across the scenarios run provide a positive net present value (NPV). External financial support, changes in market conditions, and additional revenue streams would help create more economically favorable projects. As conditions change re-evaluation may be necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lahaina Energy Partnership: Technical Assistance Task Updates and Discussion Part 1 [Slides]

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the first in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 (this presentation) will focus on Hydropower resource potential, building energy modeling, workforce development. Workshop 2 on December 11 (presentation forthcoming) will focus on microgrids, electric grid hardening, policy and regulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lahaina Energy Partnership: Technical Assistance Task Updates and Discussion Part 2

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the second in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 focused on hydropower resource potential, building energy modeling, and workforce development. Workshop 2 on December 11 (this presentation) will focus on microgrids, electric grid hardening, policy and regulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proactive Regulatory Approaches to Electrification and Load Growth: Workshop Report

On July 10 and 11, 2024, Pacific Northwest National Laboratory and RMI led a workshop in Aurora, Colorado, to explore novel and proactive approaches to electrification and load growth while minimizing risks and costs to customers. Over the next decade, a unique opportunity exists to invest strategically in the electricity system to enable electrification across the transportation, industrial, and building sectors and respond to data and technology-based load growth. However, current utility and regulatory planning practices are insufficient to identify and enable the right investments, and work must be done to reduce the risk and decisional uncertainty faced by utility regulatory commissions and utilities. Ensuring timely electrification investments may require new approaches to address risk, uncertainty, prudence, and cost recovery. Understanding the decision-making process and information needs of utilities and regulators is critical. New policies (or application of policies), financial tools, systems analysis, regulatory mechanisms, and enhanced process transparency may be required. The workshop's goal was to identify proactive regulatory approaches for electrification and load growth that minimize costs and risks to customers. Our intention was that the conversations and the resulting solutions and takeaways would be specific and tactical rather than general and theoretical and that together we would create actionable next steps for key actors in the system, including utilities, regulators, thought leaders, researchers, and the U.S. Department of Energy (DOE). This report is intended to provide workshop attendees with a record and summary of the discussion and proposals raised at the workshop and to provide interested entities who did not attend, such as other regulators, policymakers, utilities, and U.S. DOE offices, with an understanding of what was discussed and with ideas to explore in their organizations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

McGrath Community Energy Planning

The City of McGrath, a remote Alaskan community reliant on diesel fuel, developed a Community Energy Plan through the Energy Technologies Innovation Partnership Project (ETIPP) to address high energy costs, infrastructure vulnerabilities, and long-term sustainability. Guided by community-led priorities and technical assistance from partners including NREL, REAP, and ANTHC, the plan identifies eight focus areas: distribution system upgrades, solar and battery integration, river energy potential, emergency backup power, housing efficiency, water system losses, independent power producer models, and targeted funding strategies. The plan combines local knowledge with technical analysis to chart a path toward a more resilient, affordable, and sustainable energy future for McGrath.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Redefining Resource Adequacy for Modern Power Systems: A Report of the Redefining Resource Adequacy Task Force

Today's rapidly increasing levels of wind, solar, storage, and load flexibility require the industry to rethink reliability planning and resource adequacy methods for modern power systems. Periods with a risk of shortfall often no longer coincide with peak demand - reliability risks are less about peak load and more about the daily setting of the sun, extended cloud cover, wind speeds, cold snaps, and heat waves. In addition, demand is increasingly flexible. Key resources are time-sensitive, as batteries need time to recharge and electricity customers can only be asked to provide demand response for just so long. And reliability failures are often correlated - with one another and with the weather. Two driving factors require the industry to reconsider its analytical approach for resource adequacy: (1) Chronological grid operations: The increasing importance of variable renewable resources (such as wind and solar) and of energy-limited resources (storage and demand response) make it essential to understand the full year of chronological operation of the grid. Specific attention must be paid to hourly, seasonal, and inter-annual resource variability. The sequence of the variability is key, as energy-limited resources such as batteries or demand response require either a preceding period or subsequent period of high production to be useful for grid reliability. (2) Correlated events: Historically, resource adequacy analysis focused on shortfalls caused by random, discrete mechanical failures of large generating units. In contrast, shortfalls today are often caused by multiple, correlated events caused by common weather patterns. Resource adequacy analysis must increasingly shift its focus to these correlated events. The redesign of resource adequacy methods will benefit from a set of guiding principles to better allow for sharing of insights and best practices, interregional resource coordination, and a smoother regulatory process for resource procurement. The objective of this report is to move this redesign forward. It provides an overview of key drivers changing the way resource adequacy needs to be evaluated, identifies shortcomings of conventional approaches, and outlines first principles for practitioners to consider as they adapt their approaches. The central message is: what got us here won't get us there.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power-to-Gas System Valuation. Final Report

To provide a framework for evaluating the technical and financial benefits of a power-to-gas (P2G) system deployed in the Holyoke Gas and Electric (HG&E) system, Pacific Northwest National Laboratory modified its energy storage valuation tools to run a one-year simulation of P2G operations. The simulation was used to evaluate the benefits of P2G for multiple grid and industrial applications over the economic life of the unit, or units, depending on the asset configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Derivation and assessment of regional electricity generation emission factors in the USA

Electricity production is one of the largest sources of environmental emissions - especially greenhouse gases (GHGs) - in the USA. Emission factors (EFs) vary from region to region, which requires the use of spatially relevant EF data for electricity production while performing life cycle assessments (LCAs). Uncertainty information, which is sought by LCA practitioners, is rarely supplied with available life cycle inventories (LCIs). To address these challenges, we present a method for collecting data from different sources for electricity generation and environmental emissions; discuss the challenges involved in agglomerating such data; provide relevant suggestions and solutions to merge the information; and calculate EFs for electricity generation processes from various fuel sources for different spatial regions and spatial resolutions. The EFs from the US 2016 Electricity Life Cycle Inventory (eLCI) are analyzed and explored in this study. We also explore the method of uncertainty information derivation for the EFs. We explore the EFs from different technologies across Emissions & Generation Resource Integrated Database (eGRID) regions in the USA. We find that for certain eGRID regions, the same electricity production technology may have worse emissions. This may be a result of the age of the plants in the region, the quality of fuel used, or other underlying factors. Region-wise life cycle impact assessment (LCIA) ISO 14040 impacts for total generation mix activities provide an overview of the total sustainability profile of electricity production in a particular region, rather than only global warming potential (GWP). We also find that, for different LCIA impacts, several eGRID regions are consistently worse than the US average LCIA impact for every unit of electricity generated. Here this work describes the development of an electricity production LCI at different spatial resolutions by combining and harmonizing information from several databases. The inventory consists of emissions, fuel inputs, and electricity and steam outputs from different electricity production technologies located across various regions of the USA. This LCI for electricity production in the USA will prove to be an enormous resource for all LCA researchers - considering the detailed sources of the information and the breadth of emissions covered by it.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decarbonization scenarios of the U.S. Electricity system and their costs

Decarbonizing the electricity system to zero-carbon emission is crucial for climate change mitigation. Previous studies have shown that such a transition in the United States (U.S.) may lead to higher system cost compared to a business-as-usual case, but it is not well-known how the cost of electricity generation varies at sub-regional level under the transition, and studies have rarely evaluated the trade-off between the cost and avoided climate damages, as well as the potential roles of negative emission technologies (NETs) in the electricity decarbonization. In this work, we present a regionally resolved national model to quantify the cost of decarbonizing the U.S. electricity system under a set of possible scenarios. The results show that, compared to the reference scenario without a decarbonization policy, reaching zero CO 2 emission by 2050 would incur, depending on the scenarios, 335-494 billion USD additional cost to the U.S. electric power sector during 2020-2050. The regional costs of electricity generation ranges from 2.4 to 4.7 cent/kWh, largely due to the generation profiles and renewable resources availability of those regions. The additional costs can be translated to an average CO 2 abatement cost of 29-59 USD/metric ton CO 2 (with 2%-7% discount rates), which are comparable to the social cost of carbon in the literature at around 4% discount rate. The results also show that the cost of mitigating the last few percent CO 2 emission from the U.S. electricity system may exceed the costs of NETs, indicating an opportunity for NETs to contribute to electricity decarbonization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying agricultural productive use of energy load in Sub-Saharan Africa and its impact on microgrid configurations and costs

The use of advanced energy technologies for agricultural purposes—such as irrigation, refrigeration, crop processing, and egg incubation—has the potential to increase crop yield, reduce vulnerability to changing precipitation patterns, increase shelf life, strengthen income and employment opportunities in rural areas, and reduce emissions by displacing fossil fuel-based technologies. These productive uses of energy (PUE) in remote areas could potentially be powered by microgrids that additionally serve otherwise unelectrified communities, most of which are located in rural Sub-Saharan Africa. Here, in this paper, we use high-resolution geospatial data to estimate the end-use electricity demand for a range of agricultural PUE across Sub-Saharan Africa, and we share these data in an open-access mapping tool. Next, we use REopt®, a techno-economic optimization model of energy systems, to determine the cost and system sizing implications of incorporating agricultural PUE into microgrid designs in Kenya and Zambia. We estimate the upper bound of agricultural PUE demand for irrigation, milling, shelling, refrigeration, and egg incubation across Sub-Saharan to be 16.8 TWh/yr. We find that incorporating local agricultural PUE into microgrid system designs increases the required system sizing while having minimal impact on the levelized cost of energy of these systems. Our analysis is the first to demonstrate the PUE potential in the agricultural sector at a 10x10-kilometer resolution across Sub-Saharan Africa and to show, at scale, how site-specific PUE can impact the cost and sizing of microgrids that are otherwise deployed to serve local household and community load.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing design and dispatch of a resilient renewable energy microgrid for a South African hospital

Lack of access to reliable energy is a major concern for countries in sub-Saharan Africa. The national grids are unable to consistently satisfy demand. Therefore, users turn to distributed generation systems in the form of back-up generators. However, such systems are usually designed based on a rule of thumb. We employ a mixed-integer linear programming model that considers several options such as renewable energy, combined heat and power, and storage technologies, in addition to those on-site, to provide optimal design and dispatch decisions that minimize total cost. We apply this model to a case study for a hospital in South Africa, considering its need for reliable electricity in light of multiple outages that might occur over the course of a year, as well as its high heating and cooling loads. Our results show that optimal design and dispatch decisions for the distributed generation system address reliability challenges, regardless of the time at which they occur. And, these solutions yield millions of dollars in savings, suggesting that technologies such as the absorption chiller may be overlooked in typical designs; its integration can reduce demand charges even in the absence of combined heat and power. We show that total cost is most sensitive to changes in site electrical demand, followed by capital cost, fuel cost, photovoltaic production, and monthly demand charges; changes in fuel cost primarily affect system sizes of combined heat and power and the absorption chiller, while photovoltaic system size is more sensitive to the changes in capital and fuel costs, photovoltaic resource availability, and hourly electrical demand. Finally, an outage simulator demonstrates the ability of our optimized system to sustain with no interruptions in power five-hour outages with probability 1.0 and ten-hour outages with probability 0.65, significant improvements over 0.5 and 0.0, respectively, under a business-as-usual case.

24 POWER TRANSMISSION AND DISTRIBUTION↗