An AI approach for scheduling space-station payloads at Kennedy Space Center

The Payload Processing for Space-Station Operations (PHITS) is a prototype modeling tool capable of addressing many Space Station related concerns. The system's object oriented design approach coupled with a powerful user interface provide the user with capabilities to easily define and model many applications. PHITS differs from many artificial intelligence based systems in that it couples scheduling and goal-directed simulation to ensure that on-orbit requirement dates are satisfied.

Castillo, D.↗

Risk-Informed Decision Making: Application to Technology Development Alternative Selection

NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

Dezfuli, Homayoon↗

Modulation of red cell mass by neocytolysis in space and on Earth

Astronauts predictably experience anemia after return from space. Upon entering microgravity, the blood volume in the extremities pools centrally and plasma volume decreases, causing plethora and erythropoietin suppression. There ensues neocytolysis, selective hemolysis of the youngest circulating red cells, allowing rapid adaptation to the space environment but becoming maladaptive on re-entry to a gravitational field. The existence of this physiologic control process was confirmed in polycythemic high-altitude dwellers transported to sea level. Pathologic neocytolysis contributes to the anemia of renal failure. Understanding the process has implications for optimizing erythropoietin-dosing schedules and the therapy of other human disorders. Human and rodent models of neocytolysis are being created to help find out how interactions between endothelial cells, reticuloendothelial phagocytes and young erythrocytes are altered, and to shed light on the expression of surface adhesion molecules underlying this process. Thus, unraveling a problem for space travelers has uncovered a physiologic process controlling the red cell mass that can be applied to human disorders on Earth.

Review, Tutorial↗

Scheduling Software for Complex Scenarios

Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

Source record↗

Scheduling and rescheduling with iterative repair

This paper describes the GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle Ground Processing. The system uses constraint-based iterative repair, a technique that starts with a complete but possibly flawed schedule and iteratively improves it by using constraint knowledge within repair heuristics. In this paper we explore the tradeoff between the informedness and the computational cost of several repair heuristics. We show empirically that some knowledge can greatly improve the convergence speed of a repair-based system, but that too much knowledge, such as the knowledge embodied within the MIN-CONFLICTS lookahead heuristic, can overwhelm a system and result in degraded performance.

Zweben, Monte↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Digital control of high performance aircraft using adaptive estimation techniques

In this paper, an adaptive signal processing algorithm is joined with gain-scheduling for controlling the dynamics of high performance aircraft. A technique is presented for a reduced-order model (the longitudinal dynamics) of a high performance STOL aircraft. The actual controller views the nonlinear behavior of the aircraft as equivalent to a randomly switching sequence of linear models taken from a preliminary piecewise-linear fit of the system nonlinearities. The adaptive nature of the estimator is necessary to select the proper sequence of linear models along the flight trajectory. Nonlinear behavior is approximated by effective switching of the linear models at random times, with durations reflecting aircraft motion in response to pilot commands.

Van Landingham, H. F.↗

Computer-aided analysis and design of the shape rolling process for producing turbine engine airfoils

Mild steel (AISI 1018) was selected as model cold rolling material and Ti-6A1-4V and Inconel 718 were selected as typical hot rolling and cold rolling alloys, respectively. The flow stress and workability of these alloys were characterized and friction factor at the roll/workpiece interface was determined at their respective working conditions by conducting ring tests. Computer-aided mathematical models for predicting metal flow and stresses, and for simulating the shape rolling process were developed. These models utilized the upper bound and the slab methods of analysis, and were capable of predicting the lateral spread, roll separating force, roll torque, and local stresses, strains and strain rates. This computer-aided design system was also capable of simulating the actual rolling process, and thereby designing the roll pass schedule in rolling of an airfoil or a similar shape.

Lahoti, G. D.↗

Computer-aided analysis and design of the shape rolling process for producing turbine engine airfoils

Mild steel (AISI 1018) was selected as model cold-rolling material and Ti-6Al-4V and INCONEL 718 were selected as typical hot-rolling and cold-rolling alloys, respectively. The flow stress and workability of these alloys were characterized and friction factor at the roll/workpiece interface was determined at their respective working conditions by conducting ring tests. Computer-aided mathematical models for predicting metal flow and stresses, and for simulating the shape-rolling process were developed. These models utilize the upper-bound and the slab methods of analysis, and are capable of predicting the lateral spread, roll-separating force, roll torque and local stresses, strains and strain rates. This computer-aided design (CAD) system is also capable of simulating the actual rolling process and thereby designing roll-pass schedule in rolling of an airfoil or similar shape. The predictions from the CAD system were verified with respect to cold rolling of mild steel plates. The system is being applied to cold and hot isothermal rolling of an airfoil shape, and will be verified with respect to laboratory experiments under controlled conditions.

Lahoti, G. D.↗

Surface Seal for Carbon Parts

Surface pores in parts made of graphite or reinforced-carbon/ carbon materials are sealed by a silicon carbide-based coating. Coating inhibits subsurface oxidation and lengthens part life. Starting material for coating is graphite felt, which is converted to silicon carbide felt by processing it according to a prescribed time/temperature schedule. Converted felt is pulverized in a ball mill and resulting powder is mixed with an equal weight of black silicon carbide powder. Powder mixture is combined with an equal weight of adhesive to form a paste.

Shuford, D. M.↗

Hot Microfissuring in Nickel Alloy

Experiments in intergranular cracking of nickel alloy near solidus temperature discussed in contractor report. Purpose of investigation development of schedule for welding, casting, forging, or other processing of alloy without causing microfissuring.

Thompson, R. G.↗

Differential Curing In Fiber/Resin Laminates

Modified layup schedule counteracts tendency toward delamination. Improved manufacturing process resembles conventional process, except prepregs partially cured laid on mold in sequence in degree of partial cure decreases from mold side to bag side. Degree of partial cure of each layer at time of layup selected by controlling storage and partial-curing temperatures of prepreg according to Arrhenius equation for rate of gel of resin as function of temperature and time from moment of mixing. Differential advancement of cure in layers made large enough to offset effect of advance bag-side heating in oven or autoclave. Technique helps prevent entrapment of volatile materials during manufacturing of fiber/resin laminates.

Webster, Charles N.↗

MODIS information, data and control system (MIDACS) operations concepts

The MODIS Information, Data, and Control System (MIDACS) Operations Concepts Document provides a basis for the mutual understanding between the users and the designers of the MIDACS, including the requirements, operating environment, external interfaces, and development plan. In defining the concepts and scope of the system, how the MIDACS will operate as an element of the Earth Observing System (EOS) within the EosDIS environment is described. This version follows an earlier release of a preliminary draft version. The individual operations concepts for planning and scheduling, control and monitoring, data acquisition and processing, calibration and validation, data archive and distribution, and user access do not yet fully represent the requirements of the data system needed to achieve the scientific objectives of the MODIS instruments and science teams. The teams are not yet formed; however, it is possible to develop the operations concepts based on the present concept of EosDIS, the level 1 and level 2 Functional Requirements Documents, and through interviews and meetings with key members of the scientific community. The operations concepts were exercised through the application of representative scenarios.

Han, D.↗

Aluminum U-groove weld enhancement based on experimental stress analyses

Though butt-welds are among the most preferred joining methods in aerostructures because of their sealing and assembly integrity and general elastic performance; their inelastic mechanics are generally the least understood. This study investigated experimental strain distributions across a thick aluminum U-grooved weld and identified two weld process considerations for improving the multipass weld strength. The extreme thermal expansion and contraction gradient of the fusion heat input across the tab thickness between the grooves produce severe peaking, which induces bending moment under uniaxial loading. The filler strain hardening decreased with increasing filler pass sequence. These combined effects reduce the weld strength, and a depeaking index model was developed to select filler pass thicknesses, pass numbers, and sequences to improve the welding process results over the current normal weld schedule.

Verderaime, V.↗

Data Acquisition and Control Systems Laboratory

The Data Acquisition and Control Systems (DACS) Laboratory is a facility at Stennis Space Center that provides an off test-stand capability to develop data-acquisition and control systems for rocket-engine test stands. It is also used to train new employees in state-of-the-art systems, and provides a controlled environment for troubleshooting existing systems, as well as the ability to evaluate the application of new technologies and process improvements. With the SSC propulsion testing schedules, without the DACS Laboratory, it would have been necessary to perform most of the development work on actual test systems, thereby subjecting both the rocket-engine testing and development programs to substantial interference in the form of delays, restrictions on modifications of equipment, and potentially compromising software configuration control. The DACS Laboratory contains a versatile assortment of computer hardware and software, digital and analog electronic control and data-acquisition equipment, and standard electronic bench test equipment and tools. Recently completed Control System development and software verification projects include support to the joint NASA/Air Force Integrated Powerhead Demonstration (IPD) LOX & LH2 PreBurner and Turbopump ground testing programs. In other recent activities, the DACS Laboratory equipment and expertise have supported the off-stand operation of high-pressure control valves to correct valve leak problems prior to installation on the test stand. Future plans include expanding the Laboratory's capabilities to provide cryogenic control valve characterization prior to installation, thereby reducing test stand activation time.

Holland, Randy↗

NASA'S Simulant Development Program Evolution and Overview

Since its origination under NASA's previous Human System Research and Technology program, the Lunar Simulant Development Program has undergone several changes. NASA recognized as early as the Apollo Program, and even more so as a result of the Apollo missions, that a viable dust and lunar simulant program is critical to the success of its space exploration goals. Unfortunately, this program has suffered the same problems that all programs share from time to time including uncertain budgets, shifting of priorities, and schedule fluctuations. To compound the problem, the process for developing simulants is being redefined and is not a trivial pursuit. Before now, NASA had not attempted to develop a suitable standard simulant since the 1990s when JSC-1 was produced. Although several other simulants have been developed by various groups both before and after the production of JSC-1, JSC-1 had become the de facto standard even though it has some limitations. The development and production of new simulants will address some of these limitations by starting with an assessment of NASA's needs and understanding the required processing in order to make these simulants.

McLemore, Carole↗

X-37 C/SiC Ruddervator Subcomponent Test Program

Completed thermal-mechanical and mechanical load testing: a) 6 re-entry heating tests (3 with loading to 50% DLL), 3 hypersonic cruise tests with loading to 50% DLL and 4 high-temperature modal survey tests. b) 9 tests to 100% DLL. High-temperature modal survey results were inconclusive due to exceeding capability of some accelerometers. Overall good correlation between analysis and measured results for windward and leeward surface temperatures. Generally poor correlation between analysis and measured results for spindle area temperatures. Excellent test-to-test repeatability in strain and deflection data for 100% DLL testing. In-situ thermography images taken before and after thermal testing showed only minor changes in initial defects. Final detailed thermography tests scheduled for completion in Oct 09. In process of completing test documentation and test data analysis. Final reports complete by Dec 09. All analysis, test data, test plans, reports, photos, etc. will be made available to the technical community via the CMC Wiki.

Hudson, Larry D.↗

Improving Life-Cycle Cost Management of Spacecraft Missions

This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

Clardy, Dennon↗