Search NASA⌕ Search

SEARCH · Search NASA

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

A small missions program for investigation of near-earth asteroids

Current studies are examining the feasibility and possible content of the Discovery Program, a series of 'Explorer-class' missions to planetary targets. Organized as a multi-layer program with constant funding, the Discovery Program would support lower cost exploration opportunities that are missed in the new start procedure for larger missions. One approach to such a program is to focus on rendezvous missions to several near-Earth asteroids to characterize basic properties of this group of objects. A sample program is presented that visits six different targets over twelve years, using direct low energy trajectories; some of these are newly identified. Each flight in the program delivers a payload capable of addressing science objectives within the expected budget and programmatic constraints of small planetary missions. The key to satisfying the constraints is a disciplined program management philosophy, consistently applied over the entire program, that makes extensive use of hardware designs developed for other programs.

Stancati, M. L.↗

A Characterization of the Terrestrial Environment of Kodiak Island, Alaska for the Design, Development and Operation of Launch Vehicles

A quantitative characterization of the terrestrial environment is an important component in the success of a launch vehicle program. Environmental factors such as winds, atmospheric thermodynamics, precipitation, fog, and cloud characteristics are among many parameters that must be accurately defined for flight success. The National Aeronautics and Space Administration (NASA) is currently coordinating weather support and performing analysis for the launch of a NASA payload from a new facility located at Kodiak Island, Alaska in late 2001 (NASA, 1999). Following the first launch from the Kodiak Launch Complex, an Air Force intercontinental ballistic missile on November 5, 1999, the site's developer, the Alaska Aerospace Development Corporation (AADC), is hoping to acquire a sizable share of the many launches that will occur over the next decade. One such customer is NASA, which is planning to launch the Vegetation Canopy Lidar satellite aboard an Athena I rocket, the first planned mission to low earth orbit from the new facility. To support this launch, a statistical model of the atmospheric and surface environment for Kodiak Island, AK has been produced from rawinsonde and surface-based meteorological observations for use as an input to future launch vehicle design and/or operations. In this study, the creation of a "reference atmosphere" from rawinsonde observations is described along with comparisons between the reference atmosphere and existing model representations for Kodiak. Meteorological conditions that might result in a delay on launch day (cloud cover, visibility, precipitation, etc.) are also explored and described through probabilities of launch by month and hour of day. This atmospheric "mission analysis" is also useful during the early stages of a vehicle program, when consideration of the climatic characteristics of a location can be factored into vehicle designs. To be most beneficial, terrestrial environment definitions should a) be available at the inception of the program and based on the desired operational performance of the launch vehicle, b) be issued under the signature of the program manager and be part of the controlled program definition and requirements documentation, and c) specify the terrestrial environment for all phases of activity including prelaunch, launch, ascent, on-orbit, decent, and landing. Since the beginning of the space era, NASA has utilized some of the most detailed assessments of the terrestrial climatic environment in design, development, and operations of both expendable and reusable launch vehicles.

Rawlins, Michael A.↗

Aerospace Safety Advisory Panel

This report presents the results of the Aerospace Safety Advisory Panel (ASAP) activities during 2002. The format of the report has been modified to capture a long-term perspective. Section II is new and highlights the Panel's view of NASA's safety progress during the year. Section III contains the pivotal safety issues facing NASA in the coming year. Section IV includes the program area findings and recommendations. The Panel has been asked by the Administrator to perform several special studies this year, and the resulting white papers appear in Appendix C. The year has been filled with significant achievements for NASA in both successful Space Shuttle operations and International Space Station (ISS) construction. Throughout the year, safety has been first and foremost in spite of many changes throughout the Agency. The relocation of the Orbiter Major Modifications (OMMs) from California to Kennedy Space Center (KSC) appears very successful. The transition of responsibilities for program management of the Space Shuttle and ISS programs from Johnson Space Center (JSC) to NASA Headquarters went smoothly. The decision to extend the life of the Space Shuttle as the primary NASA vehicle for access to space is viewed by the Panel as a prudent one. With the appropriate investments in safety improvements, in maintenance, in preserving appropriate inventories of spare parts, and in infrastructure, the Space Shuttle can provide safe and reliable support for the ISS for the foreseeable future. Indications of an aging Space Shuttle fleet occurred on more than one occasion this year. Several flaws went undetected in the early prelaunch tests and inspections. In all but one case, the problems were found prior to launch. These incidents were all handled properly and with safety as the guiding principle. Indeed, launches were postponed until the problems were fully understood and mitigating action could be taken. These incidents do, however, indicate the need to analyze the Space Shuttle certification criteria closely. Based on this analysis, NASA can determine the need to receritfy the vehicles and to incorporate more stringent inspections throughout the process to minimize launch schedule impact. A highly skilled and experience workforce will be increasingly important for safe and reliable operations as the Space Shuttle vehicles and infrastructure continue to age.

Source record↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

Aggregate Risk Tool for Human Space Flight

This tool utilizes Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and present risk data from multiple Program and Commercial Provider sources to provide a holistic assessment for Program Managers and Technical Authorities to evaluate residual risk prior to HSF Launches. The aggregation, or coupling of risks from multiple sources (Ex: PRA, variances, anomaly data bases, CRM data, technical review board minutes, Hazard Analysis, etc.) identifies areas of elevated risk in components, systems or mission phases that would otherwise be undetected by non-integrated program risk management tools and possesses. Data is then displayed in an interactive user interface/dashboard that enables users to see potential areas of concern requiring more in-depth analysis.

Patrick M Huckaby↗

A visiting scientist program for the burst and transient source experiment

During this project, Universities Space Research Association provided program management and the administration for overseeing the performance of the total contractual effort. The program director and administrative staff provided the expertise and experience needed to efficiently manage the program.USRA provided a program coordinator and v visiting scientists to perform scientific research with Burst and Transient Source Experiment (BATSE) data. This research was associated with the primary scientific objectives of BATSE and with the various BATSE collaborations which were formed in response to the Compton Gamma Ray Observatory Guest Investigator Program. USRA provided administration for workshops, colloquia, the preparation of scientific documentation, etc. and also provided flexible program support in order to meet the on-going needs of MSFC's BATSE program. USRA performed tasks associated with the recovery, archiving, and processing of scientific data from BATSE. A bibliography of research in the astrophysics discipline is attached as Appendix 1. Visiting Scientists and Research Associates performed activities on this project, and their technical reports are attached as Appendix 2.

Kerr, Frank J.↗

Sandia's Liquid-Cooled Data Center Boosts Efficiency and Resiliency

The Federal Energy Management Program (FEMP) encourages federal agencies and organizations to improve data center energy efficiency, which can offer tremendous opportunities for energy and cost savings. In this success story, a novel liquid cooling system provides reliable, resilient, and energy-efficient cooling for high-performance computing (HPC) systems at Sandia National Laboratories.

data center↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Apollo lunar orbital sciences program alpha and X-ray spectrometers

The development of the alpha and X-ray spectrometers which were used on the Apollo 15 and 16 flights is discussed. Specific subjects presented are: (1) lunar program management, (2) scientific and technical approach, (3) major test programs, (4) reliability, quality assurance, and safety, and (5) subcontract management.

Source record↗

Methods of Increasing Terminal Airspace Flexibility and Control Authority

The focus of the NRA contract is to develop a What-if Analysis Tool for planning Departure Management Programs (DMP) at airports. This final report summarizes the work conducted throughout the base year, with a focus on use case specification for the what-if analysis capability and the implementation of the What-if Analysis Tool and its application to traffic and weather scenarios at Charlotte Douglas International Airport (CLT).

NRA Final Report↗

Evaluation of Data Catalog Software for Hanford Site Environmental Datasets

Environmental information and data underpin achievement of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) mission at the Hanford Site. The Hanford Environmental Data Management (HEDM) Program is the DOE Richland Operations Office (RL) approach to develop and implement a formal program for managing environmental data and the associated records, materials, and systems at the Hanford Site. The current project, contract, organization, and contractor-specific efforts at managing environmental data sets are insufficient to provide orderly, long-term, site-wide access. A vital element to be created within the HEDM program plan is a catalog of data sources, called the Hanford Environmental Information and Data Index (HEIDI), that will enable long-term access and retrievability for the multiple independent sources of data that might otherwise be difficult to discover. This report compares leading open source and commercial data catalog platforms using criteria to assess the functionality needed to develop the HEIDI catalog of Hanford data sources that connects and exchanges data with established Hanford Local Area Network (HLAN) enterprise information technology systems. Proprietary platforms evaluated included ArcGIS Enterprise Sites, Junar, OpenDataSoft, and Socrata, and non-proprietary platforms included Energy Data eXchange (EDX), Comprehensive Knowledge Archive Network (CKAN), and DKAN (a Drupal-based open data portal based on CKAN). Capabilities supporting data discoverability, retrieval, and archival, as well as metadata standard requirements and integration into the HLAN were rated as either failing to meet requirements (F), meeting requirements (M), or exceeding requirements by delivering additional desired features (E). The lowest rating for any capability area was assigned as the overall rating for the platform. These findings enable DOE-RL and the contractors implementing the HEDM plan to focus on candidate tools likely to meet the requirements for implementing HEIDI. All of the platforms receiving an overall rating of ‘F’ were unable to be deployed on Hanford infrastructure or within dedicated cloud resources. A propriety software-as-a-service (SaaS) model of delivering a data catalog (e.g., found in software such as Junar and OpenDataSoft) favors consistency across customers at the expense of customization and configurable roles that are needed for Hanford work. Hosting data on a shared commercial platform places limits on dataset size (maximum of 240 Mb for OpenDataSoft), a significant limitation for HEIDI implementation. EDX, a government data catalog based on CKAN, received the ‘F’ rating due to an inability to incorporate authentication from HLAN into the system. Among platforms rated ‘M’ or ‘E’, only the Socrata platform had a SaaS delivery model. In contrast to other SaaS platforms, Socrata provided custom roles and gateways that allow local datasets to be incorporated into an online catalog. Socrata also complies with the Federal Risk and Authorization Management Program, a significant benefit for cloud-based management of Hanford data. The other platforms rated ‘M’ or ‘E’, ArcGIS Enterprise Sites, CKAN, and DKAN, provide fully self-hosted options, allowing for greater control and flexibility with the HEIDI catalog. These widely used tools have supportive communities of practice, extensive customization options, and demonstrated deployments that provide evidence that they can meet requirements, often deliver additional desired features, and work well with federal government systems. Completely customized alternatives built on a collection of applications were not evaluated because achieving similar performance to CKAN or DKAN requires substantial resources, especially in the absence of the active communities that have grown to support these tools. ArcGIS Enterprise Sites, Socrata, CKAN, and DKAN were evaluated as strong candidates for successful implementation with HEIDI.

54 ENVIRONMENTAL SCIENCES↗

Development of Methods of Increasing Terminal Flexibility and Control Authority: Option Year 1 Final Report

The focus of the NRA contract is to develop a What-if Analysis Tool for planning Departure Management Programs (DMP) at airports. This final report summarizes the work conducted throughout the option year, with a focus on use case specification for the what-if analysis capability and the implementation of the What-if Analysis Tool and its application to traffic and weather scenarios at Charlotte Douglas International Airport (CLT).

Departure Management Programs (DMP)↗

Desktop Audits: Overview, Case Studies, Guidance

The Energy Independence and Security Act (EISA) of 2007 requires that federal agencies audit 25% of their 3.1 billion square feet of covered facilities each year. Several newer, advanced options such as monitoring-based commissioning, fault detection and diagnostics, and energy management systems can help support data collection and analysis to be used for EISA compliance. The Federal Energy Management Program's (FEMP’s) Audit Decision Tree, Audit Definitions, and FEMP Guidance can be used by Agencies to determine the best approaches to evaluate their facilities. FEMP continues to develop additional resources to support agencies in meeting EISA compliance. This presentation gives an overview of desktop audits, including case studies and guidance.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Considering Climate Change Scenarios in Site Resilience Planning

This paper was prepared in support of the U.S. Department of Energy’s Federal Energy Management Program. The paper serves as a resource for site-level personnel who are performing energy and water resilience planning at their sites and who need to identify and incorporate data that may help them assess risks to infrastructure and operations as a result of future climate change impacts. Specifically, the paper is a high-level look at available scenarios of future climate that can be incorporated into assessments based on U.S. regional models.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ESPC ESA Webinar Series: ESPC IDIQ Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) vehicle. The DOE IDIQ ESPC contract vehicle uses a streamlined master contract that allows federal agencies to work with 21 energy service companies holding the current DOE IDIQ ESPC. Topics covered in the webinar include: An overview of the DOE IDIQ contract vehicle; ESA-specific considerations for IDIQ contracts; and Specific use cases. The webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as IDIQ tools and templates. This webinar is the fifth in a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Flammable Gas Generation and Control at the Idaho Completion Project Legacy Combustible Gas Generation - 20191

On April 11, 2018, four drums containing transuranic waste at the Idaho National Laboratory underwent over-pressurization, ejecting their lids and spreading radiological waste within a facility. An investigation has found that waste in the drums generated methane gas, which contributed to the event. Subsequent to the investigation, the potential for drums to have methane and other flammable analytes whose concentrations could approach or exceed the lower flammability limit (LFL) and the adequacy of the controls to prevent or mitigate a possible deflagration was evaluated. An extensive review of the historical records was performed to determine how many drums exceed the LFL. The historical record identified a small quantity of drums that exceeded the LFL for xylene, hydrogen, and methane. The primary codified applicable code or standard for handling drums is 29 CFR 1910.120 (j) 'Handling Drums and Containers.' It is used throughout the commercial and government sector. This code is integrated throughout the Fluor Idaho safety management programs and procedures to control the Standard Industrial Hazards (SIHs) associated with drum and container handling. Example requirements include: - Drums and containers are inspected, and their integrity assured prior to being moved. - Site operations are organized to minimize the amount of drum or container movement. - When there is a reasonable possibility of flammable atmospheres being present, material handling equipment and hand tools are of the type to prevent sources of ignition. Drums and containers under pressure, as evidenced by bulging or swelling, are not moved until the cause for excess pressure is determined and appropriate containment procedures have been implemented to protect employees from explosive relief of the drum. Drums which exceed the WIPP FGA limit have NCRs associated with them. Once a drum fails flammable gas sampling, an NCR is initiated. The NCR drives placement into NCR dense pack rows. A standing order drives placement of the FGA failures to a single planer segregation location. These drums are not allowed for further processing or shipment until the NCR has been cleared. Once in the single planer rows, follow-up FGA testing is performed by CCP. The NCR is dispositioned by follow-up sampling occurring after adequate time has been provided for the gas to diffuse through the filter assembly, or, in some cases, the drums are repackaged into additional drums to reduce the source term. To date, the ICP project has performed approximately 1.5 million drums moves without a deflagration event due to combustible gas generation. Flammable gas generation in a transuranic waste drum is not unique to the ICP but is common across the DOE complex. Based on the experience at Idaho, application of industry standards is sufficient to control the risk of drum deflagration due to drum movements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗