Search NASA⌕ Search

SEARCH · Search NASA

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Experimental capabilities of the LMJ-PETAL facility

In this study, recent progress in the experimental capabilities of the LMJ-PETAL laser facility is reviewed. Updates on the indirect-drive D 2 implosion experiments and equation-of-state experiments using the LMJ laser are presented, including the commissioning of new plasma diagnostics. Several recent campaigns using the PETAL laser alone are also presented, namely the development of a platform using high-resolution and high-energy X-ray sources for radiography experiments, laser wakefield acceleration studies in the self-modulated regime, and neutron generation using a Target Normal Sheath Accelerated proton beam in a pitcher-catcher configuration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress in the design of the future circular collider FCC-ee interaction region

In this paper we discuss the latest developments for the FCC-ee interaction region layout, which represents one of the key ingredients to establish the feasibility of the FCC-ee. The collider has to achieve extremely high luminosities over a wide range of center-of-mass energies with two or four interaction points. The complex final focus hosted in the detector region has to be carefully designed, and the impact of beam losses and of any type of synchrotron radiation generated in the interaction region, including beamstrahlung, have to be evaluated in detail with simulations. We give an overview of the progress of the whole machine-detector-interface-related studies, among which are the updated mechanical model of the interaction region, the plans for a novel R&D activity of a IR mockup which is just starting, the collimation scheme and evaluation of beam induced backgrounds in the detectors, evaluation of radiation dose in the experimental area, and MDI integration with the detector.

43 PARTICLE ACCELERATORS↗

Progress on Computational Modeling of Water-Based NSTF (FY2021)

This report documents the FY21 progress and achievements made in the computational analyses of the water-based NSTF. Both system-level and high-fidelity Computational Fluid Dynamics (CFD) analyses were performed to gain a complete understanding of the complex flow and heat transfer phenomena in natural convection systems. The progress on the waterbased NSTF experimental testing is summarized in a companion report (ANL-ART-230). As a continuation of progress from previous years, in FY21 the RELAP5 model of the NSTF was first updated to include a representative heated cavity that incorporated convection and conduction means of heat transfer. Two different cavity models were developed, one that models the radiation heat exchange among all surfaces in one enclosure (Cavity Model 1), and another that employs multiple radiation enclosures with each considering the surfaces at one axial level (Cavity Model 2). This updated RELAP5 deck was benchmarked with single-phase test data to tune form loss coefficients of the elbows and tees, along with heat transfer coefficients within the cavity and off the external insulation panels. This tuned model was then found to accurately predict fluid temperatures within 2.5% and both system and riser flow rates within 6% during single-phase, steady-state simulations. For transient simulations, there is a slight over prediction of the flow rate, fluid temperatures, and heater temperatures during the heat-up period, which indicate that the transient heat loss may be underestimated. Following, the capabilities of RELAP5-3D were examined, which feature a conduction enclosure model that is not present in the current version of RELAP5-MOD3.3 used for all previous NSTF simulations. As an initial comparison of the two codes, single-phase simulations were run that used similar input decks. The results indicate that the single-phase flow predicted by the two codes was very similar, however RELAP5-3D appears to predict a higher system flow during the two-phase transient when compared to the flow rates predicted by RELAP5-MOD3.3. Furthermore, RELAP5-3D run did not capture the density wave oscillations or geysering phenomena, which are large oscillation flow instabilities observed in the experimental facility. To further the prediction capabilities for capturing two-phase instabilities, Options 55, 57, 58, 61, which are implemented by default in RELAP5-MOD3.3 but not in RELAP5-3D, were investigated. When enabling Option 61, RELAP5-3D agrees well with MOD3.3 in predicting the total system flow, while other options have negligible effect on the predicted total system flow by RELAP5-3D. However, none of these options enables RELAP5-3D to produce the same flow instabilities. For future steps, efforts are currently underway to investigate RELAP5-3D’s different behavior in predicting low-pressure two-phase instabilities. STAR-CCM+ was used to perform CFD analysis of the water-based test facility and provide simulation results for comparisons to experimental data. Efforts first focused on describing the characteristics of flow within the heated cavity. A study was performed on whether possible leakage flow between the two sides of the cavity could substantially impact and explain the results. An additional second assumption was examined which defined adiabatic side walls, so physical insulation structures were added to the models to allow conduction across this outer insulation. The results suggest that potential porosity of the insulation could be a major factor in the temperature distribution within the cavity and should be considered in any studies where it is desirable to know the cavity wall temperatures to higher accuracy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Update on the development of the Space Shuttle main engine /as of June 20, 1978/

During the last year, significant progress was made toward the development of the Space Shuttle Main Engine which will provide propulsion for the Space Shuttle Orbiter Vehicle. Component and subsystem testing was conducted at the Rocketdyne Santa Susana Field Laboratory on combustion devices, turbomachinery, and the engine POGO suppression system. Engine testing continued at the National Space Technology Laboratories on both single engines and a three-engine cluster. As a result of these tests, hardware limitations were identified and design modifications were incorporated and evaluated by further testing. Current effort is being directed toward the delivery of the first flight engines and certification of the SSME for manned flight.

Johnson, J. R.↗

The NASA Continuous Risk Management Process

As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics are established and monitored as tools for risk tracking. Also a trigger or threshold should be set on the metric data that indicates when an action is needed. Results of this tracking are usually evaluated and reported in a relevant format at weekly or monthly meetings. Choosing controls is the subsequent step, which involves the effects of the tracking. The three basic controls are: close, continue tracking, and re- plan. Finally communicate & document is the last step, but occurs throughout the process. It is vital that main risks, plans, changes, and progress are known by everyone in the project. A good way to keep everyone updated and inform other projects of common issues is by thoroughly documenting project risks. NASA sees value in risk management and believes that projects have greater probability or success by using the NASA Continuous Risk Management Process.

Pokorny, Frank M.↗

RCC NDE Update

This slide presentation reviews non-destructive evaluation (NDE) techniques of Reinforced Carbon-Carbon (RCC) materials and the progress involved in bringing the technology to technological maturity. Included is information about the test specimens, thermographic, ultrasonic, eddy current, and radiographic inspection of RCC materials.

Hernandez, Jose M.↗

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. Programmatic lessons learned associated with risk management, contract oversight, and requirement definition during the fabrication and assembly are discussed. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Electric Propulsion↗

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. A brief overview of three of SEP’s programmatic lessons learned are discussed: risk management, contract oversight, and requirement definition. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Mars Exploration↗

Development of GENOA Progressive Failure Parallel Processing Software Systems

A capability consisting of software development and experimental techniques has been developed and is described. The capability is integrated into GENOA-PFA to model polymer matrix composite (PMC) structures. The capability considers the physics and mechanics of composite materials and structure by integration of a hierarchical multilevel macro-scale (lamina, laminate, and structure) and micro scale (fiber, matrix, and interface) simulation analyses. The modeling involves (1) ply layering methodology utilizing FEM elements with through-the-thickness representation, (2) simulation of effects of material defects and conditions (e.g., voids, fiber waviness, and residual stress) on global static and cyclic fatigue strengths, (3) including material nonlinearities (by updating properties periodically) and geometrical nonlinearities (by Lagrangian updating), (4) simulating crack initiation. and growth to failure under static, cyclic, creep, and impact loads. (5) progressive fracture analysis to determine durability and damage tolerance. (6) identifying the percent contribution of various possible composite failure modes involved in critical damage events. and (7) determining sensitivities of failure modes to design parameters (e.g., fiber volume fraction, ply thickness, fiber orientation. and adhesive-bond thickness). GENOA-PFA progressive failure analysis is now ready for use to investigate the effects on structural responses to PMC material degradation from damage induced by static, cyclic (fatigue). creep, and impact loading in 2D/3D PMC structures subjected to hygrothermal environments. Its use will significantly facilitate targeting design parameter changes that will be most effective in reducing the probability of a given failure mode occurring.

Abdi, Frank↗

SFWST Disposal Research R&D 5-Year Plan (FY2023 Update)

This FY2023 report is the second update to the Disposal Research (DR) Research and Development (R&D) 5-year plan for the Spent Fuel and Waste Science and Technology (SFWST) Campaign DR R&D activities. In the planning for FY2020 in the U.S. Department of Energy (DOE) NE-81 SFWST Campaign, the DOE requested development of a high-level summary plan for activities in the DR R&D program for the next five (5)-year period, with periodic updates to this summary plan. The DR R&D 5-year plan was provided to the DOE based initially on the FY2020 priorities and program structure (initial 2020 version of this 5-year plan) and provides a strategic summary guide to the work within the DR R&D technical areas (Control Accounts, CA), focusing on the highest priority technical thrusts. This 5-year plan is a living document (planned to be updated periodically) that provides review of SFWST R&D accomplishments (as seen on the 2021 revision of this 5-year plan), describes changes to technical R&D prioritization based on (a) progress in each technical area (including external technical understanding) with specific accomplishments and (b) any changes in SFWST Campaign objectives and/or funding levels (i.e., Program Direction). Updates to this 5-year plan include the DR R&D adjustments to high-priority knowledge gaps to be investigated in the near-term, as well as the updated longer-term DR R&D directions for the program activities. This plan fulfills the Milestone M2SF23SN010304083 in DR Work Package (WP) SF-23SN01030408 (GDSA - Framework Development – SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R&D Adoption and Progress in Full Simulation of the CMS experiment

In this work we report on evolution of usage of Geant4 within CMSSW and adaptation of the newest Geant4 11.2.1, which is expected to be used for CMS simulation production in 2025. Physics validation results and results on CPU performance are reported. For the Phase-2 simulation several R&D are carried out. A significant update for CMS geometry description is performed. Different aspects of geometry description and physics simulation for the new detectors will be discussed. Progress on R&D efforts for the Phase-2 simulation will be presented, which includes reports on experience of application of G4HepEm external library.

Srimanobhas, Norraphat [Chulalongkorn U.]↗

Updates on Modeling the Water Cycle with the NASA Ames Mars Global Climate Model

Global Circulation Models (GCMs) have made steady progress in simulating the current Mars water cycle. It is now widely recognized that clouds are a critical component that can significantly affect the nature of the simulated water cycle. Two processes in particular are key to implementing clouds in a GCM: the microphysical processes of formation and dissipation, and their radiative effects on heating/ cooling rates. Together, these processes alter the thermal structure, change the dynamics, and regulate inter-hemispheric transport. We have made considerable progress representing these processes in the NASA Ames GCM, particularly in the presence of radiatively active water ice clouds. We present the current state of our group's water cycle modeling efforts, show results from selected simulations, highlight some of the issues, and discuss avenues for further investigation.­

Global Circulation Models (GCMs)↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗

Thematic Mapper Image Processing System (TIPS) Processing Status

Radiometric and geometric correction performance is considered. A one quantum level requirement was met in all spectral bands with an occasional band 7 exception. Initial post launch calibration was accomplished. An absolute radiometric calibration is in progress including an investigation of low impact solution to scan striping. Initial and three downstream updates as well as coordination with LANDSAT D' instrument calibration are planned. Methods and problems in measuring geometric correction performance are examined with an emphasis on temporal registration, geodetic registrtion, and the modeling error budget. Planned efforts include eliminating band 2, band 5 chips; continued performance monitoring; calibration of profile, misalignment angles, and filer parameters; studying the need for seasonal geodetic control points; and improvement of the subpixel correlation technique.

Brooks, J.↗

FY24: Progress Report on the MELCOR Modeling of the Liquid Salt Test Loop

This report outlines the activities conducted in FY24 focused on updating the liquid salt test loop (LSTL) model through the integration of a new test section featuring 16 radial tubes coupled to a filter section. Some comparative analyses of the updated model with existing experimental data for the LSTL was made and benchmarked against other computational tools, such as the ORNL code, SAM. These actions are part of a comprehensive validation effort and promote collaboration among laboratories participating in the Molten Salt Reactor (MSR) campaign.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update

In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.

Electric Propulsion↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GGOS Bureau of Networks and Observations: Network Infrastructure and Related Activities

The GGOS Bureau of Networks and Observations works with the IAG Services (IVS, ILRS, IGS, IDS, IGFS, and PSMSL) to advocate for the expansion and upgrade of space geodesy networks for the maintenance and improvement of the reference frame and other applications, as well as for the integration with other techniques, including absolute gravity and sea level measurements from tide gauges. New sites are being established following the GGOS concept of “core” and co-location sites, and new technologies are being implemented to enhance performance in data yield as well as accuracy. The Bureau continues to meet with organizations to discuss possibilities, including partnerships, for new and expanded participation. The GGOS Network continues to grow as new stations join every year. The Bureau holds meetings frequently, providing the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. It also monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks and the forthcoming establishment of the new absolute gravity reference frame. The IAG Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-offs (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system for data products and a more comprehensive long-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate and improve procedures to determine systems’ reference points, a crucial aid in the detection of technique-specific systematic errors. We will give a brief update on the status and projection of the network infrastructure of the next several years, and the progress and plans of the Committees/Working Group in their critical role in enhancing data product quality and accessibility to the users.

Carey Noll↗