Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Analytical Modeling of Planetary Excavation for in Situ Resource Utilization

The space-faring capabilities of humans are dependent on the ability to interact with plan-etary surfaces safely and efficiently and utilize local re-sources. Since planetary regolith will be the primary feedstock for in situ resource utilization (ISRU) and infrastructure development activities [1,2], the site-specific geomechanical properties must be understood to optimize excavation operations [3]. Excavating planetary regolith is challenging due to its unique geomechanical properties, 1/6th G reduced gravity extreme conditions, and limited energy resources. Therefore, it is critical to develop technologies that reduce excavation force requirements and minimize tool path inefficiencies to save time and energy during planetary re-source acquisition and infrastructure development [3]. There have been several experimental investigations of methods to optimize planetary excavations [4,5], but none developed predictive capabilities. This abstract presents a simple analytical method that will be used to model laboratory and mission excavation data. Future work will build on the simple analytical method here to include high-fidelity numerical simulations of planetary excavation mechanics.

Regolith↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-based decision making for staggered bioterrorist attacks : resource allocation and risk reduction in "reload" scenarios.

Staggered bioterrorist attacks with aerosolized pathogens on population centers present a formidable challenge to resource allocation and response planning. The response and planning will commence immediately after the detection of the first attack and with no or little information of the second attack. In this report, we outline a method by which resource allocation may be performed. It involves probabilistic reconstruction of the bioterrorist attack from partial observations of the outbreak, followed by an optimization-under-uncertainty approach to perform resource allocations. We consider both single-site and time-staggered multi-site attacks (i.e., a reload scenario) under conditions when resources (personnel and equipment which are difficult to gather and transport) are insufficient. Both communicable (plague) and non-communicable diseases (anthrax) are addressed, and we also consider cases when the data, the time-series of people reporting with symptoms, are confounded with a reporting delay. We demonstrate how our approach develops allocations profiles that have the potential to reduce the probability of an extremely adverse outcome in exchange for a more certain, but less adverse outcome. We explore the effect of placing limits on daily allocations. Further, since our method is data-driven, the resource allocation progressively improves as more data becomes available.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimisation of the Future Routine Orbit for Mars Express

Mars Express (MEX), the first planetary mission of the European Space Agency (ESA), reached Mars on December 25th 2003. Since then it is performing routine operations. Its operational phase had to cover one Martian year, with the possibility of an extension for a second Martian year (i.e. until November 2007). The end of the mission extension is approaching but, given the good health of the payload instruments and the high science return of the mission, there is a strong will to achieve further extensions. Mars Express is also seen as an important asset, capable to provide relay functions for future Martian missions. The ESA Science Program Committee has recently approved a second extension of the MEX mission until May 2009 and even further extensions are possible. Mars Express has an eccentric quasi-polar orbit with a period of approximately 6.72 hours and a pericentre height of about 300 km. Science observations are mainly performed at pericentre (but not only). In addition the orbit has a resonance of 11 revolutions per 3 Martian days. This means that ground tracks corresponding to orbits separated by 11 revolutions are adjacent, such that a given area can be covered by the on-board camera without leaving gaps. The J2 effect of Mars causes a drift of both ascending node and argument of pericentre. The drift of argument of pericentre makes it possible to observe periodically all Mars latitudes from close distance. Illumination conditions at pericentre are influenced by both the drift of the argument of pericentre and the drift of ascending node, as well as by the rotation of Mars around the Sun. The original MEX routine orbit was optimized for the duration of the nominal mission and extension, such that it produced a balanced share of day-side observations (for the optical instruments) and night-side observations (for the radar). The orbit was thus not optimized for the time beyond the assumed extension. Indeed, the evolution of the ascending node and argument of pericentre would cause in the following years a drift of the pericentre towards night-side observation conditions, hence uninteresting for the optical instruments. In order to prevent this an optimisation process for the future routine orbit has taken place. The share between day-side and night-side observations can be controlled by adjusting the drift of argument of pericentre and ascending node. This can in particular be achieved by changing the semimajor axis, eccentricity and/or inclination. A change of inclination is inefficient compared to a change in semimajor axis and eccentricity, and has therefore been discarded. An in-plane maneuvre can be performed to change both semi-major axis and eccentricity, and thus the period of the orbit. Although an apocentre manoeuvre is cheaper in terms of deltaV, it would result in raising the pericentre height, which is unfavourable for close observations. Hence a pericentre manoeuvre is proposed, which will increase the apocentre height. A repeat cycle is still required to allow mapping areas with adjacent ground tracks, so the change of semimajor axis must result in a new resonance. Resonances 18:5, 25:7 and 7:2 have been considered as potential candidates. The resulting long term evolution of the observation conditions has been analysed. Finally it has been decided to perform a change of orbit to reach the 18:5. Another aspect of the optimisation process is the control of the ground track. The previous MEX reference trajectory included regular maneuvres at every apocentre in order to adjust the orbital period, such that the separation of the ground tracks would be optimal, regardless of the latitude of pericentre. The implementation of the actual delatVs on-board was done partly by optimizing the attitude of reaction-wheel desaturation activities. Despite of it, this strategy has a significant propellant cost, because it prevents to optimize reaction wheel de-saturation activities to minimize propellant consumption. Therore, with the aim at preserving propellant resources for a long time extension it has been agreed to stop the ground-track control. This requires now a more accurate science operation planning, with improved attitude pointing control. Finally, the approach to phase Mars Express to provide back-up relay functions for NASA Phoenix landing is explained. In the context of the routine trajectory optimisation a new requirement for close fly-bys at Phobos, with different observation geometries, has been specified. The approach to fulfill this requirement is explained.

Carranza, Manuel↗

Two-Phase Flow in Filters and Orifices: ISS Packed Bed Reactor Experiment Water Recovery Series (PBRE-WRS)

Understanding the hydrodynamics of adiabatic two-phase flows in packed bed reactors offers numerous benefits. It enables the optimization of chemical reactions rates and products which results in more efficient and compact reactors, thus reducing space and resource requirements, crucial for long duration space missions. The Packed Bed Reactor Experiment-Water Recovery Series (PBRE-WRS) is a flight experiment planned for operation on the Microgravity Science Glove box (MSG) facility of the International Space Station (ISS). The objective of the experiment is to validate hydrodynamic models at a range of gas and liquid flow rates, where these models are used in the design of processes for life support systems in microgravity. The microgravity environment allows for measurement and observation of aspects of fluid dynamics that are unique when compared to observations made in full or partial gravity environments. The experiment consists of testing two-phase flow hydrodynamics in three different filters, four (4) orifices and one check valve test articles. The experiment utilizes the hardware of the previously flown PBRE and PBRE-2 with packed beds of different packings materials and sizes. The fluid system of the PBRE-WRS consists of a nitrogen gas delivery and water delivery subsystems. The gas delivery subsystem can accommodate two ranges of gas flow rates, just as for the water delivery system. The nitrogen gas loop is open whereas the water loop is closed. Gas is separated from the water using a gas-liquid phase separator which is located in the water delivery module. Preliminary results from ground testing show the pressure drop across the filters increasing at different rates with the liquid and gas flow rates. In this work, a detailed system description is presented along with a summary of results from ground performance testing of different test sections in an end-to-end preflight testing campaign.

ISS↗

Final report: Task 4a.2 20% wind scenario assessment of electric grid operational features

Wind integration modeling in electricity generation capacity expansion models is important in that these models are often used to inform political or managerial decisions. Poor representation of wind technology leads to under-estimation of wind's contribution to future energy scenarios which may hamper growth of the industry. The NREL's Wind Energy Deployment System (WinDS) model provides the most detailed representation of geographically disperse renewable resources and the optimization of transmission expansion to access these resources. Because WinDS was selected as the primary modeling tool for the 20% Wind Energy by 2030 study, it is the ideal tool for supplemental studies of the transmission expansion results. However, as the wind industry grows and knowledge related to the wind resource and integration of wind energy into the electric system develops, the WinDS model must be continually improved through additional data and innovative algorithms to capture the primary effects of variable wind generation. The detailed representation of wind technology in the WinDS model can be used to provide improvements to the simplified representation of wind technology in other capacity expansion models. This task did not employ the WinDS model, but builds from it and its results. Task 4a.2 provides an assessment of the electric grid operational features of the 20% Wind scenario and was conducted using power flow models accepted by the utility industry. Tasks 2 provides information regarding the physical flow of electricity on the electric grid which is a critical aspect of infrastructure expansion scenarios. Expanding transmission infrastructure to access remote wind resource in a physically realizable way is essential to achieving 20% wind energy by 2030.

17 WIND ENERGY↗

Microgrid Assisted Design for Remote Areas

In this work, we present a three-stage multiobjective mixed-integer linear programming (MILP) for the optimal expansion planning and operation of isolated multienergy microgrids in remote areas. By selecting the optimal distributed generators (DGs) and energy storage systems (ESSs) mix selection, siting, sizing, and scheduling in the remote microgrid, the proposed model is targeted to minimize the annualized total cost of microgrids while enhancing the performance of the system, i.e., minimizing the voltage deviations and line power loss. To represent the electricity and heat flow between generation resources and various electrical, heating, and cooling loads in the isolated microgrid, linearized power flow, and heat flow constraints are employed in the proposed optimization model. The available capacity of DGs and ESSs are modeled as discrete constants instead of continuous variables for practical purpose. Numerical simulation results on a remote microgrid consisting of DGs, ESSs, and various loads validate the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Guide to Energy Master Planning of High-Performance Districts and Communities

This guide was developed with partners throughout the United States to demonstrate how implementing district-scale high-performance strategies can be successful and scalable approaches to achieving deep energy savings that increase affordability, improve resilience, reduce emissions, and foster economic development. This document serves as a framework for districts, campuses, and communities, illustrating an iterative process of building support for, planning, and implementing high-performance districts by engaging stakeholders, setting aggressive energy goals, completing technical and financial planning, and implementing a high-performance energy master plan. The information in this guide is based on a 3-year U.S. Department of Energy Zero Energy District Accelerator and a range of real-world examples of emerging high-performance districts. It is particularly useful for architects, planners, engineers, local government agencies, and real estate developers in the early phases of planning a district with high-performance or other deep energy goals. For the purposes of this guide, a high-performance district is a multibuilding development that achieves aggressive energy and related goals such as zero energy, carbon neutrality, sustainability, ultra-efficiency, etc. High-performance districts optimize energy efficiency to reduce energy loads and use renewable energy resources to meet the remaining loads whenever possible. The Energy Independence and Security Act of 2007 defines a high-performance building as “a building that integrates and optimizes on a life cycle basis all major high-performance attributes, including energy conservation, environment, safety, security, durability, accessibility, cost-benefit, productivity, sustainability, functionality, and operational considerations.” High-performance districts are collections of such buildings that take advantage of the synergies available when energy consumption and production are considered at a district level rather than one building at a time.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A feasibility study: Selection of a personalized radiotherapy fractionation schedule using spatiotemporal optimization

Purpose: To investigate the impact of using spatiotemporal optimization, i.e., intensity-modulated spatial optimization followed by fractionation schedule optimization, to select the patient-specific fractionation schedule that maximizes the tumor biologically equivalent dose (BED) under dose constraints for multiple organs-at-risk (OARs). Methods: Spatiotemporal optimization was applied to a variety of lung tumors in a phantom geometry using a range of tumor sizes and locations. The optimal fractionation schedule for a patient using the linear-quadratic cell survival model depends on the tumor and OAR sensitivity to fraction size (α/β), the effective tumor doubling time (T{sub d}), and the size and location of tumor target relative to one or more OARs (dose distribution). The authors used a spatiotemporal optimization method to identify the optimal number of fractions N that maximizes the 3D tumor BED distribution for 16 lung phantom cases. The selection of the optimal fractionation schedule used equivalent (30-fraction) OAR constraints for the heart (D{sub mean} ≤ 45 Gy), lungs (D{sub mean} ≤ 20 Gy), cord (D{sub max} ≤ 45 Gy), esophagus (D{sub max} ≤ 63 Gy), and unspecified tissues (D{sub 05} ≤ 60 Gy). To assess plan quality, the authors compared the minimum, mean, maximum, and D{sub 95} of tumor BED, as well as the equivalent uniform dose (EUD) for optimized plans to conventional intensity-modulated radiation therapy plans prescribing 60 Gy in 30 fractions. A sensitivity analysis was performed to assess the effects of T{sub d} (3–100 days), tumor lag-time (T{sub k} = 0–10 days), and the size of tumors on optimal fractionation schedule. Results: Using an α/β ratio of 10 Gy, the average values of tumor max, min, mean BED, and D{sub 95} were up to 19%, 21%, 20%, and 19% larger than those from conventional prescription, depending on T{sub d} and T{sub k} used. Tumor EUD was up to 17% larger than the conventional prescription. For fast proliferating tumors with T{sub d} less than 10 days, there was no significant increase in tumor BED but the treatment course could be shortened without a loss in tumor BED. The improvement in the tumor mean BED was more pronounced with smaller tumors (p-value = 0.08). Conclusions: Spatiotemporal optimization of patient plans has the potential to significantly improve local tumor control (larger BED/EUD) of patients with a favorable geometry, such as smaller tumors with larger distances between the tumor target and nearby OAR. In patients with a less favorable geometry and for fast growing tumors, plans optimized using spatiotemporal optimization and conventional (spatial-only) optimization are equivalent (negligible differences in tumor BED/EUD). However, spatiotemporal optimization yields shorter treatment courses than conventional spatial-only optimization. Personalized, spatiotemporal optimization of treatment schedules can increase patient convenience and help with the efficient allocation of clinical resources. Spatiotemporal optimization can also help identify a subset of patients that might benefit from nonconventional (large dose per fraction) treatments that are ineligible for the current practice of stereotactic body radiation therapy.

60 APPLIED LIFE SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted "active" status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted "inactive" status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans. This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.

54 ENVIRONMENTAL SCIENCES↗

Application of ERTS-1 imagery to state wide land information system in Minnesota

The author has identified the following significant results. To update and refine existing state-wide land resource information systems, the Minnesota State Planning Agency is assessing the feasibility of extracting resource information from ERTS-1 imagery. Work has centered on a comparative analysis of Minnesota Land Management Information System (MLMIS) and ERTS-1 land use classes. The associated problems of determining appropriate data cell size and optimal seasonal timing have also been addressed. Using ERTS-1 images, dominant land use is classified as follows: urban, forest, agriculture, extractive, transportation, water, and wetlands. Preliminary analysis suggests that with appropriate changes in operational definitions these general classes can be further refined for the benefit of MLMIS users. Additional detail appears most feasible extractive classes.

Sizer, J. E.↗

Derivation of Capabilities and Resources for Treating Medical Conditions in Deep Space

BACKGROUND: Medical care in spaceflight requires the adaptation of terrestrial standards to the constraints of the space environment. However, there is often conflict between the ideal resources required for treatment and diagnosis of a medical condition, and the constraints on their mass, volume, data needs, etc. This optimization of trades between medical risk and resources will be a significant challenge for deep space medical system design. METHODS: A team of physicians with a broad range of expertise reviewed the 120 medical conditions on the condition list for NASA’s Informing Mission Planning via analysis of Complex Tradespaces Medical Database (IMPACT-MD). Each team member was assigned a subset of conditions based on their experience and training. The assigned physician generated a proposed list of capabilities, definitions, and resources required to treat each condition based on terrestrial practice guidelines, medical literature, and subject matter expertise. Additional specialists were consulted for conditions where expertise was not present within the main group. The proposed list was then reviewed by the broader team and modified as needed to achieve consensus. Each capability and resource was then assigned parameters to define quantity required per medical event, necessity, training level required, and primacy order of any alternative resources. These capabilities and resources were placed into condition specific tables and delivered to a team of engineers who added mass and volume data for each specific resource and converted the table into a database for use as input to a computational model to simulate spaceflight (IMPACT) DISCUSSION: This process ensures that a minimum of three subject matter experts review and agree upon the scope of practice, medical diagnostic tools, and treatment modalities that would be necessary to address emergent and non-emergent conditions that may arise during spaceflight to inform requirements during the vehicle design phase. The method is scalable to any design reference mission and permits modification of the existing database as information, conditions or experience are added. By including specialists, generalists, and those with subject matter expertise in the spaceflight environment on the team, we ensure that the included capabilities represent a realistic and actionable foundation for planning deep space missions.

D R Levin↗

Proposition to Optimize Fire Stations for Wildfires

The rising trend in wildfire occurrence and severity has put a strain on wildfire management organizations by spreading out limited resources to meet increasing demand. There has been extensive prior research and data collection to determine the areas of highest risk and to predict regional wildfire damages based on historical trends. Our group aims to utilize this data to best determine fire station placement, optimizing where resources are allocated to reduce the time and investment needed to effectively mitigate wildfires. Using existing research, we are able to calculate optimal fire station locations by utilizing a single-objective facility location problem algorithm incentivized for cost reduction. Further work would be needed to refine the algorithm to accommodate for more realistic factors including access to water and roadways as well as better accounting for the costs involved, but our work serves as a proof of concept and lays the foundation for future research. Implementation of this algorithm would allow public fire planning agencies (such as CAL FIRE and Forest Service) to shift resources to where they would be most effective.

Wildfires↗

Microgrid to enable optimal distributed energy retail and end-user demand response

In the face of unprecedented challenges in environmental sustainability and grid resilience, there is an increasingly held consensus regarding the adoption of distributed and renewable energy resources such as microgrids (MGs), and the utilization of flexible electric loads by demand response (DR) to potentially drive a necessary paradigm shift in energy production and consumption patterns. However, the potential value of distributed generation and demand flexibility has not yet been fully realized in the operation of MGs. This study investigates the pricing and operation strategy with DR for a MG retailer in an integrated energy system (IES). Based on co-optimizing retail rates and MG dispatch formulated as a mixed integer quadratic programming (MIQP) problem, our model devises a dynamic pricing scheme that reflects the cost of generation and promotes DR, in tandem with an optimal dispatch plan that exploits spark spread and facilitates the integration of renewables, resulting in improved retailer profits and system stability. Main issues like integrated energy coupling and customer bill reduction are addressed during pricing to ensure rates competitiveness and customer protection. By evaluating on real datasets, the system is demonstrated to optimally coordinate storage, renewables, and combined heat and power (CHP), reduce carbon dioxide emission while maintaining profits, and effectively alleviate the PV curtailment problem. Finally, the model can be used by retailers and MG operators to optimize their operations, as well as regulators to design new utility rates in support of the ongoing transformation of energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radioisotope Science and Technology Division FY 2025 Core R&D Summary Report: Competitive Projects, Postdoctoral Researchers, and Student Interns

R&D efforts in support of the Oak Ridge National Laboratory (ORNL) Isotope Program Radioisotope Portfolio are led by the Radioisotope Science and Technology Division (RSTD). In addition to supporting the ORNL Isotope Program Radioisotope Portfolio, RSTD supports a portfolio of research related to fundamental properties of radioisotopes and radioisotope applications, including diagnostic and therapeutic uses of medical radioisotopes, radioisotopes for national security, and the production of 238 Pu for the National Aeronautics and Space Administration (NASA) and US Department of Energy (DOE) Office of Nuclear Energy. RSTD is organized into functional science and engineering groups, with most staff members supporting multiple programs. The goal of this organization is to enable synergy between programs such that R&D advances coming from other programs may provide benefit to the ORNL Isotope Program. R&D within RSTD is focused around addressing five grand challenges, as documented in the strategic plan for the DOE Office of Isotope R&D and Production, or DOE Isotope Program (IP), Radioisotope Production R&D activities at ORNL: 1. Maximizing the scientific output of radioisotope transmutation resources, 2. Maximizing the scientific output of radioisotope processing resources, 3. Minimizing waste and having optimal waste disposition, 4. Focusing on product quality and reliability, and 5. Expanding the use of beneficial isotopes. The ORNL Core R&D program, one of the primary R&D components within the ORNL Isotope Program Radioisotope Portfolio, ranges from benchtop to demonstration activities, with a focus on researching enhanced production techniques, developing emerging isotopes, and developing the talent pipeline for radioisotope science and technology. Projects within the Core R&D Program are led primarily by RSTD staff members. In supporting enhanced production techniques, the Core R&D program presents an opportunity to fund novel R&D that might not be tied to a specific radioisotope product but still presents a high potential for broad applicability in the longer term. In supporting the development of emerging isotopes, the Core R&D program develops high-priority isotopes that are not able to be fully supported through production funds.

07 ISOTOPE AND RADIATION SOURCES↗

HOMER Economic Models - US Navy

This LETTER REPORT has been prepared by Idaho National Laboratory for US Navy NAVFAC EXWC to support in testing pre-commercial SIREN (Simulated Integration of Renewable Energy Networks) computer software models. In the logistics mode SIREN software simulates the combination of renewable power sources (solar arrays, wind turbines, and energy storage systems) in supplying an electrical demand. NAVFAC EXWC will create SIREN software logistics models of existing or planned renewable energy projects at five Navy locations (San Nicolas Island, AUTEC, New London, & China Lake), and INL will deliver additional HOMER computer models for comparative analysis. In the transient mode SIREN simulates the short time-scale variation of electrical parameters when a power outage or other destabilizing event occurs. In the HOMER model, a variety of inputs are entered such as location coordinates, Generators, PV arrays, Wind Turbines, Batteries, Converters, Grid costs/usage, Solar resources, Wind resources, Temperatures, Fuels, and Electric Loads. HOMER's optimization and sensitivity analysis algorithms then evaluate the economic and technical feasibility of these technology options and account for variations in technology costs, electric load, and energy resource availability. The Navy can then use HOMER’s optimization and sensitivity results to compare to those of the SIREN model. The U.S. Department of Energy (DOE) Idaho National Laboratory (INL) possesses unique expertise and experience in the software, hardware, and systems design for the integration of renewable energy into the electrical grid. NAVFAC EXWC will draw upon this expertise to complete mission requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗