Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Understanding the compound flood risk along the coast of the contiguous United States

Abstract. Compound flooding is a type of flood event caused by multiple flood drivers. The associated risk has usually been assessed using statistics-based analyses or hydrodynamics-based numerical models. This study proposes a compound flood (CF) risk assessment (CFRA) framework for coastal regions in the contiguous United States (CONUS). In this framework, a large-scale river model is coupled with a global ocean reanalysis dataset to (a) evaluate the CF exposure related to the coastal backwater effects on river basins, and (b) generate spatially distributed data for analyzing the CF hazard using a bivariate statistical model of river discharge and storm surge. The two kinds of risk are also combined to achieve a holistic understanding of the continental-scale CF risk. The estimated CF risk shows remarkable inter- and intra-basin variabilities along the CONUS coast with more variabilities in the CF hazard over the US west and Gulf coastal basins. Different risk assessment methods present significantly different patterns in a few key regions such as the San Francisco Bay area, the lower Mississippi River, and Puget Sound. Our results highlight the need to weigh different CF risk measures and avoid using single statistics-based or hydrodynamics-based CFRAs. Uncertainty sources in these CFRAs include the use of gauge observations, which cannot account for the flow physics or resolve the spatial variability of risks, and underestimations of the flood extremes and the dependence of CF drivers in large-scale models, highlighting the importance of understanding the CF risks for developing a more robust CFRA.

54 ENVIRONMENTAL SCIENCES↗

Landscape characterization of peridomestic risk for Lyme disease using satellite imagery

Remotely sensed characterizations of landscape composition were evaluated for Lyme disease exposure risk on 337 residential properties in two communities of suburban Westchester County, New York. Properties were categorized as no, low, or high risk based on seasonally adjusted densities of Ixodes scapularis nymphs, determined by drag sampling during June and July 1990. Spectral indices based on Landsat Thematic Mapper data provided relative measures of vegetation structure and moisture (wetness), as well as vegetation abundance (greenness). A geographic information system (GIS) was used to spatially quantify and relate the remotely sensed landscape variables to risk category. A comparison of the two communities showed that Chappaqua, which had more high-risk properties (P < 0.001), was significantly greener and wetter than Armonk (P < 0.001). Furthermore, within Chappaqua, high-risk properties were significantly greener and wetter than lower-risk properties in this community (P < 0.01). The high-risk properties appeared to contain a greater proportion of broadleaf trees, while lower-risk properties were interpreted as having a greater proportion of nonvegetative cover and/or open lawn. The ability to distinguish these fine scale differences among communities and individual properties illustrates the efficiency of a remote sensing/GIS-based approach for identifying peridomestic risk of Lyme disease over large geographic areas.

Topography, Medical↗

Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

IXPE↗

3D Representation of UAV-obstacle Collision Risk Under Off-nominal Conditions

Safe operations of autonomous unmanned aerial vehicles (UAVs) in low-altitude airspace with beyond visual line-of-sight (BVLOS) flights demand robust risk monitoring of airspace as well as of people and property on ground. One of the safety critical factors for UAV flights is the risk of collision with static and dynamic obstacles in proximity to its flight path. This paper presents a detailed formulation of risk of obstacle collision incorporating the effects of off-nominal conditions introduced by component failures, degraded controllability and environmental disturbances such as wind gusts. The risk is represented in terms of a matrix with rows corresponding to the likelihood of occurrence of collision and columns representing severity of collision to the vehicle and surrounding structures. Risk likelihood is generated using a Bayesian Belief Network (BBN) that compiles knowledge from related Failure Modes and Effects Analysis (FMEAs) and Subject Matter Experts (SMEs) to determine the probability of collision based on on-board sensor measurements indicative of vehicle health and controllability. Risk severity is computed utilizing a point-mass 3D kinematic model of the vehicle in presence of wind. The proposed risk factor is demonstrated on real flight data from experimental flights of an octocopter at NASA Langley Research Center in presence of simulated obstacles and wind conditions. Effect of varying wind conditions, level of controllability and obstacle measurement noise on the risk factor is demonstrated. The proposed approach enables risk-informed decision making for timely mitigation of current and future unsafe events in autonomous systems.

risk analysis↗

Implementing an Objectives-Driven, Risk-Informed, and Case-Assured Approach to Safety and Mission Success at NASA

NASA is developing a “Standard for Assurance of Space Flight Safety and Mission Success” that implements an objectives-driven, risk-informed, and case-assured approach to safety and mission success (S&MS) for NASA space flight programs and projects. The standard aligns with the philosophy of risk leadership that has recently been established in NASA policy to assure acceptable levels of flight crew safety and mission success risk. It is consistent with existing NASA risk management requirements and is compatible with NASA program management and systems engineering requirements. The methodology described in the standard is presented in terms of an S&MS assurance framework that is designed to allow substantial flexibility in the specific means by which programs and projects achieve acceptable mission S&MS risk. Such flexibility is necessary to accommodate the increasingly broad range of acquisition strategies employed by NASA, including commercial transportation services, as well as to accommodate the increasingly rapid evolution of space flight-related technologies and practices. A key feature of the S&MS assurance framework is the specification of S&MS success criteria for each life-cycle review (LCR). The S&MS assurance case is structured around these criteria, the satisfaction of which indicates that the program/project is adhering to the S&MS risk posture. This enables the evolving S&MS assurance case to be used as a fundamental program/project submittal at each LCR, where its inherent structure of argument, supported by evidence, directly supports the evaluation of the program/project with respect to the S&MS success criteria, and by extension, the S&MS risk posture. As such, the S&MS assurance case is integral to program/project systems engineering, risk management, and S&MS oversight activities, and provides the principal basis for S&MS risk acceptance by the Decision Authority throughout the program/project life cycle.

Risk Posture↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Risk‐based, response‐adapted therapy for early‐stage extranodal nasal‐type NK /T‐cell lymphoma in the modern chemotherapy era: A China Lymphoma Collaborative Group study

Abstract We aimed to determine the survival benefits of chemotherapy (CT) added to radiotherapy (RT) in different risk groups of patients with early‐stage extranodal nasal‐type NK/T‐cell lymphoma (ENKTCL), and to investigate the risk of postponing RT based on induction CT responses. A total of 1360 patients who received RT with or without new‐regimen CT from 20 institutions were retrospectively reviewed. The patients had received RT alone, RT followed by CT (RT + CT), or CT followed by RT (CT + RT). The patients were stratified into different risk groups using the nomogram‐revised risk index (NRI). A comparative study was performed using propensity score‐matched (PSM) analysis. Adding new‐regimen CT to RT (vs RT alone) significantly improved overall survival (OS, 73.2% vs 60.9%, P < .001) and progression‐free survival (PFS, 63.5% vs 54.2%, P < .001) for intermediate‐risk/high‐risk patients, but not for low‐risk patients. For intermediate‐risk/high‐risk patients, RT + CT and CT + RT resulted in non‐significantly different OS (77.7% vs 72.4%; P = .290) and PFS (67.1% vs 63.1%; P = .592). For patients with complete response (CR) after induction CT, initiation of RT within or beyond three cycles of CT resulted in similar OS (78.2% vs 81.7%, P = .915) and PFS (68.2% vs 69.9%, P = .519). For patients without CR, early RT resulted in better PFS (63.4% vs 47.6%, P = .019) than late RT. Risk‐based, response‐adapted therapy involving early RT combined with CT is a viable, effective strategy for intermediate‐risk/high‐risk early‐stage patients with ENKTCL in the modern treatment era.

Qi, Shu‐Nan↗

A Method for Evaluating and Tracking Production-Sample Test (PST) Delay Risk

This report describes a method for evaluating risk from delayed Production Sample Testing (PST), and strategies for reducing test backlogs. Risk contributions to overall risk from delayed PST include a Steady State Risk (SSR) contribution that is inherent in the qualified design and manufacturing processes, and a Non-Homogenous Production Risk (NHPR) contribution from production variation. Both definitions and evaluation techniques for these risk contributions are provided along with correlation to the standard Quality Assurance Process, QA001.2, risk ranking matrix. Methods for tracking test backlogs, and reducing backlogs are also discussed. The delayed PST evaluation method described here includes the merger of both slightly quantitative methods for tracking defect levels and the propensity for production variation with general risk management tracking tools like the likelihood vs. consequence risk ranking matrix. This merger is important because it allows more effective evaluation and communication with regards to delayed PST.

42 ENGINEERING↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk management for the Space Exploration Initiative

Probabilistic Risk Assessment (PRA) is a quantitative engineering process that provides the analytic structure and decision-making framework for total programmatic risk management. Ideally, it is initiated in the conceptual design phase and used throughout the program life cycle. Although PRA was developed for assessment of safety, reliability, and availability risk, it has far greater application. Throughout the design phase, PRA can guide trade-off studies among system performance, safety, reliability, cost, and schedule. These studies are based on the assessment of the risk of meeting each parameter goal, with full consideration of the uncertainties. Quantitative trade-off studies are essential, but without full identification, propagation, and display of uncertainties, poor decisions may result. PRA also can focus attention on risk drivers in situations where risk is too high. For example, if safety risk is unacceptable, the PRA prioritizes the risk contributors to guide the use of resources for risk mitigation. PRA is used in the Space Exploration Initiative (SEI) Program. To meet the stringent requirements of the SEI mission, within strict budgetary constraints, the PRA structure supports informed and traceable decision-making. This paper briefly describes the SEI PRA process.

Buchbinder, Ben↗

Kennedy Space Center Coronary Heart Disease Risk Screening Program

The number one cause of death in the U.S. is coronary heart disease (CHD). It is probably a major cause of death and disability in the lives of employees at Kennedy Space Center (KSC) as well. The KSC Biomedical Office used a multifactorial mathematical formula from the Framingham Heart Study to calculate CHD risk probabilities for individuals in a segment of the KSC population that required medical evaluation for job certification. Those assessed to be high-risk probabilities will be targeted for intervention. Every year, several thousand KSC employees require medical evaluations for job related certifications. Most medical information for these evaluations is gathered on-site at one of the KSC or Cape Canaveral Air Station (CCAS) medical clinics. The formula used in the Framingham Heart Study allows calculation of a person's probability of acquiring CHD within 10 years. The formula contains the following variables: Age, Diabetes, Smoking, Left Ventricular Hypertrophy, Blood Pressure (Systolic or Diastolic), Cholesterol, and HDL cholesterol. The formula is also gender specific. It was used to calculate the 10-year probabilities of CHD in KSC employees who required medical evaluations for job certifications during a one-year time frame. This KSC population was profiled and CHD risk reduction interventions could be targeted to those at high risk. Population risk could also be periodically reevaluated to determine the effectiveness of intervention. A 10-year CHD risk probability can be calculated for an individual quite easily while gathering routine medical information. An employee population's CHD risk probability can be profiled graphically revealing high risk segments of the population which can be targeted for risk reduction intervention. The small audience of NASA/contractor physicians, nurses and exercise/fitness professionals at the breakout session received the lecture very well. Approximately one third indicated by a show of hands that they would be interested in implementing a similar program at their NASA Center. Questions were asked pertaining to standardization for age, the validity of using the idealized male values also for the female population, and indications of the screening test's sensitivity and specificity.

Tipton, David A.↗

Continuous Risk Management at NASA

NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

Hammer, Theodore F.↗

Multiple Changes to Reusable Solid Rocket Motors, Identifying Hidden Risks

The Space Shuttle Reusable Solid Rocket Motor (RSRM) baseline is subject to various changes. Changes are necessary due to safety and quality improvements, environmental considerations, vendor changes, obsolescence issues, etc. The RSRM program has a goal to test changes on full-scale static test motors prior to flight due to the unique RSRM operating environment. Each static test motor incorporates several significant changes and numerous minor changes. Flight motors often implement multiple changes simultaneously. While each change is individually verified and assessed, the potential for changes to interact constitutes additional hidden risk. Mitigating this risk depends upon identification of potential interactions. Therefore, the ATK Thiokol Propulsion System Safety organization initiated the use of a risk interaction matrix to identify potential interactions that compound risk. Identifying risk interactions supports flight and test motor decisions. Uncovering hidden risks of a full-scale static test motor gives a broader perspective of the changes being tested. This broader perspective compels the program to focus on solutions for implementing RSRM changes with minimal/mitigated risk. This paper discusses use of a change risk interaction matrix to identify test challenges and uncover hidden risks to the RSRM program.

Greenhalgh, Phillip O.↗

An Extensible Information Grid for Risk Management

This paper describes recent work on developing an extensible information grid for risk management at NASA - a RISK INFORMATION GRID. This grid is being developed by integrating information grid technology with risk management processes for a variety of risk related applications. To date, RISK GRID applications are being developed for three main NASA processes: risk management - a closed-loop iterative process for explicit risk management, program/project management - a proactive process that includes risk management, and mishap management - a feedback loop for learning from historical risks that escaped other processes. This is enabled through an architecture involving an extensible database, structuring information with XML, schemaless mapping of XML, and secure server-mediated communication using standard protocols.

Maluf, David A.↗

Radiation Risk Assessment of the Individual Astronaut: A Complement to Radiation Interests at the NIH

Predicting human risks following exposure to space radiation is uncertain in part because of unpredictable distribution of high-LET and low-dose-derived damage amongst cells in tissues, unknown synergistic effects of microgravity upon gene- and protein-expression, and inadequately modeled processing of radiation-induced damage within cells to produce rare and late-appearing malignant cancers. Furthermore, estimation of risks of radiogenic outcome within small numbers of astronauts is not possible using classic epidemiologic study. It therefore seems useful to develop strategies of risk-assessment based upon large datasets acquired from correlated biological models useful for resolving radiogenic risk-assessment for irradiated individuals. In this regard, it is suggested that sensitive cellular biodosimeters that simultaneously report 1) the quantity of absorbed dose after exposure to ionizing radiation, 2) the quality of radiation delivering that dose, and 3) the biomolecular risk of malignant transformation be developed in order to resolve these NASA-specific challenges. Multiparametric cellular biodosimeters could be developed using analyses of gene-expression and protein-expression whereby large datasets of cellular response to radiation-induced damage are analyzed for markers predictive for acute response as well as cancer-risk. A new paradigm is accordingly addressed wherein genomic and proteomic datasets are registered and interrogated in order to provide statistically significant dose-dependent risk estimation in individual astronauts. This evaluation of the individual for assessment of radiogenic outcomes connects to NIH program in that such a paradigm also supports assignment of a given patient to a specific therapy, the diagnosis of response of that patient to therapy, and the prediction of risks accumulated by that patient during therapy - such as risks incurred by scatter and neutrons produced during high-energy Intensity-Modulated Radiation Therapy. Value of assessment of radiogenic outcome for individuals exposed to radiation is suggested to be common to both NASA and NIH.

Richmond, Robert C.↗

Bridging the Divide between Safety and Risk Management for your Project or Program

This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

Lutomski, Mike↗

Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks

Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.

Brown, Richard Lee↗