Search NASA⌕ Search

SEARCH · Search NASA

Results for “roads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Roads to and from the RNA World

The historical existence of the RNA world, in which early life used RNA for both genetic information and catalytic ability, is widely accepted. However, there has been little discussion of whether protein synthesis arose before DNA or what preceded the RNA world (i.e. the pre-RNA world). We outline arguments of what route life may have taken out of the RNA world: whether DNA or protein followed. The metabolic arguments favor the possibility that RNA genomes preceded the use of DNA as the informational macromolecule. However, the opposite can also be argued based on the enhanced stability, reactivity, and solubility of 2-deoxyribose as compared to ribose. The possibility that DNA may have come before RNA is discussed, although it is a less parsimonious explanation than DNA following RNA.

Dworkin, Jason P.↗

Creating Communications, Computing, and Networking Technology Development Road Maps for Future NASA Human and Robotic Missions

For human and robotic exploration missions in the Vision for Exploration, roadmaps are needed for capability development and investments based on advanced technology developments. A roadmap development process was undertaken for the needed communications, and networking capabilities and technologies for the future human and robotics missions. The underlying processes are derived from work carried out during development of the future space communications architecture, an d NASA's Space Architect Office (SAO) defined formats and structures for accumulating data. Interrelationships were established among emerging requirements, the capability analysis and technology status, and performance data. After developing an architectural communications and networking framework structured around the assumed needs for human and robotic exploration, in the vicinity of Earth, Moon, along the path to Mars, and in the vicinity of Mars, information was gathered from expert participants. This information was used to identify the capabilities expected from the new infrastructure and the technological gaps in the way of obtaining them. We define realistic, long-term space communication architectures based on emerging needs and translate the needs into interfaces, functions, and computer processing that will be required. In developing our roadmapping process, we defined requirements for achieving end-to-end activities that will be carried out by future NASA human and robotic missions. This paper describes: 10 the architectural framework developed for analysis; 2) our approach to gathering and analyzing data from NASA, industry, and academia; 3) an outline of the technology research to be done, including milestones for technology research and demonstrations with timelines; and 4) the technology roadmaps themselves.

Bhasin, Kul↗

The Space Cube Architecture -- A Road Map for the Future

Concepts of using modular computer system processing units using today's technology are described. Topics covered are: reasons for modularizing, reasons for stacking modules, module packaging & inter- module packaging, interconnection between modules, space-bus require- ments, gateway features, general architecture, single string and dual string architecture (and examples), and triple module redundancy.

space cube architecture modular computer system pr↗

The Mars Exploration Rovers : hitting the road on Mars

Since the beginning of time, people have been fascinated by Mars. From the earliest mission to now-Mars has been (and is) a challenging destination. The Rovers were developed at a breakneck pace in 3 years and landed successfully on Mars in January 2004. This paper will discuss how the Mars Rover mission fits into the overall Mars Program and NASA's program of planetary exploration. Building the rovers in such a short time period created some difficult design challenges that were mainly schedule driven. in addition, it will cover the process of selecting the rover landing sites as well as the engineering challenges faced in the entry, descent and landing process. The rovers have a great deal of autonomous control ability on the surface and the process of developing and testing those was part of the challenge of doing this in 3 years.

training↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

The X-43A Flight Research Program: Lessons Learned on the Road to Mach 10

During an aerospace engineer's undergraduate studies, he or she will attend classes in aerodynamics, thermodynamics, structures, stability and control, dynamics, design, propulsion, and computer science, along with the related courses in mathematics, physics, statistics, and chemistry required to understand the material. Upon graduation, the new engineer will have acquired a basic knowledge of how to build an aerospace vehicle. What only comes through experience, however, is the understanding of the inevitable imperfect process through which an aerospace vehicle is built. This is the adventure of turning a basic concept into functional hardware. Engineers working on a project must often deal with ambiguous situations. They are routinely asked by management to provide risk assessments of a project, yet even after careful analysis uncertainties remain. The project must be accomplished within finite limits of time and money. The question an engineer answers is whether the solution to potential problem is worth the cost and schedule delay, or if the solution might actually be worse than the problem it is meant to solve. Review protocols are established to ensure that an unknown has not been overlooked. But these cannot protect against an unknown unknown. Examples of these situations can be found in the history of the X-43A Hyper-X (Hypersonic Experiment) program. In this NASA project, a supersonic combustion ramjet (scramjet) engine was flight tested on a subscale vehicle. The X-43A Hyper-X Research Vehicle (HXRV) was launched from a B-52B mothership, then boosted to the test speed by a modified Pegasus rocket first stage, called the Hyper-X Launch Vehicle (HXLV). Once at the proper speed and altitude, the X-43A separated from the booster, stabilized itself, and then the engine test began. Although wind-tunnel scramjet engine tests had begun in the late 1950s, before the Hyper-X program there had never been an actual in-flight test of such an engine integrated with an appropriate airframe. Thus, while the scramjet had successfully operated in the artificial airflow of wind tunnels, the concept had yet to be proven in real air. These conditions meant changes in density and temperature, as well as changes in angle of attack and sideslip of a free-flying vehicle. A wind tunnel is limited in its ability to simulate these subtle factures, which have a major impact on almost any vehicle, but especially that of a scramjet's performance. The Hyper-X project was to provide a real-world benchmark of the ground test data. The full scale X-43A engine would be operated in the wind tunnel, and then flown, and the data from its operation would then be compared with projections. If these matched, the wind tunnel data would be considered a reliable design tool for future scramjet. If there were significant differences, the reasons for these would have to be identified. Until such information was available, scramjets would lack the technological maturity to be considered for future space launch or high-speed atmospheric flight vehicles.

Peebles, Curtis↗

The Road to Mach 10: A History of the X-43A Hypersonic Flight Test Program at NASA Dryden -- Origins to First Flight

The NASA Dryden Flight Research Center, in partnership with the NASA Langley Research Center and industrial contractors, conducted the first flight tests of a supersonic combustion ramjet (scramjet) in 2004. This was a revolutionary airbreathing engine able to operate at speeds above Mach 5, which carries potential for both high-speed atmospheric flight and as a space launcher. For the Dryden engineers, the X-43 program was the culmination of a nearly 60-year history of flight research, going back to the early days of supersonic flight, and to rocket planes such as the X-1, D-558-II Skyrocket, and the X-15. For the propulsion community, it marked a turning point in a quest that had taken nearly as long. The scramjet engine did not arise from the work of a single individual or from a single technological breakthrough. It evolved instead from work under way on ramjets in the early 1950s, and from research programs at the National Advisory Committee for Aeronautics (NACA) Lewis Research Center, at the U.S. Army Aberdeen Proving Ground, and by the U.S. Navy. Studies developed in the course of these disparate projects raised the possibility of supersonic combustion. Many researchers had considered the notion impractical due to the difficulty of stabilizing a flame front in a supersonic airflow. NACA researchers at Lewis attempted to test the idea's feasibility by burning aluminum borohydride in a supersonic wind tunnel. Sustained burning was believed to have been observed at Mach 1.5, Mach 2, and Mach 3 for as long as two seconds.

Peebles, Curtis↗

The Road to Mach 10: A History of the X-43A Hypersonic Flight Test Program at NASA Dryden...Toward the Future

In terms of technology, the X-43A/Hyper-X represented a singular milestone. After nearly a half century of high hopes, studies, wind tunnel tests, proposals, and canceled projects, a scramjet-powered vehicle had flown. The performance of the engine qualified the scramjet design tools and scaling laws. In turn, the theoretical calculations and ground testing could be used to design more advanced engine concepts. Just as important, both the scramjet and vehicle systems had successfully operated in the variable temperatures and densities of the atmosphere. The X-43A systems were able to maintain the exact flight conditions necessary for the scramjet to operate properly. Control deflections to correct the engine-induced moments were close to pre-flight predictions. When the unexpected occurred, such as when the vehicle pitched up during the cowl opening on the second flight, the control system was sufficiently designed to correct the situation. The airframe and wing structure, the thermal protection material, and the internal conditions of the X-43A performed largely as predicted. The HXLV thermal anomaly during the ascent on the third flight and "the Mach 8 unpleasantness" during the descent indicated that the HXLV and X-43A were not as resilient to aerodynamic heating as expected. The X-43A 's airframe drag and lift both were slightly higher than predicted, but still within preflight uncertainty predictions. The stability and control were as predicted, as was the boundary layer transition. The biggest aerodynamic worry before the flight was the separation of the HXLV and the X- 43A. After all was said and done, this went exactly as predicted, proving that non-symmetrical/high-dynamic pressure stage separations could be performed. This in turn meant that two-stage-to-orbit vehicles employing this technology were feasible. The Hyper-X program also served as a training ground for a new generation of scramjet and hypersonic researchers. This included both NASA and contractor personnel, providing them with experience in ground testing and component development; vehicle design, construction, integration, system checkout, and, ultimately, flight testing and data analysis. Additionally, researchers learned the practical details of running a project within finite budget and time limits, about the ambiguousness of risk assessment, and about the need to spend a significant amount of time and effort dealing with engineering problems, such as those with the FAS, that have nothing to do with the project's research goals. Finally, all those who worked on the X-43A project now know what it is like to spend years transforming an idea into a functional vehicle, only for it to be lost in a matter of seconds. And then to go through years of work to correct the problems, to face the possibility that still more might exist, and finally to savor the triumph of two successful flights. For those who will work on the hypersonic projects that emerge in coming years, these experiences may prove to be the most valuable of all.

Peebles, Curtis↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

The Road to Launch and Operations of the Spitzer Space Telescope

This paper describes how the project was able to overcome these stumbling blocks along with changes in philosophies, experiences, and lessons learned. It will describe how projects must invest early or else heavily later in the development phase to achieve a successful operations phase. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout/Science Verification phase and a subsequent successful operational phase.

Spitzer↗

Draft Forecasts from Real-Time Runs of Physics-Based Models - A Road to the Future

The Community Coordinated Modeling Center (CCMC) is a US inter-agency activity aiming at research in support of the generation of advanced space weather models. As one of its main functions, the CCMC provides to researchers the use of space science models, even if they are not model owners themselves. The second focus of CCMC activities is on validation and verification of space weather models, and on the transition of appropriate models to space weather forecast centers. As part of the latter activity, the CCMC develops real-time simulation systems that stress models through routine execution. A by-product of these real-time calculations is the ability to derive model products, which may be useful for space weather operators. After consultations with NOAA/SEC and with AFWA, CCMC has developed a set of tools as a first step to make real-time model output useful to forecast centers. In this presentation, we will discuss the motivation for this activity, the actions taken so far, and options for future tools from model output.

Hesse, Michael↗

The Road to Launch and Operations of the Spitzer Space Telescope

Spitzer Space Telescope, the fourth and final of NASA's Great Observatories, and the cornerstone to NASA's Origins Program, launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Spitzer has an 85cm diameter beryllium telescope, which operates near absolute zero utilizing a liquid helium cryostat for cooling the telescope. The helium cryostat, though designed for a 2.5 year lifetime, through creative planning now has an expected lifetime of 5.5 years. Spitzer has completed its in-orbit checkout/science verification phases and the first two years of nominal operations, becoming the first mission to execute astronomical observations from a solar orbit. Spitzer was designed to probe and explore the universe in the infrared utilizing three state of the art detector arrays providing imaging, photometry, and spectroscopy over the 3-160 micron wavelength range...

infrared↗

The Road to NASA

This slide presentation describes the career path and projects that the author worked on during her internship at NASA. As a Graduate Student Research Program (GSRP) participant the assignments that were given include: Human Mesenchymal Stem Cell Research, Spaceflight toxicology, Lunar Airborne Dust Toxicity Advisory Group (LADTAG) and a special study at Devon Island.

Meyers, Valerie↗

Taking the Evolutionary Road to Developing an In-House Cost Estimate

This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

Jacintho, David↗