Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Applications Study of Aero-Maneuvering Orbit-to-Orbit Shuttle (AMOOS), Executive Summary

Preliminary designs and the supporting analysis for both the Aeromaneuvering Orbit-to-Orbit Shuttle (AMOOS) and the Aeromaneuvering Recovery System (AMRS) are presented. The AMOOS design is shown to yield from twice to almost three times the high energy, round-trip payloads as a purely propulsive vehicle of the same weight. Typically AMOOS can perform a crew rotation mission to equatorial geosynchronous orbit in one space shuttle launch. The flight test program analysis modeled parameters such as maximum dynamic pressure, heating rates, guidance, stability and recovery. Two model flight schedules were developed, one consisting of four flights and the other of two flights. The former is considered a very low risk, high information return program whereas the latter is a minimal cost program consistent with reasonable data returns and chance of success. The AMOOS and AMRS guidance scheme developed using linear regulator theory proved a precise and accurate guidance scheme. Both it and a classical linear system's based scheme were evaluated using 65 simulated trajectories in which the position in the entry corridor and the atmospheric density were varied randomly.

White, J.↗

Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

Source record↗

Orbit transfer vehicle engine study, phase A extension. Volume 2A: Study results

Engine trade studies and systems analyses leading to a baseline engine selection for advanced expander cycle engine are discussed with emphasis on: (1) performance optimization of advanced expander cycle engines in the 10 to 20K pound thrust range; (2) selection of a recommended advanced expander engine configuration based on maximized performance and minimized mission risk, and definition of the components for this configuration; (3) characterization of the low thrust adaptation requirements and performance for the staged combustion engine; (4) generation of a suggested safety and reliability approach for OTV engines independent of engine cycle; (5) definition of program risk relationships between expander and staged combustion cycle engines; and (6) development of schedules and costs for the DDT&E, production, and operation phases of the 10K pound thrust expander engine program.

Source record↗

Timeline Resource Analysis Program (TRAP): User's manual and program document

The Timeline Resource Analysis Program (TRAP), developed for scheduling and timelining problems, is described. Given an activity network, TRAP generates timeline plots, resource histograms, and tabular summaries of the network, schedules, and resource levels. It is written in ANSI FORTRAN for the Honeywell SIGMA 5 computer and operates in the interactive mode using the TEKTRONIX 4014-1 graphics terminal. The input network file may be a standard SIGMA 5 file or one generated using the Interactive Graphics Design System. The timeline plots can be displayed in two orderings: according to the sequence in which the tasks were read on input, and a waterfall sequence in which the tasks are ordered by start time. The input order is especially meaningful when the network consists of several interacting subnetworks. The waterfall sequence is helpful in assessing the project status at any point in time.

Sessler, J. G.↗

Float Zone Workshop, introduction

The purposes of the float zone working group are summarized. Present and proposed U.S. and European research programs are listed, and power needs for float zoning surveyed. A 1981 to 1991 schedule for development efforts is presented.

Kern, E. L.↗

Hot Microfissuring in Nickel Alloy

Experiments in intergranular cracking of nickel alloy near solidus temperature discussed in contractor report. Purpose of investigation development of schedule for welding, casting, forging, or other processing of alloy without causing microfissuring.

Thompson, R. G.↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗

The formation of stellar systems from interstellar molecular clouds

The observational and theoretical study of regions of continuing star formation promises greater insight into the physical conditions and events associated with the formation of the solar system, and elucidates the role played by star formation in the evolutionary cycle which seems to dominate interstellar material's processing by successive generations of stars in the spiral galaxies. Novel astronomical methods incorporated by the new facilities scheduled for development in the 1980s may yield substantial advancements in star formation process theory; most significant among these efforts will be the identification and examination of the elusive protostellar collapse phase of both star and planetary system formation.

Gehrz, R. D.↗

Expert systems development and application

Current research in the application of expert systems to problems in the flight research environment is discussed. In what is anticipated to be a broad research area, a real time expert system flight status monitor has been identified as the initial project. This real time expert system flight status monitor is described in terms of concept, application, development, and schedule.

Duke, E. L.↗

Study of onboard expert systems to augment space shuttle and space station autonomy

The feasibility of onboard crew activity planning was examined. The use of expert systems technology to aid crewmembers in locating stowed equipment was also investigated. The crew activity planning problem, along with a summary of past and current research efforts, was discussed in detail. The requirements and specifications used to develop the crew activity planning system was also defined. The guidelines used to create, develop, and operate the MFIVE Crew Scheduler and Logistics Clerk were discussed. Also discussed is the mathematical algorithm, used by the MFIVE Scheduler, which was developed to aid in optimal crew activity planning.

Kurtzman, C. R.↗

Prototype resupply scheduler

Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

Tanner, Steve↗

ACTS - The first step toward a switchboard in the sky

The Advanced Communications Technology Satellite (ACTS), now under development and scheduled for launch in May 1992, is presently the main focus of NASA's communications program. Key technologies for ACTS include electronically hopping spot beam antennas, on-board processing and circuit switching, and Ka-band transmission.

Naderi, F. Michael↗

Get-Away tether experiment - Experimental plans

The experimental capabilities of the Get-Away Tether Experiment (GATE) are presented and a series of demonstration mission are proposed. The GATE is a free-flying tether system that will develop or demonstrate technology in the areas of tether dynamics (deployment and stabilization, retrieval, stationkeeping, and severance), tether electrodynamics, micrometeor hazards to tethers, and disturbance rejection. The system consists of two subsatellites connected by 1 km of tether. The free-flying system is ejected from the Orbiter via a Getaway Special (GAS) canister. Two dynamics missions are profiled along with a description of electrodynamic mission capabilities. The dynamic interactions of the end body and tether may be observed from the Orbiter or from an on-board video tracking system. Hence, GATE provides a unique, low cost capability to demonstrate various tether technologies, and address critical design and safety issues associated with future tether applications. An assessment of the significant measurable parameters and associated instrumentation is given. Future work and system development projection schedules are also outlined.

Greene, Michael↗

Software design with fuzzy requirements (A case study)

The author describes the resource allocation and planning helper (RALPH) scheduling system developed at NASA's Jet Propulsion Laboratory. RALPH addresses the concerns of designing software systems to minimize the need to recode for changes and upgrades; this concern is acute when requirements are uncertain or changing. Determining requirements, understanding the problem, designing for change, and tradeoffs are also discussed.

Werntz, David G.↗

Knowledge representation into Ada parallel processing

The Knowledge Representation into Ada Parallel Processing project is a joint NASA and Air Force funded project to demonstrate the execution of intelligent systems in Ada on the Charles Stark Draper Laboratory fault-tolerant parallel processor (FTPP). Two applications were demonstrated - a portion of the adaptive tactical navigator and a real time controller. Both systems are implemented as Activation Framework Objects on the Activation Framework intelligent scheduling mechanism developed by Worcester Polytechnic Institute. The implementations, results of performance analyses showing speedup due to parallelism and initial efficiency improvements are detailed and further areas for performance improvements are suggested.

Masotto, Tom↗

Launch site integration for mixed fleet operations

Launch site impacts and integration planning issues are presented to support launch operations for a mixed vehicle fleet (manned and cargo). Proposed ground systems and launch site configurations are described. Prelaunch processing scenarios and schedules are developed for candidate launch vehicles. Earth-to-orbit (ETO) vehicle architectures are presented to meet future launch requirements, including the Space Exploration Initiative (SEI). Flight vehicle design recommendations to enhance launch processing are discussed. The significance of operational designs for future launch vehicles is shown to be a critical factor in planning for mixed fleet launch site operations.

Scott, L. P.↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

The Impact of Information Technology on the Design, Development, and Implementation of a Lunar Exploration Mission

From the beginning to the present expeditions to the Moon have involved a large investment of human labor. This has been true for all aspects of the process, from the initial design of the mission, whether scientific or technological, through the development of the instruments and the spacecraft, to the flight and operational phases. In addition to the time constraints that this situation imposes, there is also a significant cost associated with the large labor costs. As a result lunar expeditions have been limited to a few robotic missions and the manned Apollo program missions of the 1970s. With the rapid rise of the new information technologies, new paradigms are emerging that promise to greatly reduce both the time and cost of such missions. With the rapidly increasing capabilities of computer hardware and software systems, as well as networks and communication systems, a new balance of work is being developed between the human and the machine system. This new balance holds the promise of greatly increased exploration capability, along with dramatically reduced design, development, and operating costs. These new information technologies, utilizing knowledge-based software and very highspeed computer systems, will provide new design and development tools, scheduling mechanisms, and vehicle and system health monitoring capabilities that have hitherto been unavailable to the mission and spacecraft designer and the system operator. This paper will utilize typical lunar missions, both robotic and crewed, as a basis to describe and illustrate how these new information system technologies could be applied to all aspects such missions. In particular, new system design tradeoff tools will be described along with technologies that will allow a very much greater degree of autonomy of exploration vehicles than has heretofore been possible. In addition, new information technologies that will significantly reduce the human operational requirements will be discussed.

Gross, Anthony R.↗