Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Performance Assessment for the E-Area Low Level Radioactive Waste Disposal Facility at the Savannah River Site: Chapter 1

This report documents the revised Performance Assessment (PA) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the United States (U.S.) Department of Energy (DOE) Savannah River Site (SRS). A PA analysis is required for DOE-operated facilities that dispose of low-level radioactive waste. PA analyses simulate (1) the release of radionuclides from the disposal site after facility closure, (2) transport of those contaminants through the environment, and (3) exposure/impacts to potential receptors. The purpose of the PA analysis is to demonstrate that the facility is operated in a manner that ensures long-term environmental protection after facility closure, thereby providing for the protection of public health and safety in limiting doses to a hypothetical member of the public (MOP) or an inadvertent human intruder (IHI). DOE Manual (M) 435.1-1, Chg. 3, Radioactive Waste Management (U.S. DOE, 2021b) establishes quantitative post-closure environmental impact limits and requires a facility-specific PA analysis to demonstrate compliance with these limits for DOE low-level waste (LLW) disposed of after September 26, 1988. These limits are defined in terms of human health (e.g., dose limits) with respect to radioactive constituents in the waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wabash CarbonSAFE. Final Report

This document summarizes work detailed in separate Wabash CarbonSAFE reports; the report describes the data collection efforts of the project and consolidates the geologic characterization, well testing, and storage complex modeling results for the Mt. Simon Sandstone and Potosi Dolomite, two distinct reservoirs characterized at the Wabash CarbonSAFE project site. Also presented are summaries of work to characterize the CO 2 source and infrastructure network, as well as summaries of reports analyzing stakeholder engagement options, policy, regulatory and legal considerations, and risk assessment associated with the Wabash CarbonSAFE project site. The report then presents recommendations for the next steps for site characterization, identifies data gaps for future activities, and provides an overall assessment of site potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Files and scripts to support manuscript Needham et al. Canopy Gradients of Respiration

This dataset includes the parameter files, relevant output files, and scripts to perform analysis with Jupyter notebooks that support the manuscript Needham et al 2025 “Canopy Gradients of Respiration Drive Plant Carbon Budgets and Leaf Area Index.” We add functionality to the Functionally Assembled Terrestrial Ecosystem Simulator (FATES) to allow flexible vertical gradients of leaf maintenance respiration (Rdark) and maximum carboxylation rate (Vcmax) through the canopy. We test the sensitivity of FATES to canopy gradients in Rdark, both in global simulations to assess broad scale impacts on leaf area index (LAI) and vegetation carbon, and in single site simulations where we assess impacts on plant functional type (PFT) competitive dynamics. Parameter files are netcdf files that can be converted to human readable .cdl files using NCO tools. Analysis scripts are Jupyter notebook files. These can be opened and run using the open source Jupyter notebook software. Model outputs are netcdf files.

54 ENVIRONMENTAL SCIENCES↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physics-informed machine learning for fault-leakage reduced-order modeling

Geologic carbon storage (GCS) is a promising technology for mitigating CO 2 emissions. The overall success of GCS depends on safe operations that are informed by risk assessment and have proper mitigation plans in place. Performing quantitative probabilistic risk assessment for a GCS site using traditional reservoir simulators can be challenging due to the high computational costs. To overcome this challenge, the US Department of Energy’s National Risk Assessment Partnership (NRAP) project has developed an integrated assessment modeling approach that utilizes computationally efficient reduced-order models (ROM) for simulating various parts of a GCS storage site to quantify uncertainty. Here, in this study, we develop a reduced-order model for fault leakage risk assessment. We use a deep learning approach to build the reduced-order model. We perform a sensitivity analysis and find that the deep learning model yields high accuracy with a much smaller computational cost than full-physics simulation. We also evaluate the performance of the model in scenarios where simulations are not possible to run, providing analysis not previously performed in fault-leakage ROM analyses. Based on a sensitivity analysis of the model, we suggest a simplified conceptual model for fault leakage and site monitoring.

58 GEOSCIENCES↗

2023 Central Hanford Ecological Integrity Assessments Monitoring Report

The Hanford Site is comprised of an expanse of shrub-steppe habitats that provides exceptional ecological value to plants and animals located on the site and in the surrounding greater Columbia Basin. The U.S. Department of Energy (DOE)-managed portion of the Hanford Site, referred to from here on as Central Hanford, has been the focus of various ecological monitoring efforts, including vegetation monitoring. The scope and goals of vegetation surveys have varied greatly since the Hanford Site was established, but previous studies have documented a rapidly changing landscape, making it clear that continued vegetation monitoring is integral to preserving the ecological value of Central Hanford. A new vegetation monitoring effort was initiated in 2023 using methods based on ecological integrity assessments (EIA) (Natural Heritage Report [NHR] 2020-05) developed by the Washington Natural Heritage Program (WNHP), a division of the Washington State Department of Natural Resources (DNR) and NatureServe®. The methods were modified and supplemented to meet monitoring goals at the Hanford Site. The 2023 EIA monitoring effort consisted of field surveys to evaluate vegetation and soil condition across Central Hanford. Surveys were focused on upland habitats, and areas under consideration for upcoming projects were prioritized. Vegetation cover estimates were used to score a variety of metrics for vegetation conditions in each area. In 2023, approximately half of the site was surveyed. Monitoring methods and results for the 2023 field season are summarized in this report, and management recommendations are also provided.

54 ENVIRONMENTAL SCIENCES↗

The Joint Agency Commercial Imagery Evaluation (JACIE) Team: Overview and IKONOS Joint Characterization Approach

An overview of the Joint Agency Commercial Imagery Evalation (JACIE) team is presented. JACIE, composed of the National Aeronautics and Space Administration (NASA), the National Imagery and Mapping Agency (NIMA), and the U.S. Geological Survey (USGS), was formed to leverage government agencies' capabilities for the characterization of commercial remote sensing data. Each JACIE agency purchases, or plans to purchase, commercial imagery to support its research and applications. It is critical that the data be assessed for its accuracy and utility. Through JACIE, NASA, NIMA, and USGS jointly characterized image products from Space Imaging's IKONOS satellite. Each JACIE agency performed an aspect of the characterization based on its expertise. NASA and its university partners performed a system characterization focusing on radiometric calibration, geopositional accuracy, and spatial resolution assessment; NIMA performed image interpretability and feature extraction evaluations; and USGS assessed geopositional accuracy of several IKONOS products. The JACIE team purchased IKONOS imagery of several study sites to perform the assessments and presented results at an industry-government workshop. Future plans for JACIE include the characterization of DigitalGlobe's QuickBird-2 image products.

Zanoni, Vicki↗

Influence of Observed Diurnal Cycles of Aerosol Optical Depth on Aerosol Direct Radiative Effect

The diurnal variability of aerosol optical depth (AOD) can be significant, depending on location and dominant aerosol type. However, these diurnal cycles have rarely been taken into account in measurement-based estimates of aerosol direct radiative forcing (ADRF) or aerosol direct radiative effect (ADRE). The objective of our study was to estimate the influence of diurnal aerosol variability at the top of the atmosphere ADRE estimates. By including all the possible AERONET sites, we wanted to assess the influence on global ADRE estimates. While focusing also in more detail on some selected sites of strongest impact, our goal was to also see the possible impact regionally.We calculated ADRE with different assumptions about the daily AOD variability: taking the observed daily AOD cycle into account and assuming diurnally constant AOD. Moreover, we estimated the corresponding differences in ADREs, if the single AOD value for the daily mean was taken from the the Moderate Resolution Imaging Spectroradiometer (MODIS) Terra or Aqua overpass times, instead of accounting for the true observed daily variability. The mean impact of diurnal AOD variability on 24 h ADRE estimates, averaged over all AERONET sites, was rather small and it was relatively small even for the cases when AOD was chosen to correspond to the Terra or Aqua overpass time. This was true on average over all AERONET sites, while clearly there can be much stronger impact in individual sites. Examples of some selected sites demonstrated that the strongest observed AOD variability (the strongest morning afternoon contrast) does not typically result in a significant impact on 24 h ADRE. In those cases, the morning and afternoon AOD patterns are opposite and thus the impact on 24 h ADRE, when integrated over all solar zenith angles, is reduced. The most significant effect on daily ADRE was induced by AOD cycles with either maximum or minimum AOD close to local noon. In these cases, the impact on 24 h ADRE was typically around 0.1-0.2W/sq m (both positive and negative) in absolute values, 5-10% in relative ones.

optical depth↗

Delaware Ecological Forecasting: Assessing Land Cover and Soil to Identify Suitable Sites for Tidal Marsh Migration in Delaware

Tidal wetlands provide vital resources for the state of Delaware, crucial not only for maintaining important ecosystem functions, but also for providing human populations with substantial services. Healthy wetland networks offer protection from severe weather, reduce flooding, improve water quality, and provide opportunities for education and recreation. However, human activities in combination with natural events, continue to cause substantial loss of wetland cover and damage wetland health. Over the last thirty years, the state of Delaware has experienced a net loss of roughly 5,000 acres of wetland. In collaboration with the Delaware Department of Natural Resources and Environmental Control (DNREC), the team used NASA Earth observations including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and Global Precipitation Measurement Integrated Multi-Satellite Retrievals (GPM IMERG) to develop a methodology to monitor recent changes in wetland cover and forecast landward marsh migration due to sea-level rise, changes to climate, and human development. Trend analysis of current and past climate conditions in precipitation and temperature revealed an overall increase in both metrics. Using Land Change Modeler in TerrSet and Suitability Modeler in ArcGIS Pro, the team visualized landcover shifts over the last 20 years, indicating a general pattern of net wetland loss and identified locations where marsh migration could potentially occur in the future. These observations will enable better planning for restoration activities and in form decision-making to preserve wetland health and ecosystem functions.

McKenna Brahler↗

REopt Lite Overview & Training Exercise

This training exercise provides users with an introduction to and hands-on, interactive exploration of REopt Lite's capabilities. REopt Lite is a free, publicly available techno-economic optimization web tool for distributed energy systems, developed at the National Renewable Energy Laboratory (NREL). REopt Lite helps organizations evaluate the economic viability of grid-connected solar photovoltaics (PV), wind turbines, and battery storage; identify system sizes and battery dispatch strategies to minimize energy costs; and estimate how long a system can sustain critical load during a grid outage. The model is formulated as a mixed-integer linear program based in an underlying application programming interface (API) that is also free and publicly available. This training activity is structured as a group exercise. Participants split into eight groups and each group is assigned a different hypothetical site to model and assess the opportunity for solar PV + battery storage. Groups work together to develop results for their site and then re-convene to compare and discuss results, inputs/drivers of the analysis, and other factors impacting the decision-making process for behind-the-meter solar PV and battery storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of Warm and Dry Bias over ARM SGP Site in E3SMv2 and E3SM-MMF

Abstract Many climate models exhibit a dry and warm bias over the central United States during the summer months, including the Energy Exascale Earth System Model (E3SM) and its Multiscale Modeling Framework (MMF) configuration. Understanding the causes of this bias is important to shine a light on this common model error and reduce the uncertainty in future projections. In this study, we use E3SMv2 and E3SM-MMF to assess how parameterized and resolved convection affect temperature and precipitation biases over the Southern Great Plains site of the Atmospheric Radiation Measurement program. Both configurations overestimate near-surface temperature and underestimate precipitation at the ARM SGP site. The bias is associated with a lack of low-level clouds during days without precipitation and too much incoming solar radiation causing the surface to warm. Low-level cloud fraction in E3SM-MMF during the nonprecipitating days is lower in comparison to E3SMv2 and observation, consistent with the larger warm bias. We also find that the underestimated precipitation can be characterized as “too frequent, too weak” in E3SMv2 and “too rare, too intense” in E3SM-MMF. These deficiencies conspire to sustain the warm and dry bias over the central United States.

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radiological Impact of 2020 Operations at the Savannah River Site

This report presents environmental dose assessment methods and the estimated potential doses to the public from 2020 Savannah River Site (SRS) atmospheric and liquid radioactive releases. It also documents potential doses from special-case exposure scenarios, such as the consumption of wildlife and/or goat milk. Unless noted, the generic term “dose,” as used in this report, includes both the committed effective dose (50-year committed dose) from internal deposition of radionuclides and the effective dose attributable to sources external to the body. Using the effective dose allows doses from different types of radiation and to different parts of the body to be expressed on the same basis. Humans, plants, and animals potentially receive radiation doses from natural and man-made occurrences. The average annual “background” dose for all people living in the United States is 625 mrem. This includes an average background dose of 311 mrem from naturally occurring radionuclides (found in our bodies and in the earth) and from cosmic radiation. Man-made sources include medical procedures (300 mrem), consumer products (13 mrem), and industrial and occupational exposures (less than 1 mrem).

54 ENVIRONMENTAL SCIENCES↗

Site A and Plot M 2023 Surveillance Report and 2024 Inspection Report

This report is prepared for the U. S. Department of Energy (DOE) Office of Legacy Management (DOE-LM) by the Worker Safety & Environment (WSE) Division at Argonne National Laboratory (Argonne). Beginning in 2024, Argonne drafted a combined report containing the annual inspection results for the current year and the annual surveillance data/discussion from the previous year. The annual inspection results will be contained within an appendix at the end of the surveillance report. The results of the environmental monitoring program at Site A and Plot M and an assessment of the impact of the site on the environment and the public are presented in this publication as well as findings and assigned corrective actions as a result of the Site A/Plot M annual inspection. Funding to support this program was provided by DOE-LM.

54 ENVIRONMENTAL SCIENCES↗