Search NASA⌕ Search

SEARCH · Search NASA

Results for “space fission power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

317 records · Page 18

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗

Computational Thermal Hydraulics of a High-Performance Low-Enriched-Uranium Annular Target for HFIR Irradiation

Molybdenum-99 has historically been generated via isolation from fissioned highly enriched uranium (HEU) targets. Here, this isotope is in high demand due to its daily use across the world in radiopharmaceutical medical procedures. The primary objective of this work was to design and analyze an experimental target assembly containing one low-enriched-uranium (LEU) annular target for irradiation at the High Flux Isotope Reactor (HFIR). Efforts included incorporating spatially dependent energy sources from neutron and gamma interactions, quantifying thermal contact conductance at material interfaces, performing grid-independent studies, comparing turbulence models, and simulating various steady-state and transient scenarios relevant for irradiation qualification and eventual insertion. These models provide velocity, pressure, and temperature distributions in both space and time. Such results enable the selection of an appropriate irradiation location, fission rate density, and flow-limiting orifice size and demonstrate compliance with HFIR safety requirements such that insertion into the reactor can be approved. This analysis shows that across all scenarios, wetted surface temperatures remain below the coolant saturation temperature with no net vapor formation in the coolant. In every scenario, all components stay below 30% of the aluminum 6061 melting temperature. Computational fluid dynamics and system-level models predict peak target temperatures that agree within 4%, though the predicted axial location of the peak differs by about 10% of the heated length due to differences in flow development length. These results de-risk the irradiation of LEU (annular targets) and strengthen a domestic, HEU-independent 99 Mo supply by providing important fuel performance data to form the foundation for a robust licensing basis.

Molybdenum-99↗

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU↗

The Use of Immersion Rigs for High Temperature Hydrogen Exposure Testing within the Nuclear Thermal Rocket Element Environmental Simulator (NTREES): Thermal Soak Rig (TSR)

The Nuclear Thermal Rocket Element Environmental Simulator (NTREES) facility was purpose constructed to perform non-nuclear evaluations of nuclear thermal propulsion (NTP) system fuel materials and structures within prototypic thermochemical environments. This system has been utilized steadily in its ability to subject test specimens to thermochemical and thermohydraulic environments simulating that of an operating nuclear rocket engine. Fission heat is simulated by induction power and experiments are conducted within a ~1000 psi pressure vessel. Hydrogen is conventionally passed through the heated fuel surrogate test specimen while pressure, temperature, and gas species data are collected at various points along the experiment. In order to test fuel and material coupon samples, a class of test apparatus named “immersion rigs” are being developed and employed to more rapidly test these smaller and more technically challenging test specimen. One example of a promising potential fuel structure, Tristructural-isotropic (TRISO) particles, presents unique challenges for testing of this type. TRISO fuel micro-particles are spheroids typically on the order of 500 – 1000 μm in diameter, and exposing a batch sample to hot hydrogen requires purpose-built special test equipment. Thusly, an immersion rig was developed and successfully demonstrated to expose ~1 g of micro-particles to hydrogen gas at temperatures and pressures relevant to NTP systems for the purpose of fuel evaluation. The rig, comprised primarily of graphite and pure tungsten, houses in its core a batch of micro-particles between pucks of porous silicon carbide (SiC). This approach permits gas flow while simultaneously retaining the particles in place. Herein is a discussion of the design, analysis, fabrication, and testing of the NTREES Thermal Soak Rig (TSR).

Space Nuclear Propulsion↗

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

05 NUCLEAR FUELS↗

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fusion-Enabled Pluto Orbiter and Lander

Direct Fusion Drive (DFD) is a unique fusion engine concept based on the Princeton Field-Reversed Configuration (PFRC) fusion reactor conceived by Dr. Sam Cohen of the Princeton Plasma Physics Laboratory. DFD would enable the Pluto orbiter and lander context mission and more broadly enable true "rapid transit" to outer-planet and near interstellar space. The truly game-changing levels of thrust and power in a modestly sized package could integrate with our current launch infrastructure while radically expanding the science capability of these missions. Our Phase I was our first funded work on the DFD, with previous work at PSS occurring only under internal R&D. We established the feasibility of our Pluto mission trajectories using straight-line and planar models, including a departure spiral from Earth and insertion at Pluto. We developed our first thrust and specific impulse model using the results of the UEDGE multi-fluid code. Our specific power model was improved. During this Phase II effort, we continued our efforts to increase the fidelity of the designs for the RF, magnet, and shielding subsystems. Dedicated thrust augmentation experiments were run on the PFRC experiment, using a supersonic gas puffing valve. For the first time, we analyzed the design of a closed-loop operation mode and estimated the hardware that would be required for a dual-mode engine. In an exciting new development, we have invented a new thermophotovoltaic thermal conversion method that has the potential to have efficiencies of a Brayton or Stirling system. Our report presents details of these analyses. Our roadmap to bringing DFD to flight predicts that with sufficient support, a first flight unit could be built by 2040. We anticipate that three machine generations are required before this point: a ~1 T PFRC-3 machine hitting new plasma temperature and density levels, a ~5 T PFRC-4 machine with first demonstration of D-3He fusion, and a flight. (The current experiment, PFRC-2, is limited to about 0.1 T). In order to achieve a flight in 2035-2040, the TRL of the supporting systems must be increased in parallel, including low mass radiators, cryogenic propellant storage, and large (>100 kW) thermal conversion systems. Fortunately, many of these systems are dual-use and are required for other technologies including fission systems, so DFD would contribute to and benefit from those programs. This NIAC support and the results of our work have led to multiple follow-on contracts. We won two NASA STTRs focused on DFD subsystems, one on the RF system and one on the superconducting magnets, and our magnet STTR is now midway through a Phase II. We will be receiving a superconducting test magnet for experiments at PPPL this summer. In addition, we won an ARPA-E OPEN grant; this is the first time that OPEN has included fusion technologies, and we are part of a cohort of three alternative fusion companies now supported directly by DOE. We are very optimistic that if we are able to meet our experimental milestones in the next 12-18 months, we will be competitive for additional DOE grants to build PFRC-3.

Propulsion↗

Separating Propulsive Mass and Energy for Space Applications

Initially and traditionally, space access and in-space propulsion utilized combustion and expulsion of chemical “fuels” carried on board, with performance governed by the rocket equation. These chemicals produced energy, and after combustion, constituted the propulsive mass/momentum. The best such chemicals in terms of Isp that are deemed safe engineering/mission wise are hydrogen and oxygen, producing some 450 seconds of Isp. There are more reactive chemicals, such as fluorine, which have higher Isp, but also have serious safety issues. Propulsion in atmospheres can ingest atmospheric constituents (aka “airbreathing propulsion”) which provide additional propulsive mass when heated and a component of the combustion/energy generation process. This utilization of non-stored/carried propulsive mass provides partial separation of propulsive mass and energy and produces higher Isp. The other approach to separating propulsive mass and energy is to, either on board or added from offboard, supply additional energy, such as from nuclear or solar sources. This is the approach for fission nuclear thermal and electric propulsion, which can provide an Isp in excess of 800 seconds of Isp. Other processes or in addition to thermal expansion, such as electro-magnetics, can be employed to increase exit velocity and Isp. Separating propulsive mass and energy for space faring is commonly referred to as a means to circumvent the rocket equation and is capable of producing major benefits for the development of commercial deep space and space faring in general including affordable fast transits to mitigate the human health impacts of galactic cosmic radiation (GCR) and microG. The key to higher than chemical Isp, beyond H2-O2, and beyond the radiated energy and systems limitations of solar for space faring, is a light weight, high energy density source, either on board or via utilization of energy beaming to the vehicle. Traditional energy sources include chemical, heat, electrics, mechanical, photons, and nuclear. Propulsive mass can be carried on board, sourced beyond the surface of Earth via in-situ resource utilization (ISRU), and includes harvesting from atmospheres. High Isp via electromagnetic related propulsive mass acceleration requires sufficient ionization and conductivity. The major metrics for space propulsion are costs, safety, Isp, weight, and thrust level, the latter dependent upon mission requirements. High thrust for human missions is needed to reduce time exposed to radiation and microG and high thrust is required for space access. Costs of space access are reducing via reusability, printing manufacture, and robotization of manufacturing and operation. Chemical rockets provide high thrust from the expansion of the heated mass constituents at high mass flow. The other high thrust propulsion approach is magnetohydrodynamics (MHD), which, in addition to high thrust, has a high Isp of over 2,000 seconds of Isp. The VASIMIR engine offers some 5,000 seconds of Isp at high thrust [ref. 3]. Electric propulsion cycles are capable of Isp much higher than that but at low thrust levels using available energy sources. With cost as a major metric, reusable rockets and improved manufacturing and operations are rapidly greatly lowering the costs of space access, which could provide/supply in space fuel depots and affordable chemical propulsion for the desired human fast transits (e.g., some 200-day round trips to Mars). The other option for fast transits is VASIMIR, given a nuclear on-board energy source that has the requisite many megawatts of power and an alpha, kgs of weight/kW of energy produced, on the order of one (i.e., a light weight, high energy density energy source). The purpose of this report is to examine the options beyond traditional rocket engines, where propulsive mass and energy are combined, specifically the separation of propulsive mass and energy. This report considers the spectrum of advanced energetics, sources of propulsive mass, conductivity enhancement approaches, energy beaming possibilities, and candidate propulsion cycles. Suggestions are made for various combinatorial, system level, beyond traditional combustion rocket, space propulsion approaches for human deep space missions given the changing conditions of increased knowledge of deep space resources for ISRU, revolutionary energetics, and technology advancements writ large.

Dennis M. Bushnell↗

The Value Proposition of Multi-Megawatt Electric Power/Propulsion for the Human Exploration of Mars

NASA and other space agencies have been offering stakeholders an architecture for the human exploration of Mars that has remained essentially unchanged since the 1960's. The mission duration and launch mass are the two first order figures of merit that drive the total cost of such an architecture. The options studied to date center on the "conjunction class" or "Long Stay" mission, in which surface infrastructure elements are sent ahead on uncrewed, slow trajectories requiring a minimum amount of propellant, and the crewed elements are sent at the synotic cycle's shortest trajectory, stay on Mars until the next close alignment, and then return to Earth. Total crewed mission durations for these architectures range from 900 to 1100 days, with variations driven primarily by trades between the amount of propellant launched and the effective specific mass of the propulsion technology assumed (e.g., chemical, nuclear thermal, solar electric, nuclear electric). Mars transit propulsion systems assumed in mission architectures studied to date have all resulted in architectural figures of merit that drive the cost to a level of "too much." However, nuclear electric propulsion (NEP) technology offers a "knob" that might be turned to enable a radically different Mars architecture, whose launch mass and mission duration may enable a value proposition more palatable to mission stakeholders. Mars architectures studied to date have assumed an NEP system providing 2.5 MWe at a specific mass of no less than 20 kg/kWe. This has often been seen as obtainable with a moderately high temperature fission reactor. An NEP system providing 15 MWe at specific mass of ~1 kg/kWe, though, could enable a short stay (30 days on surface) Mars mission, requiring only two or three SLS-class launch vehicles and a total mission duration of under one calendar year. However, turning this NEP "knob" would require a high risk development program driving innovation on the order of that delivered by the Manhattan Project, but for a fraction of the cost. Any technology option that might offer such a capability at such a development cost now stands at a low Technology Readiness Level (TRL) 3, would be based on a nuclear energy source (likely fusion), and would require an extremely high risk (and rapid) development effort. The aggressive, parallel path project management paradigm exemplified by the original Manhattan Project might have the best chance of success. An energy source developed in this manner may also have a major impact on the terrestrial power industry.

power↗

Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency decision makers to consider FSP as a viable option for potential future flight development. The pump must be compatible with the liquid NaK coolant and have adequate performance to enable a viable flight system. Idaho National Laboratory (INL) was tasked with the design and fabrication of an ALIP suitable for the FSP reference mission. Under the program, a quarter-scale FSP technology demonstration is under construction to test the end-to-end conversion of simulated nuclear thermal power to usable electrical power intended to raise the entire FSP system to Technology Readiness Level 6. An ALIP for this TDU was fabricated under the direction of the INL and shipped to NASA Marshall Space Flight Center (MSFC) for testing at representative operating conditions. This pump was designed to meet the requirements of the TDU experiment. The ALIP test circuit (ATC) at MSFC, previously used to conduct performance evaluation on another ALIP6 was used to test the present TDU pump for the FSP Technology Development program.

Polzin, K. A.↗

Neutronics Modeling of the pulsed plasma rocket reactor using rattlesnake

In the pulsed plasma rocket (PPR) reactor, neutron induced fission processes are utilized to implement a series of pulsed micro-explosions of very high power and eject plasma as a propellant. More specifically, projectiles (bullets) composed of moderated uranium are sent through the chamber of an unmoderated uranium barrel. By inducing rapid fission within the bullets, a plasma can be generated with appropriate delivery of neutrons. This study aims to assess the neutronics performance of the PPR reactor during normal operations using the MOOSE-based Rattlesnake code through the evaluation of the impact of the movement of the fuel bullet and the rotation of control drums on the criticality of the system. The Monte Carlo (MC) code Serpent 2 was employed to generate material-based cross sections for use in Rattlesnake and the reference neutronics solution. Cubit was used to generate the mesh for the Rattlesnake model. Parametric studies were conducted to evaluate the best approaches for cross section and mesh generation to ensure accurate results from Rattlesnake. As part of the verification process, the eigenvalue results of the system at various fuel bullet positions were obtained using Rattlesnake and compared with the reference solutions. The acceptable differences show that the Rattlesnake model with appropriate cross section and mesh generation procedure is a sufficiently accurate approximation of the continuous energy (CE) MC model for micro-sized reactors like the PPR reactor. Next, the impact of the rotation of the control drums on the system criticality was evaluated using the verified model. It was shown that the high-fidelity simulation using the deterministic code Rattlesnake can produce sufficiently accurate results for the evaluation of the reactor's neutronics performance in different phases of the normal operation with acceptable computational cost.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗