Search NASA⌕ Search

SEARCH · Search NASA

Results for “task programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Onboard Autonomous Trajectory Planning for Mars Power Descent

In recent years, there has been an increasing interest in space-qualified processors such as multi-core central processing units and graphics processing units that can withstand the adverse effects of space radiation. These processors can allow parallel programming to perform tasks that typically demand high computational power. One can study guidance schemes that can take advantage of these currently developing processors and provide more robust guidance. Software for Multi-model Autonomous Real-time Trajectories (SMART) guidance can identify robust trajectories by running an onboard Monte Carlo analysis. SMART guidance can take advantage of knowledge updates obtained from the onboard sensors, allowing it to consider the off-nominal cases that it would not typically encounter during the offline trajectory analysis. This work uses the SMART guidance for the powered divert at Mars simulation in Program to Optimize and Simulated Trajectories- II.

Autonomous Planning↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

NASA-UVa light aerospace alloy and structures technology program supplement: Aluminum-based materials for high speed aircraft

This report on the NASA-UVa light aerospace alloy and structure technology program supplement: Aluminum-Based Materials for High Speed Aircraft covers the period from July 1, 1992. The objective of the research is to develop aluminum alloys and aluminum matrix composites for the airframe which can efficiently perform in the HSCT environment for periods as long as 60,000 hours (certification for 120,000 hours) and, at the same time, meet the cost and weight requirements for an economically viable aircraft. Current industry baselines focus on flight at Mach 2.4. The research covers four major materials systems: (1) Ingot metallurgy 2XXX, 6XXX, and 8XXX alloys, (2) Powder metallurgy 2XXX alloys, (3) Rapidly solidified, dispersion strengthened Al-Fe-X alloys, and (4) Discontinuously reinforced metal matrix composites. There are ten major tasks in the program which also include evaluation and trade-off studies by Boeing and Douglas aircraft companies.

Starke, E. A., Jr.↗

NASA-UVa light aerospace alloy and structure technology program supplement: Aluminum-based materials for high speed aircraft

This report on the NASA-UVa Light Aerospace Alloy and Structure Technology Program Supplement: Aluminum-Based Materials for High Speed Aircraft covers the period from January 1, 1992 to June 30, 1992. The objective of the research is to develop aluminum alloys and aluminum matrix composites for the airframe which can efficiently perform in the HSCT environment for periods as long as 60,000 hours (certification for 120,000 hours) and, at the same time, meet the cost and weight requirements for an economically viable aircraft. Current industry baselines focus on flight at Mach 2.4. The research covers four major materials systems: (1) ingot metallurgy 2XXX, 6XXX, and 8XXX alloys, (2) powder metallurgy 2XXX alloys, (3) rapidly solidified, dispersion strengthened Al-Fe-X alloys, and (4) discontinuously reinforced metal matrix composites. There are ten major tasks in the program which also include evaluation and trade-off studies by Boeing and Douglas aircraft companies.

Starke, E. A., Jr.↗

An interactive parallel programming environment applied in atmospheric science

This article introduces an interactive parallel programming environment (IPPE) that simplifies the generation and execution of parallel programs. One of the tasks of the environment is to generate message-passing parallel programs for homogeneous and heterogeneous computing platforms. The parallel programs are represented by using visual objects. This is accomplished with the help of a graphical programming editor that is implemented in Java and enables portability to a wide variety of computer platforms. In contrast to other graphical programming systems, reusable parts of the programs can be stored in a program library to support rapid prototyping. In addition, runtime performance data on different computing platforms is collected in a database. A selection process determines dynamically the software and the hardware platform to be used to solve the problem in minimal wall-clock time. The environment is currently being tested on a Grand Challenge problem, the NASA four-dimensional data assimilation system.

Interactive Display Devices↗

NASA's Approach to Critical Risks for Extended Human Space Flight

Planetary Robotic and Human Spaceflight Exploration Humans are exposed to a great variety of hazards in the space environment. These include the effects of weightlessness, radiation, isolation and confinement, altered day-night cycles, and others. These inherent hazards have both physiological and behavioral consequences. The adaptive capabilities of humans in these situations is remarkable, and often exceed our expectations. However, the demanding environment and challenging operational pace can push some of these adaptive processes to their limits. The NASA Human Research Program (HRP) is tasked with mitigating the most serious of these effects on human health, safety, and performance, in long-duration space flight. This can involve the development and deployment of physiological countermeasures, better understanding of the physiological alterations and avoidance of exacerbating situations, inputs to the design of future spacecraft to minimize risks, and in some cases the awareness that some level of risk might have to be accepted based on the resulting consequences and their likelihood. HRP has identified a few areas that are of special concern due to their severity, lack of understanding of underlying causes, or potential for negative impact on health or performance. Some of these areas are visual impairment possibly due to increased intracranial pressure, behavioral and performance problems due to sleep deficits and isolation, and acute and chronic effects of radiation. These problems can, if not addressed, be expected to increase on longer and more distant missions. The evidence from spaceflight, laboratory, and analog studies that supports the selection of the most critical risks will be discussed. Current and planned research programs that address these risks, and their anticipated outcomes, will also be described.

Shelhamer, Mark↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Constructing an Educational Mars Simulation

Working in the Educational Programs Office, my task this summer is to model a 3D habitat that will be part of a future Mars base. With the President's charge to further explore mars by way of robotic-led and human-led missions, there has been a surge in the activity regarding the "red planet". Since all present designs are merely conjecture, I have some creative freedom in deciding what the habitat will look like. To get ideas for what a Mars habitat might be like, I looked at several references including websites and NASA documents. One of these was a NASA Technical Memorandum about Space Transportation Systems that I looked at to get insight on spaceship design. Information about the planet's environment, such as the gravity and the weather, is useful as well when designing the structure. The main software that I am using is Lightwave 3D and Modeler 7.5 that comes along with it. Lightwave is very complex in that it lets you model, surface, and animate so there was a lot to learn. To learn the software I watched a series of instructional videos, looked at online tutorials, and referenced several books. Modeling is like shaping clay with a computer. Every item modeled is made of smaller shapes called polygons. For example, each side of a box would be a different polygon. Modelers must be careful to design with users' systems in mind. Having a model made with too many polygons can slow down a walk-through, but it usually improves the small details on a model. Getting speed and quality proved tricky. An important thing for me to remember when modeling the habitat was to save space. Also, I must consider that technology in the future will be much different than now, so I must be especially creative. My project will be used in an educational walkthough simulation in which users can interact with the environment. I worked closely with intern Stephen Henke who built a Mars Rover, terrain and programmed code for the simulation. This summer's project will help me with future aspirations in computer graphics. Modeling is a valuable skill that I appreciate having the chance to learn and practice.

Henke, Stephen A.↗

Glass Fiber Reinforced Metal Pressure Vessel Design Guide

The Engineering Guide presents curves and general equations for safelife design of lightweight glass fiber reinforced (GFR) metal pressure vessels operating under anticipated Space Shuttle service conditions. The high composite vessel weight efficiency is shown to be relatively insensitive to shape, providing increased flexibility to designers establishing spacecraft configurations. Spheres, oblate speroids, and cylinders constructed of GFR Inconel X-750, 2219-T62 aluminum, and cryoformed 301 stainless steel are covered; design parameters and performance efficiencies for each configuration are compared at ambient and cryogenic temperature for an operating pressure range of 690 to 2760 N/sq cm (1000 to 4000 psi). Design variables are presented as a function of metal shell operating to sizing (proof) stress ratios for use with fracture mechanics data generated under a separate task of this program.

Landes, R. E.↗

S-band omnidirectional antenna for the SERT-C satellite

The program to design an S-band omnidirectional antenna system for the SERT-C spacecraft is discussed. The program involved the tasks of antenna analyses by computer techniques, scale model radiation pattern measurements of a number of antenna systems, full-scale RF measurements, and the recommended design, including detailed drawings. A number of antenna elements were considered: the cavity-backed spiral, quadrifilar helix, and crossed-dipoles were chosen for in-depth studies. The final design consisted of a two-element array of cavity-backed spirals mounted on opposite sides of spacecraft and fed in-phase through a hybrid junction. This antenna system meets the coverage requirement of having a gain of at least minus 10 dBi over 50 percent of a 4 pi steradian sphere with the solar panels in operation. This coverage level is increased if the ground station has the capability to change polarization.

Bassett, H. L.↗

The Baltimore applications project: A new look at technology transfer

The history of cooperation between Goddard Space Flight Center and Baltimore City administrators in solving urban problems is summarized. NASA provided consultation and advisory services as well as technology resources and demonstrations. Research and development programs for 69 tasks are briefly described. Technology utilization for incinerator energy, data collection, Health Department problems, and solarization experiments are presented as case histories.

Source record↗

Development and use of an integrated analysis capability

The paper describes a multi-discipline integrated analysis capability, designed to aid the engineering community in coupling of existing modules and in handling of the associated software and data. This capability consists of an executive program which manages tasks and data, a number of technical modules, graphics and special purpose modules, inter-module data flow interfaces, and associated user documentation. The current implementation provides specific modules and coupled solution paths for the thermal, structures and controls technologies. However, the system has been designed to serve also as a framework into which user groups may incorporate other modules and technologies. Details of the system architecture are discussed, in the context of the major design decisions and the software development and usage experience. The paper provides a brief discussion of some other integrated systems which are available or under development.

Vos, R. G.↗

Evaluation methodologies for an advanced information processing system

The system concept and requirements for an Advanced Information Processing System (AIPS) are briefly described, but the emphasis of this paper is on the evaluation methodologies being developed and utilized in the AIPS program. The evaluation tasks include hardware reliability, maintainability and availability, software reliability, performance, and performability. Hardware RMA and software reliability are addressed with Markov modeling techniques. The performance analysis for AIPS is based on queueing theory. Performability is a measure of merit which combines system reliability and performance measures. The probability laws of the performance measures are obtained from the Markov reliability models. Scalar functions of this law such as the mean and variance provide measures of merit in the AIPS performability evaluations.

Schabowsky, R. S., Jr.↗