Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerated Fuel Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

336 records · Page 19

Advanced Algal Biofoundries for the Production of Polyurethane Precursors

The primary goal of the BEEPs project was to develop a process that could accelerate the development of algae as bioproduction platforms, from initial chemical product concept to an economically viable market supply. Under this program we elected to develop strains of algae that could generate polyurethane precursors, while simultaneously developing basic genetic tools to enable improved algal production systems. This program was specifically designed to incorporate National Laboratories as a means to utilize the expertise and facilities for new bio-production platforms. To that end, we designed a program to collaborate with the Agile BioFoundry at Lawrence Berkeley National Laboratory (LBNL) and computational platforms at Pacific Northwest National Laboratory (PNNL). In addition to these National Laboratory partners, we also had academic partners from UC Davis and Georgia Tech, as well as commercial partners Algenesis Materials and BASF. To achieve these goals, we initially focused on developing the genetic tools and high throughput screening technologies necessary to generate and assess production of polymer precursors (succinic acid) in algae and cyanobacteria, including advanced promoters and biosensors. In parallel, we computationally identified potential production bottlenecks and then used the developed genetic tools to increase production rates and yields. Constant feedback of data was used in conjunction with machine learning, high-throughput cell sorting, and synthetic biology, for additional targeted metabolic engineering. Multiple rounds of tool design, building, testing, and learning were supplied to partners at PNNL and LBNL to develop new models and tools that could expedite bioproduction platform development and increase yield performance. We targeted, and achieved, the FOA requirement yield metric of 20 g/L, as a milestone and deliverable from at least one of our engineered strains for the production of succinic acid.

09 BIOMASS FUELS↗

Smart Composite Pressure Vessels (SCPV) with Integrated Health Monitoring

The U.S. Department of Energy (DOE) is promoting and developing more energy efficient and environmentally friendly technologies that will enable America to use less petroleum. Hydrogen fuel cells – which directly convert the chemical energy in hydrogen to electricity with only water and heat as byproducts – are a very attractive solution that can enable this to happen. To date, DOE's efforts have culminated in commercial demonstration of on-board vehicular hydrogen storage systems that can allow for a driving range of greater than 300 miles. This requires storing 5 Kgs of hydrogen onboard a light vehicle. In order to store this quantity of hydrogen, the hydrogen gas needs to be stored in a composite overwrapped pressure vessel (COPV) at a very high internal pressure. The objective of the program was to demonstrate continuous and predictable health-monitoring of composite pressure vessels. A higher confidence in the operational safety of the vessels will lead to reduced burst factor of safety imposed by regulatory standards and hence will help reduce the structural wall thickness that drives the cost of the vessel. Highly optimized Type III (metal lined) and Type IV (polymer lined) COPVs that are manufactured using filament winding process have been designed and qualified for the above mentioned application. However, the main structural component of the COPVs is carbon fiber and the high cost of carbon fiber composite in a pressure vessel is a primary challenge in reducing the cost of gaseous hydrogen storage. Continuous and remote monitoring of structural health of the COPVs as well as optimization of the strength translation of carbon fibers have the potential to allow for reduced factor of safety, thereby reduced amount of carbon and associated cost of the vessel. In the current program, the project team including Steelhead Composites (SHC), University of Tennessee, Knoxville (UTK), Teijin Carbon America, Oak Ridge National Laboratory (ORNL) and LUNA designed, fabricated, and tested smart composite pressure vessels with integrated sensors. Iterative loops of design and testing using coupons, subscale STEB vessels and full size vessels proved that a new generation of high performance carbon fiber can be used for efficient design of Type 3 vessels for H2 storage. Novel analysis techniques were developed to predict the initiation and propagation of interlaminar damage inside the composite shell due to impact damage, a real threat in practical operation. Such an analysis scheme is typically not used in tank design but is an essential tool for health monitoring of composite vessels. Remote sensing of the key signatures of the tank’s operating parameters such as pressure, acceleration and humidity was demonstrated using a unique device that can wirelessly transmit and stream the data to a remote server. Fiber optic sensors were successfully integrated during fabrication of the tanks. These sensors provide a wealth of information regarding the structural health of the vessel when it is subsequently pressurized or subjected to impact damage. Excellent correlation was demonstrated between the fiber optic sensor and mechanical strain gage data, and between the measurements and analytical predictions.

08 HYDROGEN↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion-Resistant Non-Carbon Electrocatalyst Supports for PEFCS

Insufficient durability of commercial catalysts is a persistent issue for PEFC applications.1 Herein, Pt on Nb-doped-TiO 2 is reported as a highly durable electrocatalyst on which the direct 4-electron reduction of oxygen to water is more facile compared to Pt/C. All performance metrics are reported comparing Pt/Nb-TiO2 with a 15% Pt loading, against a commercial Pt/C catalyst (46.5% Pt loading, Tanaka, K. K.). Nb-doped-TiO 2 with high surface area and high electronic conductivity was synthesized using the supercritical fluid method. Initially, the durability of the catalyst was characterized using accelerated stability tests (ASTs) involving 10,000 high potential cycles (DOE/FCCJ protocol) and the Pt/Nb-TiO 2 was found to retain 78% of its initial electrochemically active surface area (ECSA) compared to the 57.6 % retained by Pt/C. These observations were in excellent agreement with previous reports that the Pt particle size of Pt/C grew from 2nm to 8nm during the AST protocol along with severe corrosion and amorphization of the carbon surface.2, 3 TEM and XPS studies of the Pt-Nb-doped-TiO 2 catalyst showed that the Pt particle size grew from 3nm to 6nm and the Nb(IV) and Ti(III) in the support were oxidized to Nb(V) and Ti(IV) after the durability test. Thus, the improvement in Pt/Nb-TiO 2 ECSA retention was attributed to the lower extent of particle growth and lack of oxidative support loss upon oxidation as compared to Pt/C. The oxygen reduction reaction (ORR) performance was characterized by linear polarization using a rotating disk electrode (RDE). The electrochemical surface areas of Pt/Nb-TiO 2 and Pt/C were found to be 48m2·g -1 and 83m2·g -1 respectively, and the mass activity for the ORR at 0.9V vs. RHE were found to be 150 mA·mg-1Pt and 124 mA·mg-1Pt respectively. The improved mass activity on Pt/Nb-TiO 2 was attributed to strong metal support interaction (SMSI) between the Nb-TiO 2 support and the Pt catalyst based on the 625 meV decrease in the binding energy of the Pt4f x-ray photo-electron spectroscopy (XPS) peaks of Pt/Nb-TiO 2 compared to Pt/C. To quantify the impact of the SMSI, a kinetic model was applied to calculate the elementary reaction rate constants for the various steps of the ORR on both catalysts. The reaction rate constant (k1) for the direct 4-electron transfer pathway to produce H 2 O was significantly larger in Pt/Nb-TiO 2 as compared to Pt/C. Thus, the reduction in the electron binding energy as observed in the XPS was found to aid the facile filling of the higher energy 2p orbitals of O 2 thereby leading to improved 4-electron transfer kinetics and improved overall activity.

08 HYDROGEN↗

Developing And Scaling an OpenFOAM Model to Study Turbulent Flow in a HFIR Coolant Channel

Improving the understanding of how computational fluid dynamics (CFD) direct numerical simulations (DNS) of flows in the High Flux Isotope Reactor (HFIR) perform when run in parallel using the high performance computing (HPC) platform Summit at the Oak Ridge Leadership Computing Facility (OLCF) is of particular importance to boost the computational tools used to support HFIR conversion to low enriched fuel (LEU). Evaluation of scaling performance was driven by the increasing importance of graphics processing unit (GPU) usage in HPC, which is becoming the standard for modern supercomputers such as Summit. The desired results are to obtain a strong positive correlation between the computational resources dedicated to a problem and the relative speed-up of the simulation in comparison to a benchmark. This capability will allow substantially improvement in HFIR flow analytical capabilities, specifically when predicting turbulence properties at high Reynolds numbers. The study leverages previous simulation results performed with code PHASTA (finite element) on HPC platforms Cori (NERSC) and Theta (ALCF) [1] with computing options provided in the computing platform OpenFOAM (finite volume) at OLCF. Transitioning from PHASTA to OpenFOAM will (1) eliminate dependence on third-party software for mesh generation and manipulation, (2) reduce resource needs by employing modern architectures, and (3) build expertise for future modeling of HFIR-specific problems like heat transfer in involute geometry, entrance effects, flow structure in channel corners, and so on—all important issues when defining the available thermal margins in the transition to LEU. CPUs and GPUs differ significantly in their architecture and utilization, as discussed in the literature [2]. The most important differences are in the approach to computations and their memory. A single GPU contains a large quantity of cores, enabling it to perform with a much higher throughput than a CPU, but execution requires a different approach. GPU codes execute instructions using the Single-Instruction Multiple-Thread (SIMT) approach in which a single instruction is used for groups of threads called warps. A warp typically consists of 32 threads which must execute the same set of instructions, although on separate threads. Alternately, a CPU has far fewer cores that are much more flexible in their operation, excelling at quickly performing more complex serial computations. This is why GPUs have greater throughput when properly utilized. The second important difference is seen when comparing their memory spaces. Limited memory allocations and CPU–GPU communications cause a significant bottleneck in GPU-accelerated programs. Further study was required to properly take advantage of GPU resources. A comprehensive analysis of code performance and the model-specific features of turbulence constitutes the core of this work. In this study, a DNS simulation of HFIR channel turbulence was performed with the finite volume CFD code OpenFOAM v2112 and CUDA v11.0 on Red Hat Enterprise Linux v8.2. The OpenFOAM installation had AMGx integrated to enable GPU acceleration and utilizes the PETSc4FOAM library. The computational resources and the problem size were scaled on CPU and CPU + GPU architectures to gain a better understanding of the performance of a DNS problem on modern computing hardware. The study aimed to analyze the scaling of the code exclusively on CPUs and then to examine the scaling of the codes with GPU acceleration enabled. Scaling studies included CPU and GPU acceleration on a mesh of varying resolution to analyze the impact of problem size relative to computational resources. In the course of preparing the GPU configuration on Summit, mainly using the AMGX solvers, difficulties were encountered stemming from constant changes resulting from extensive ongoing development activities and the changing environment. This resulted in the inability to complete the GPU portion of the work. The code was compiled and tested, but production runs to assess acceleration were not performed because the used discretional compute time allocation expired as year-end approached. The Summit HPC platform is scheduled for decommissioning in 2024, making it unattractive for future use with Nvidia-based GPUs. Therefore, the work will be moved onto NERSC machines in FY24. An application was prepared and submitted, and sufficient node-hours were awarded to continue the research in the next calendar year. This report summarizes work performed thus far, which mostly focused on CPU OpenFOAM computing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

COMPUTATIONAL MODELING OF IGNITION AND PREMIXED FLAME PROPAGATION INITIATED BY A PRE-CHAMBER TURBULENT JET

Addressing the pressing need for reduced carbon emissions, Turbulent Jet Ignition (TJI) emerges as a promising technology for ultra-lean combustion, offering enhanced thermal efficiencies and minimized cyclic variability in spark-ignited engines. To facilitate rapid testing and integration of this technology, a robust computational modeling framework is crucial. This study delves into the predictive capabilities of computational models for main-chamber ignition and premixed flame propagation using a single-cycle TJI rig measured by Biswas et al. (Applied Thermal Engineering, vol 106, 2016). Employing an open-source compressible flow simulation solver with Large Eddy Simulation (LES) for turbulence modeling, the investigation integrates the conventional Laminar Finite Rate Chemistry (LFRC) model alongside the transported Probability Density Method (PDF) for turbulence-chemistry interaction. A fully-consistent Eulerian Monte-Carlo Fields (EMCF) method is utilized to approximate the transported PDF, while Interaction by Exchange with Mean is employed to close micro-mixing terms in stochastic differential equations. A reduced chemical reaction mechanism with 21 species and 84 reactions (DRM-19) is used for solving chemical kinetics, and a double Gaussian energy deposition model is used to approximate the spark ignition in the pre-chamber. An unstructured O-grid mesh with 0.3 million cells in the prechamber and 1 million cells in the main chamber is employed. Results are divided into two phases: pre-chamber initialization and full TJI simulations. Validation of the predicted pre-chamber flame propagation and the lean ignition in the main-chamber is carried out by using available experimental data. Under quiescent conditions, both the LFRC and transported PDF methods largely underestimate the flame speed and subsequent pressure growth in the pre-chamber. A linear momentum forcing technique is applied to investigate the impact of initial turbulence in the pre-chamber, demonstrating a notable influence on flame propagation. Fine-tuning of the forcing coefficient reproduces the sudden pressure growth observed in the experiment. The experimentally validated pre-chamber simulation serves as the initial condition for the full TJI simulations. It is found that the LFRC model fails to predict lean-ignition in the main-chamber, resulting in a misfiring event. Incorporation of turbulence-chemistry interaction using the transported PDF method substantially improves the prediction of the ignition event in the main-chamber, achieving fair qualitative agreement and quantitative validation of combustion parameters within ±10% of the reported experimental data. The rich simulation results consisting of a full set of statistical description of the thermo-chemical states enable us to gain deep insights into the ignition mechanisms in the main chamber, which is limited when done experimentally. A novel dual ignition phenomenon is revealed in the TJI rig for the first time. Initially, a primary ignition kernel is formed at a downstream location which eventually detaches from the main jet. As the jet momentum decreases, a secondary ignition event follows, this time at a more upstream location which eventually combines with the primary ignition kernel to form a single connected flame front. Investigation of these ignition sequences in chemical composition space reveal distinct differences between the two. The primary ignition event in the main-chamber is followed by a large concentration of active radicals from the pre-chamber jet, accelerating the chain-branching steps, characterizing what has been referred to as flame ignition. In contrast, the secondary ignition occurs in the absence of active radicals in the pre-chamber jet, hence characterized as jet ignition. Further analysis of the effect of pre-chamber jet characteristics on lean ignition in the main-chamber is conducted by setting up cases with different initial pressure ratios (por) between the two chambers, a non-dimensional parameter, ranging from 1.2 to 3.2. As the initial pressure ratio increases, jet momentum increases, with dual ignition observed in cases above por= 2.2. Case with por= 3.2 lead to misfiring. The effect of ignition sequence on global combustion characteristics of TJI is analyzed. Dual ignition events lead to non-monotonicity in combustion characteristics such as global reaction progress variable, flame penetration, and global heat release rate. In dual ignition events, although the rate of fuel consumption and global heat release rate is initially lower, the secondary ignition leads to a sudden increase in flame surface area, resulting in a sudden jump and promoting the overall performance of the TJI system.

42 ENGINEERING↗

Geology of the One Earth Energy Site

The One Earth Energy site is one of two sites in the Illinois Storage Corridor (ISC) project. The objectives of the ISC project is to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site. At the One Earth Energy site, an extensive data collection program was undertaken, which included the drilling of a test well (One Earth Energy #1 [OEE #1]), four 2D seismic lines, and a small 3D seismic survey. The OEE #1 well was drilled in 2022 and acquired extensive core, log, and testing data to characterize the subsurface geology of the site. Coring was focused on the storage interval, the Mt. Simon Sandstone, and the confining interval, the Eau Claire Formation. The core and log data were used to evaluate the sedimentology and sequence stratigraphy, as well as to develop the conceptual geologic model. This report includes the geological summaries of the Mt. Simon Sandstone and the Eau Claire Formation. The extensive analysis of the log data is included in the petrophysical section, showing ranges of porosity, estimated pore size, and the mineral content of selected zones in the well. The separate petrographic technical report entitled “Petrographic and Advanced Geologic Characterization Report on One Earth Energy #1 (API# 1211325373)”, report number DOE-UIUC-0031892-04, details thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis, annotated thin section photomicrographs, scanning electron microscopy (SEM) with energy dispersive X-ray spectroscopy (EDS), and statistics of grain size analysis on Mt. Simon thin sections from OEE #1. The final OEE #1 well data to be included in this geology report is the routine core analysis of both whole core plugs and rotary sidewall core plugs. In addition to the OEE #1 well, four 2D seismic lines and a small 3D survey were acquired as part of the overall subsurface geological characterization. This geology report references the seismic interpretation report, entitled “One Earth Energy Site Seismic Interpretation Task 5.0”, report number DOE-UIUC-0031892-07. This report details the stratigraphic and structural interpretation of the 2D and 3D seismic data acquired at the One Earth Energy site. The 2D seismic data was acquired in 2019 and 2021, and the 3D survey was acquired in 2022. The objectives of the seismic programs were to contribute to the subsurface characterization of the Mt. Simon-Eau Claire Storage Complex by evaluating the continuity of potential storage reservoirs and containment intervals across the project area, and to determine if any geologic features are present that would increase containment risk to the proposed carbon storage project.

09 BIOMASS FUELS↗

Concentrating Rare Earth Elements in Coal mine drainage Using Coal Combustion Products through Abandoned Mine Land Reclamation

Rare earth elements (REEs) (including scandium, yttrium and a group of 15 lanthanides) are often considered to be critical components in the productions of renewable energy hardware, electric vehicles, health care and military equipment, and consumer electronic products. The demand of REEs has been projected to be growing at an annual rate of 5-9% in the next 25 years. In 2011, the global demand of total rare earth oxides (REOs) was estimated to be approximately 105,000 tons, which is expected to grow to 210,000 tons by 2025. China overwhelmingly dominates the current worldwide rare earth productions but has strategically restricted its exports, causing significant instability for the global market. In response to the increasing demand for REEs and the supply dominance of China, identifying alternative sources of REEs has become a critical issue for the United States and other countries. Coal, coal ash, and coal mine drainage (CMD) are considered to be the alternative sources of REEs. In the U.S., high REE concentrations have been reported to be closely associated with coal deposits, including the Appalachian Basins. When surface and/or groundwater come in contact with geologic strata containing sulfide minerals exposed by coal mining, the accelerated oxidation of sulfide minerals in the presence of ferric iron and/or oxygen can produce sulfuric acid. The process promotes the weathering of REE-bearing rocks and minerals in the host geologic strata. Compared to average river water and seawater, the concentrations of REEs can be orders of magnitude higher in CMD. In this study, we demonstrated a trap-extract-precipitate (TEP) process that can effectively recover REEs from CMD. The three-stage TEP process uses alkaline industrial by-products to capture REEs from CMD and then applies an extraction/precipitation procedure to produce a feedstock that can be economically processed to produce marketable rare earth oxides. The alkaline industrial by-products tested in this study include the residual from a water softening process (DRWP sludge) and two types of stabilized flue gas desulfurization materials (sFGDs). sFGD material is a mixture of lime (CaO) and two coal combustion by-products, calcium sulfite FGD by-product and fly ash. The objectives of this study are to (1) validate the effectiveness and feasibility; (2) determine mechanisms controlling the rare earth recovery, (3) quantify the associated economic and environmental benefits, and (4) evaluate the full-scale application. To achieve these objectives, tasks to be carried out in this proposed project are organized into three phases. In the first phase, the research team collaborated with Ohio Department of Natural Resources, American Electric Power, The Wilds (a nonprofit wildlife conservation organization), and a private landowner to carry out field investigations aimed to screen and evaluate the seasonal changes of rare earths in the CMD discharges that have high recovery potentials. Next, the recovery of REEs from CMD was tested using a series of lab-scale column and batch tests under, respectively, percolation and completely mixed conditions. Results obtained from these lab-scale studies show that all three tested solids are very effective in retaining REEs. Over 98% of the CMD REEs that contacted the solids were captured before the solids exhausted their neutralization capacities. We also determined an extraction process using a non-acid, organic ligand extraction solution that can effectively remobilize the retained REEs from the spent solids (over 90%). The REE concentrate (>7.5 wt. % of total REEs) is then formed in an aeration process. The TEP process uses environmentally benign industrial by-products and a naturally-occurring organic ligand to mitigate CMD and recover REEs. Techno-economic analysis (TEA) and life-cycle assessment (LCA) was carried out in the third phase. The engineering-economic costs and net energy, net CO2 emissions, and water and other requirements were investigated to understand the economic and environmental implications of this process. This work uses mass and energy balances from laboratory-scale experiments to estimate the economic costs and environmental impacts. The results suggest that passive treatment systems that use DRWP sludge are preferred over those that use sFGD material, because of lower economic costs ($89,300/yr with a unit cost of $86/gT-REE vs. $89,800/yr, or $278/gT-REE) and improved environmental performance across all indicators from two different impact assessment methods. These differences are largely attributable to the larger capacity of DRWP sludge in the passive treatment application. We envision this TEP process can be integrated with abandoned mine land (AML) reclamation to create an approach that can add economic incentives for AML reclamation, remediate CMD discharge, and eliminate public safety hazards and threats to local environment and ecological systems posed by AMLs. It can restore lands and communities that are adversely impacted by legacy mining.

01 COAL, LIGNITE, AND PEAT↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Metallurgical Analysis of the High Flux Isotope Reactor (HFIR) Carrier Lifting Bails (Rev.1)

The dissolution rates of the aluminum alloys in the High Flux Isotope Reactor (HFIR) element carriers and the Material Test Reactor (MTR) L-bundles in the H-Canyon facility have been identified as the possible cause of extended dissolutions that result in significant time and financial expenditures. A study, carried out by Savannah River National Laboratory (SRNL) to determine relationships between the dissolution rates and the metallurgical properties of the aluminum alloy materials of construction of the HFIR carriers and the L-bundles, considered the dissolution rates of aluminum alloy (AA) series 1100, 6061, and 6063. The study determined that the aluminum alloy compositions played a principal role in the dissolution rate of the carrier/bundle components. Higher dissolution rates were correlated with lower concentrations of the minor element additions in the alloys and with specific element concentrations. Aluminum alloys 1100 and 6063 were found to have similar dissolution rates that were approximately two orders of magnitude (100X) greater than those of AA6061. Based on the results of the dissolution behavior study, a Technical Assistance Request (TAR) was first issued to determine if the replacement of AA6061-T6 with AA6063-T6 is feasible for the HFIR carrier lifting bails. A Technical Task Request was then issued to consider AA6063-T5 as well as other alloys to improve possible supply chain issues. The metallurgical properties of the L-bundle (specifically the end caps) were not evaluated in this report because L-Bundle drawings already allow for the use of AA6063-T6 in all structural components. The HFIR carriers are composed of thin-walled components with significant surface areas that allow for relatively quick overall dissolution times. Conversely, the carrier lifting bails and the supporting constituents are composed of solid bars and thick plate regions with relatively small surface areas that experience longer overall dissolution times. While the MTR L-bundle design includes allowances for the materials of construction to be either AA6061-T6 or AA6063-T6, the HFIR carriers are specified to be constructed fully with AA6061-T6 alloy. This report analyzes the recommendations of the dissolution behavior study to replace the materials of construction of the HFIR carrier lifting bails. The analysis considers the operational requirements of the lifting bail and its supporting structures. To decrease dissolution times, the analysis considers direct replacement of the material as well as reductions in the thicknesses of the components to decrease the mass of the elements. Material reductions are considered on options for using either AA6061 and/or AA6063. The calculations are based on specifications from the American Society of Mechanical Engineer (ASME) and The Aluminum Association, Inc. design codes. The analysis finds that direct replacement of the lifting bail material of construction with AA6063-T6, and AA6063-T5 as well as reductions in the dimensions of the lifting bail components are acceptable. Note that this study considers the structural suitability of the alloys. It does not consider their dissolution rates in the dissolvers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗