At least 343 records · Page 19

Assessment of Biocide Impacts on Life Support (LS) and Extravehicular Activity (EVA) Architectures

The Project Manager for the Human Exploration and Operations Mission Directorate’s Advanced Exploration Systems Life Support Systems (LSS) project, requested a NASA Engineering and Safety Center (NESC) assessment to evaluate potable water system biocide options impacting Gateway, Human Lander Systems, Foundation Surface Habitat, and Exploration Command Module missions. The assessment focused on identifying feasible biocide options, evaluating the impacts of their implementation on crew health, extravehicular activity hardware, and LSS hardware, and conducting a trade on architecture options. This report contains the outcome of the NESC assessment.

Extravehicular Activity; Life Support; NASA Engine↗

Quiet Spacecraft Cabin Ventilation Fan Development: Motivation and Context

It is important to control acoustical noise aboard crewed space vehicles and space habitats to provide a satisfactory environment for voice communications, alarm audibility, and restful sleep, and to minimize the risk for hearing loss and annoyance. As with most noise control efforts, it is best to control the noise at the source, and for spaceflight vehicles these are typically the fans associated with the Environmental Control and Life Support (ECLS) system. These include air ventilation fans, such as the main air conditioning fan (the ‘cabin fan’), intermodule ventilation (IMV) fans, air revitalization fans (for removal of carbon dioxide and trace contaminates), and thermal cooling fans. Thermal cooling pumps that circulate cooling fluid are another significant noise source in spaceflight vehicles, but these are outside of the scope of this paper. Throughout the history of crewed spaceflight, there have been issues with noise from ECLS ventilation fans. In the Apollo Command Module (CM) the crew would turn off the CM cabin fan once in orbit and use the backup suit-loop fan for ventilation because noise from the cabin fan interfered with communications and was an annoyance. On the Space Shuttle the ventilation system underwent significant redesign, including the addition of ventilation system mufflers, with resulting noise levels that were still too-high for long-duration missions. In the early years of International Space Station (ISS) operations, acoustical noise was one of the top two habitability issues, resulting in significant noise controls (along with significant cost and crew-time impacts) being implemented on-orbit on many fans, with significant noise reductions realized only after replacing noisy fans with fans of a quieter design, funded by the ISS Program. And, with the spaceflight vehicles and habitats currently being developed, there are again concerns with noise levels from ventilation fans. In the Orion vehicle, additional duct mufflers needed to be added to address the cabin fan noise. The Gateway’s Habitation and Logistics Outpost (HALO) module and low-Earth orbit (LEO) Freeflyer habitats are currently working to solve this problem. This will also be an issue for lunar and Mars spaceflight vehicles, space suits, and surface habitats. In an effort to address this problem, NASA is working to leverage the technology developed in its Aeronautics Research Mission Directorate (ARMD), specifically at the Glenn Research Center (GRC), to design highly efficient and quiet fans for reducing community noise levels from civilian aircraft. This technology was created over decades of research and development, and was proven to be effective at reducing aircraft noise levels. The current collaboration across NASA Centers, including HQ, GRC, and the Johnson Space Center (JSC) in this area is the first effort at re-purposing these tools, i.e. design codes and techniques, developed for high Reynolds number fans to spaceflight vehicle and habitat, low Reynolds number, fans. This paper will discuss the need for transfer of aeronautics fan design technology to spaceflight use. This paper will also discuss the potential benefits from this, which are significant, including 1) volume and mass savings from noise controls that are no longer as large or needed at all, 2) reduced system pressure loss from mufflers and silencers (that don’t need to be as restrictive) for better ventilation, 3) reduced power draw because of the reduced system pressure loss and the highly efficient fan design, and 4) satisfying spaceflight vehicle acoustic requirements to provide a safe and habitable acoustic environment for astronaut crewmembers. All of these benefits will be crucial for the successful development and operations of future spaceflight vehicles, space suits, and habitats.

Christopher S. Allen↗

Evaluation of Temporal Spacing Errors Associated with Interval Management Algorithms

This paper seeks to characterize the temporal spacing errors resulting from the use of Interval Management (IM) algorithms. The focus of the current paper is IM concepts and algorithms that realize a specified temporal spacing between a Target aircraft and an Ownship aircraft at the runway threshold. The paper presents an IM algorithm consisting of the following four modules: (i) Target-Landing-Time Estimation Module, (ii) Ownship-Landing-Time Estimation Module, (iii) Ownship Speed Command Computation Module, and (iv) Ownship Thrust Command Computation Module. The overall guidance module is evaluated on a simulation that models aircraft point-mass dynamics, bank-angle auto-pilot dynamics, pitch-axis auto-pilot dynamics, and engine lag dynamics. The simulation environment also consists of actual atmospheric forecasts and realistic spatio-temporally correlated wind uncertainty models. Results obtained from single case simulation as well as Monte-Carlo simulations are presented in the paper. The modeled scenario consisted of an A320 Target equipped with “Lateral Navigation”/“Vertical Navigation” (LNAV/VNAV) capabilities followed by an A320 Ownship equipped with the IM algorithm. Both aircraft fly the BIGSUR route to SFO airport using a RAP-13 1-hr wind forecast. 500 Monte-Carlo simulations were conducted with realistic wind uncertainty models. The IM algorithm for this case is seen to have a 90% probability landing time error range of 5.9 seconds, compared to the no-IM solution, which has a 90% probability landing time error range of 33.4 seconds.

Bai, Xiaoli↗

Satellite antenna management system and method

The antenna management system and method allow a satellite to communicate with a ground station either directly or by an intermediary of a second satellite, thus permitting communication even when the satellite is not within range of the ground station. The system and method employ five major software components, which are the control and initialization module, the command and telemetry handler module, the contact schedule processor module, the contact state machining module, and the telemetry state machine module. The control and initialization module initializes the system and operates the main control cycle, in which the other modules are called. The command and telemetry handler module handles communication to and from the ground station. The contact scheduler processor module handles the contact entry schedules to allow scheduling of contacts with the second satellite. The contact and telemetry state machine modules handle the various states of the satellite in beginning, maintaining and ending contact with the second satellite and in beginning, maintaining and ending communication with the satellite.

Leath, Timothy T↗

Apollo experience report: Command and service module environmental control system

A comprehensive review is presented of the design philosophy of the Apollo environmental control system together with the development history of the total system and of selected components within the system. In particular, discussions are presented relative to the development history and to the problems associated with the equipment cooling coldplates, the evaporator and its electronic control system, and the space radiator system used for rejection of the spacecraft thermal loads. Apollo flight experience and operational difficulties associated with the spacecraft water system and the waste management system are discussed in detail to provide definition of the problem and the corrective action taken when applicable.

Samonski, F. H., Jr.↗

Apollo experience report: Command and service module communications subsystem

The development of spacecraft communications hardware from design to operation is described. Programs, requirements, specifications, and design approaches for a variety of functions (such as voice, telemetry, television, and antennas) are reviewed. Equipment environmental problems such as vibration, extreme temperature variation, and zero gravity are discussed. A review of the development of managerial techniques used in refining the roles of prime and subcontractors is included. The hardware test program is described in detail as it progressed from breadboard design to manned flight system evaluations. Finally, a series of actions is recommended to managers of similar projects to facilitate administration.

Lattier, E. E., Jr.↗

Apollo 6, Anomaly Report No. 6: Abnormal Structural Performance During Launch Phase

Approximately 2 minutes 13 seconds after lift-off of the Apollo 6 mission, abrupt changes of strain, vibration, and acceleration measurements were indicated in the S-IVB, instrument unit, adapter, lunar module, and command and service modules; photographs showed objects coming from the area of the adapter. The adapter, however, continued to sustain the required loads with no impairment of the mission. The investigation was first focused upon the understanding of the coupled vibration modes and characteristics of the launch vehicle and spacecraft.' Extensive test programs were conducted. It was eventually concluded that the adapter failure was not caused by vibration. Extensive study of the airborne photography and other evidence indicated that a large area of the adapter had lost inner facesheet from the honeycomb sandwich panels. Loads and stresses resulting from vibration were determined to be insufficient to initiate such a failure. The investigation was then directed toward determining the range of pressures that could have been trapped in the Apollo 6 adapter sandwich panels, and toward determining the tolerance of the panels to withstand pressure with various degrees of flaws such as adhesive voids and facesheet dents. The degradation effects of moisture and heat exposure on the adhesive strength were also studied and tested. These tests and analyses led to the conclusion that pressure internal to the sandwich panels could have caused the failure, if a large flaw existed. The pressure buildup would have been caused by aerodynamic heating effects on air and moisture trapped in the panel. The probable cause of the failure was found in the original ultrasonic inspection scan record of the affected adapter panel. In the center of the region where the adapter failed, horizontally along the station 709 panel splice, the record contained two thick anomalous lines extending several feet. Without an X-ray record of this region, the significance of this particular scan record cannot be fully understood. However, since all other evidence had indicated that the adhesive had to be weakened in a rather large area to initiate the failure, the investigation was focused intently upon the station 709 splices of other adapters. Sufficient information was developed to verify that deficient assembly techniques have consistently resulted in abnormalities in the structure at this station. These abnormalities were identified in adapters 12, 13, 14, 15, and 16. Before the splice abnormalities were pinpointed, corrective action was taken to reduce pressure "buildup in the honeycomb panels and to reduce heat degrading effects on the adhesive. This was done by drilling vent holes in the inner facesheet and covering the outer facesheet with cork. The adapters having identified abnormalities in the station 709 splice are being repaired, and the contractor is investigating ways of avoiding these -abnormalities in panels yet to be bonded.

Source record↗

Design development of the Apollo command and service module thrust vector attitude control systems

Development of the Apollo thrust vector control digital autopilot (TVC DAP) was summarized. This is the control system that provided pitch and yaw attitude control during velocity change maneuvers using the main rocket engine on the Apollo service module. A list of ten primary functional requirements for this control system are presented, each being subordinate to a more general requirement appearing earlier on the list. Development process functions were then identified and the essential information flow paths were explored. This provided some visibility into the particular NASA/contractor interface, as well as relationships between the many individual activities.

William H. Peters↗

Apollo experience report: Structural loads due to maneuvers of the command and service module/lunar module

Analyses were performed to determine the structural loads caused by maneuvers of the docked Apollo command and service module/lunar module (CSM/LM). Results of CSM/LM docked interface loads analyses and service-propulsion-system engine support structure load analyses are compared with the structural allowable loads of the CSM/LM docked interface and the service-propulsion-system engine thrust mount, respectively, for different phases of spaceflight operations. An analysis also was performed to investigate the loads that resulted from the failure case in which the LM descent propulsion system is started in the full-throttle position.

Rutkowski, M. J.↗

The Biolink Implantable Telemetry System

Most biotelemetry applications deal with the moderated data rates of biological signals. Few people have studied the problem of transcutaneous data transmission at the rates required by NASA's Life Sciences-Advanced BioTelemetry System (LS-ABTS). Implanted telemetry eliminate the problems associated with wire breaking the skin, and permits experiments with awake and unrestrained subjects. Our goal is to build a low-power 174-216MHz Radio Frequency (RF) transmitter suitable for short range biosensor and implantable use. The BioLink Implantable Telemetry System (BITS) is composed of three major units: an Analog Data Module (ADM), a Telemetry Transmitter Module (TTM), and a Command Receiver Module (CRM). BioLink incorporates novel low-power techniques to implement a monolithic digital RF transmitter operating at 100kbps, using quadrature phase shift keying (QPSK) modulation in the 174-216MHz ISM band. As the ADM will be specific for each application, we focused on solving the problems associated with a monolithic implementation of the TTM and CRM, and this is the emphasis of this report. A system architecture based on a Frequency-Locked Loop (FLL) Frequency Synthesizer is presented, and a novel differential frequency that eliminates the need for a frequency divider is also shown. A self sizing phase modulation scheme suitable for low power implementation was also developed. A full system-level simulation of the FLL was performed and loop filter parameters were determined. The implantable antenna has been designed, simulated and constructed. An implant package compatible with the ABTS requirements is also being proposed. Extensive work performed at 200MHz in 0.5um complementary metal oxide semiconductors (CMOS) showed the feasibility of integrating the RF transmitter circuits in a single chip. The Hajimiri phase noise model was used to optimize the Voltage Controlled Oscillator (VCO) for minimum power consumption. Two test chips were fabricated in a 0.5pm, 3V CMOS process. Measured phase noise for a 1.5mW, 200MHz ring oscillator VCO is -80dBc/Hz at 100KHZ offset, showing good agreement with the theory. We also propose a novel superregenerative receiver architecture for implementing the command receiver. The superregenerative receiver's simplicity, low cost, and low power consumption has made it the receiver of choice for short-distance data communications, remote control and home automation. We present the design of a superregenerative AM receiver implemented in a 0.5um CMOS technology that operates at 433.92MHz and dissipates only 300uW. Further work entails detailed transistor-level design of the FLL and superregenerative receiver and a monolithic implementation of an implantable transceiver in 0.5um CMOS technology.

Betancourt-Zamora, Rafael J.↗

Electron-proton spectrometer: Summary for critical design review

The electron-proton spectrometer (EPS) is mounted external to the Skylab module complex on the command service module. It is designed to make a 2 pi omni-directional measurement of electrons and protons which result from solar flares or enhancement of the radiation belts. The EPS data will provide accurate radiation dose information so that uncertain Relative biological effectiveness factors are eliminated by measuring the external particle spectra. Astronaut radiation safety, therefore, can be ensured, as the EPS data can be used to correct or qualify radiation dose measurements recorded by other radiation measuring instrumentation within the Skylab module complex. The EPS has the capability of measuring and extremely wide dynamic radiation dose rate range, approaching 10 to the 7th power. Simultaneously the EPS has the capability to process data from extremely high radiation fields such as might be encountered in the wake of an intense solar flare.

Source record↗

The Apollo 15 X-ray fluorescence experiment.

The prime purpose of the X-ray fluorescence spectrometer carried in the Scientific Instrument Module of the Command-Service Module was to map the lunar surface with respect to its chemical composition. Results are presented for Al, Mg, and Si as Al/Si and Mg/Si ratios for the various features overflow by the spacecraft. The lunar surface measurements involved observations of the intensity and characteristic energy distribution of the secondary or fluorescent X rays produced by the interaction of solar X rays with the lunar surface. The results showed that the highlands and maria are chemically different, with the highlands having considerably more Al and less Mg than the maria. The mare-highland contact is quite sharp and puts a limit on the amount of horizontal transport of material. The X-ray data suggest that the dominant rock type of the lunar highlands is a plagioclase-rich pyroxene bearing rock probably anorthositic gabbro or feldspathic basalt.

Adler, I.↗

Early results of the ionospheric experiment of the Apollo-Soyuz Test Project

A description is presented of a spacecraft-to-spacecraft Doppler-tracking experiment which was performed by the Smithsonian Astrophysical Observatory on the occasion of the Apollo-Soyuz Test Project (ASTP). The experiment involved the measurement of the relative velocity between the ASTP docking module and the Apollo command service module by a Doppler-tracking method. The objectives of the ionospheric experiment include the measurement of the time changes of the columnar electron content between the two spacecraft. The obtained data can provide a basis for the determination of the horizontal gradients of electron density at the height of 220 km.

Grossi, M. D.↗