Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Structural Sizing of a Composite Transonic Truss-Braced Wing

Accurate finite element modeling (FEM) is a vital part of the modern aircraft design process. As aircraft become increasingly complex, the time-consuming nature of detailed FEM approaches comes at a significant cost to program timeline and budget. In an effort produce modeling efforts that are sufficiently accurate and minimally costly, a proposed FEM approach and optimization scheme for a composite aircraft is explored, including a discussion of the manufacturing constraints of a highly tailored composite panel design. A high-fidelity structural model of a transonic truss-braced wing (TTBW) is generated, and the components are sized by structural optimization to satisfy buckling and strength constraints while subjected to critical maneuver loads. The structural modeling approaches and sizing of a TTBW are discussed, including details for FEM approaches, verification of an approximated FEM approach, a sizing optimization using the optimization software LS-OPT, and a manufacturing trial of integrally stiffened composite panels conducted to explore the validity of highly tailored composites as a design consideration. The results of study discussed herein indicate that the proposed FEM approach is suitable for modeling composite-construction aircraft and for use in sizing optimization. Further efforts regarding integrally stiffened composite panels will indicate the suitability of this method for the integration of highly tailored composite panels into the design and optimization process, given the manufacturability of such panels as shown here.

Finite Element↗

Structural Sizing of a Transonic Truss-Braced Wing

Accurate finite element modeling (FEM) is a vital part of the modern aircraft design process. As aircraft become increasingly complex, the time-consuming nature of detailed FEM approaches comes at a significant cost to program timeline and budget. In an effort produce modeling efforts that are sufficiently accurate and minimally costly, a proposed FEM approach and optimization scheme for a composite aircraft is explored, including a discussion of the manufacturing constraints of a highly tailored composite panel design. A high-fidelity structural model of a transonic truss-braced wing (TTBW) is generated, and the components are sized by structural optimization to satisfy buckling and strength constraints while subjected to critical maneuver loads. The structural modeling approaches and sizing of a TTBW are discussed, including details for FEM approaches, verification of an approximated FEM approach, a sizing optimization using the optimization software LS-OPT, and a manufacturing trial of integrally stiffened composite panels conducted to explore the validity of highly tailored composites as a design consideration. The results of study discussed herein indicate that the proposed FEM approach is suitable for modeling composite-construction aircraft and for use in sizing optimization. Further efforts regarding integrally stiffened composite panels will indicate the suitability of this method for the integration of highly tailored composite panels into the design and optimization process, given the manufacturability of such panels as shown here.

Finite Element↗

Proton Exchange Membrane (PEM) fuel Cell for Space Shuttle

Development of a PEM fuel cell powerplant (PFCP) for use in the Space Shuttle offers multiple benefits to NASA. A PFCP with a longer design life than is delivered currently from the alkaline fuel will reduce Space Shuttle Program maintenance costs. A PFCP compatible with zero-gravity can be adapted for future NASA transportation and exploration programs. Also, the commercial PEM fuel cell industry ensures a competitive environment for select powerplant components. Conceptual designs of the Space Shuttle PFCP have resulted in identification of key technical areas requiring resolution prior to development of a flight system. Those technical areas include characterization of PEM fuel cell stack durability under operational conditions and water management both within and external to the stack. Resolution of the above issues is necessary to adequately control development, production, and maintenance costs for a PFCP.

Hoffman, William C., III↗

Program Options to Explore Ocean Worlds

Including Earth, roughly a dozen water ocean worlds exist in the solar system: the relict worlds Ceres and Mars, vast oceans inside most of the large Jovian and Saturnian icy moons, and Kuiper Belt Objects like Triton, Charon, and Pluto whose geologies are dominated by water and ammonia. Key pieces of the ocean-world science puzzle – which when completed may reveal whether life is widespread in the cosmos, why it exists where it does, and how it originates – are distributed among them. The eventual exploration of all these worlds will yield humanity’s total tangible knowledge about life in the universe, essentially forever. Thus, their exploration has existential significance for humanity’s self-regard, and indeed perhaps of our place in the natural scheme. The matter of planning how to pursue such a difficult and unprecedented exploration opportunity is therefore historic. The technical challenges are formidable, far harder than at Mars: missions to the Jovian and Saturnian ocean worlds are severely power-limited; trip times can be as much as a half decade and decade, respectively. And the science targets are global-scale oceans beneath kilometers of cryogenic ice. Reaching and exploring them would be a multi-generational undertaking, so again it is essential to plan and prepare. Today, we lack the instrumentation, subsystems, and remote operational-intelligence technologies needed to build and use exploration avatars as good as what we can envision needing. Each ocean world holds a piece of the puzzle, but the three priority targets are Europa at Jupiter, and Enceladus and Titan at Saturn. As with the systematic exploration of Mars, exploring these diverse worlds poses a complex technical and programmatic challenge – a strategic challenge – that needs to be designed and managed if each generation is to see its work bear fruit, and if the space science community is to make most effective use of the public money devoted to the quest. Strategic programs benefit from coherence. In only 15 years, the Mars Exploration Program (MEP) has transformed humanity’s view of Mars as a once and future habitable place, a world quite possibly holding relict evidence of life. Finding such evidence, we would study it to know if that life shared an origin common with Earth life. However, life in the ocean worlds could not have shared our origin, so exploring them opens another level in our quest to understand life in the universe: not only to places with vast salt-water seas known to contain organics and hydrothermal seafloors active today, but to places where anything alive cannot be related to us. MEP’s success – from its presence in the public consciousness to its rewriting of planetary habitability – make it an obvious template and source of lessons learned for a viable ocean worlds exploration program (OWEP). Six attributes of the MEP are analyzed for application to a potential OWEP. From this, five hypothetical programmatic scenarios are compared to the default case, and conclusions drawn. A coherent OWEP should have several parts: first, dedicated continuous investment in enabling technologies; and second, two directed-purpose, medium-class (~$1B) missions per decade that conduct pivotal investigations on a documented roadmap. Science could start in 2035, informing development of decadal flagship missions after Europa Clipper, to the places revealed to hold the most promise. The fastest pace of scientific discoveries would require access to high-performance propulsion infrastructure, e.g., the Space Launch System, Falcon Heavy, and high-power in-space solar electric propulsion, all capable of halving trip time. Not including these boosts, such a program would cost about a half-billion dollars more per year than NASA’s existing mission portfolio; the program architecture funded today cannot deliver a strategic OWEP while also sustaining balance among other solar system exploration priorities and opportunities.

Naderi, F.↗

How soon to the moon/ques/

Stretch-out of Apollo program, evaluating cost aspect and space environment effects on time scheduling

PROGRAM MANAGEMENT↗

Space shuttle orbital maneuvering engine platelet injector program

A platelet face injector for the Orbit Maneuvering Engine (OME) on the space shuttle was evaluated as a means of obtaining additional design margin and lower cost. The program was conducted in three phases. The first phase evaluated single injection elements, or unielements; it involved visual flow studies, mixing experiments using propellant simulants, and hot firings to assess combustion efficiency, chamber wall compatibility, and injector face temperatures. In the second phase, subscale units producing 600 lbf thrust were used to further evaluate the orifice patterns chosen on the basis of unielement testing. In addition to combustion efficiency, chamber and injector heat transfer, the subscale testing provided a preliminary indication of injector stability. Full scale testing of the selected patterns at 6,000 lbf thrust was performed in the third phase. Performance, heat transfer, and combustion stability were evaluated over the anticipated range of OMS operating conditions. The effects on combustion stability of acoustic cavity configuration, including cavity depth, open area, inlet contour, and other parameters, were investigated.

Source record↗

Local governments LANDSAT applications program

The approach used to develop the internal capabilities of local governments to handle and evaluate LANDSAT data included remote sensing training, development of a low-cost digital image processing system, and technical assistance. Cost sharing, program management and coordination, and networking were also employed to address problems related to land use, water resources, environmental assessment, and air quality as experienced by urban planners. Local experiences gained in Atlanta, Georgia; Henrico County, Virginia; Oklahoma City; Oklahoma; and San Jose, California are described. Policy recommendations formulated for transferring remote sensing technologies to local governments are included.

Source record↗

Cost analysis of life sciences experiments and subsystems

Cost estimates for experiments and subsystems flown in the Spacelab were established. Ten experiments were cost analyzed. Estimated cost varied from $650,000 for the hardware development of the SPE water electrolysis experiment to $78,500,000 for the development and operation of a representative life sciences laboratory program. The cost of subsystems for thermal, atmospheric and trace contaminants control of the Spacelab internal atmosphere was also estimated. Subsystem cost estimates were based on the utilization of existing components developed in previous space programs whenever necessary.

Yakut, M. M.↗

The ASSESS program documenting and evaluating low cost techniques for conducting research in the flight environment

The Airborne Science Office (ASO) of the Ames Research Center has for 10 years operated an airborne scientific research program in infrared astronomy and other disciplines. The Lear Jet, CV-990, and C-141 flying laboratories are flown by ASO crews, while the major responsibility for defining, developing, and operating the experimental equipment is placed on individual researchers, who have included scientists from many countries. The ASSESS (Airborne Science/Shuttle Experiment Systems Simulation) program consists of two phases: Phase A documents the present management and operational practices of the ASO, and Phase B consists of airborne research missions constrained (for example, by crew confinement) to simulate certain aspects of experimental operations on Shuttle/Spacelab missions. Various parallels between the Airborne Science Program and Spacelab are pointed out and their applications to Spacelab planning are discussed.

Weaver, L. B.↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5). Volume 3: Cost estimates and work breakdown structure/dictionary, phase 1 and 2

Technology payoffs of representative ground based (Phase 1) and space based (Phase 2) mid lift/drag ratio aeroassisted orbit transfer vehicles (AOTV) were assessed and prioritized. A narrative summary of the cost estimates and work breakdown structure/dictionary for both study phases is presented. Costs were estimated using the Grumman Space Programs Algorithm for Cost Estimating (SPACE) computer program and results are given for four AOTV configurations. The work breakdown structure follows the standard of the joint government/industry Space Systems Cost Analysis Group (SSCAG). A table is provided which shows cost estimates for each work breakdown structure element.

Source record↗

Fiberglass composite blades for the 2 MW Mod-1 wind turbine generator

In mid-1979, NASA contracted with Kaman Aerospace Corporation for the design, manufacture, and ground testing of two 100 foot composite rotor blades intended for operation on the Mod-1 wind turbine. The Mod-1 blades have been completed and are currently stored at the Kaman facility. The design, tooling, fabrication, and testing phases which have been carried out to date, as well as testing still planned are described. Discussed are differences from the 150 foot blade which were introduced for cost and manufacturing improvement purposes. Also included is a description of the lightning protection system installed in the blades, and its development program. Actual costs and manhours expended for Blade No. 2 are provided as a base, along with a projection of costs for the blade in production. Finally, cost drivers are identified relative to future designs.

Batesole, W. R.↗

The solar heating and cooling commercial demonstration program: Some early problems and results

The activities of the Marshall Space Flight Center of the National Aeronautics and Space Administration in the technical evaluation of proposals, contracts definitions, and program management details are defined and discussed. The significant problems were summarized in both technical and management aspects of the program. It was concluded that the program has significantly stimulated additional solar effort by the program participants. It was also concluded that the use of conventional construction industry organization with design/competitive bid procedures and standards has maintained a cost effective program.

Middleton, R. L.↗

The vehicle design evaluation program - A computer-aided design procedure for transport aircraft

The vehicle design evaluation program is described. This program is a computer-aided design procedure that provides a vehicle synthesis capability for vehicle sizing, external load analysis, structural analysis, and cost evaluation. The vehicle sizing subprogram provides geometry, weight, and balance data for aircraft using JP, hydrogen, or methane fuels. The structural synthesis subprogram uses a multistation analysis for aerodynamic surfaces and fuselages to develop theoretical weights and geometric dimensions. The parts definition subprogram uses the geometric data from the structural analysis and develops the predicted fabrication dimensions, parts material raw stock buy requirements, and predicted actual weights. The cost analysis subprogram uses detail part data in conjunction with standard hours, realization factors, labor rates, and material data to develop the manufacturing costs. The program is used to evaluate overall design effects on subsonic commercial type aircraft due to parameter variations.

Oman, B. H.↗

Earth Observatory Satellite system definition study. Report 4: Low cost management approach and recommendations

An analysis of low cost management approaches for the development of the Earth Observatory Satellite (EOS) is presented. The factors of the program which tend to increase costs are identified. The NASA/Industry interface is stressed to show how the interface can be improved to produce reduced program costs. Techniques and examples of cost reduction which can be applied to the EOS program are tabulated. Specific recommendations for actions to be taken to reduce costs in prescribed areas are submitted.

Source record↗

Sat V growth and flexibility.

Uprated Saturn V vehicles and intermediate payload Saturn vehicles, studying costs, flexibility, performance and boost-assist components

SATURN V LAUNCH VEHICLE↗

Hardware test program for evaluation of baseline range-range rate sensor concept

The baseline range/range rate sensor concept was evaluated. The Interrupted CW (ICW) mode of operation continued with emphasis on establishing the sensitivity of the video portion of the receiver was 7 dB less than the theoretical value. This departs from test results of previous implementations in which achieved sensitivity was within 1.5 to 2 dB of the theoretical value. Several potential causes of this discrepancy in performance were identified and are scheduled for further investigation. Results indicate that a cost savings in both per unit and program costs are realizable by eliminating one of the modes of operation. An acquisition (total program) cost savings of approximately 10% is projected by eliminating the CW mode of operation. The modified R/R sensor would operate in the ICW mode only and would provide coverage from initial acquisition at 12 nmi to within a few hundred feet of the OMV. If the ICW mode only were selected, then an accompanying sensor would be required to provide coverage from a few hundred feet to docking.

Source record↗

A Near-Term, High-Confidence Heavy Lift Launch Vehicle

The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

Rothschild, William J.↗