Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communication aggregation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Communication: Orientational self-ordering of spin-labeled cholesterol analogs in lipid bilayers in diluted conditions

Lipid-cholesterol interactions are responsible for different properties of biological membranes including those determining formation in the membrane of spatial inhomogeneities (lipid rafts). To get new information on these interactions, electron spin echo (ESE) spectroscopy, which is a pulsed version of electron paramagnetic resonance (EPR), was applied to study 3β-doxyl-5α-cholestane (DCh), a spin-labeled analog of cholesterol, in phospholipid bilayer consisted of equimolecular mixture of 1,2-dipalmitoyl-sn-glycero-3-phosphocholine and 1,2-dioleoyl-sn-glycero-3-phosphocholine. DCh concentration in the bilayer was between 0.1 mol.% and 4 mol.%. For comparison, a reference system containing a spin-labeled 5-doxyl-stearic acid (5-DSA) instead of DCh was studied as well. The effects of “instantaneous diffusion” in ESE decay and in echo-detected (ED) EPR spectra were explored for both systems. The reference system showed good agreement with the theoretical prediction for the model of spin labels of randomly distributed orientations, but the DCh system demonstrated remarkably smaller effects. The results were explained by assuming that neighboring DCh molecules are oriented in a correlative way. However, this correlation does not imply the formation of clusters of cholesterol molecules, because conventional continuous wave EPR spectra did not show the typical broadening due to aggregation of spin labels and the observed ESE decay was not faster than in the reference system. So the obtained data evidence that cholesterol molecules at low concentrations in biological membranes can interact via large distances of several nanometers which results in their orientational self-ordering.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

SHAPA: An interactive software tool for protocol analysis applied to aircrew communications and workload

As modern transport environments become increasingly complex, issues such as crew communication, interaction with automation, and workload management have become crucial. Much research is being focused on holistic aspects of social and cognitive behavior, such as the strategies used to handle workload, the flow of information, the scheduling of tasks, the verbal and non-verbal interactions between crew members. Traditional laboratory performance measures no longer sufficiently meet the needs of researchers addressing these issues. However observational techniques are better equipped to capture the type of data needed and to build models of the requisite level of sophistication. Presented here is SHAPA, an interactive software tool for performing both verbal and non-verbal protocol analysis. It has been developed with the idea of affording the researchers the closest possible degree of engagement with protocol data. The researcher can configure SHAPA to encode protocols using any theoretical framework or encoding vocabulary that is desired. SHAPA allows protocol analysis to be performed at any level of analysis, and it supplies a wide variety of tools for data aggregation, manipulation. The output generated by SHAPA can be used alone or in combination with other performance variables to get a rich picture of the influences on sequences of verbal or nonverbal behavior.

James, Jeffrey M.↗

Addressing the Challenges of Anomaly Detection for Cyber Physical Energy Grid Systems

The consolidation of cyber communications networks and physical control systems within the energy smart grid introduces a number of new risks. Unfortunately, these risks are largely unknown and poorly understood, yet include very high impact losses from attack and component failures. One important aspect of risk management is the detection of anomalies and changes. However, anomaly detection within cyber security remains a difficult, open problem, with special challenges in dealing with false alert rates and heterogeneous data. Furthermore, the integration of cyber and physical dynamics is often intractable. And, because of their broad scope, energy grid cyber-physical systems must be analyzed at multiple scales, from individual components, up to network level dynamics. We describe an improved approach to anomaly detection that combines three important aspects. First, system dynamics are modeled using a reduced order model for greater computational tractability. Second, a probabilistic and principled approach to anomaly detection is adopted that allows for regulation of false alerts and comparison of anomalies across heterogeneous data sources. Third, a hierarchy of aggregations are constructed to support interactive and automated analyses of anomalies at multiple scales.

Anomaly Detection↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Monitoring Regional Forest Disturbances across the US with near Real Time MODIS NDVI Products Resident to the ForWarn Forest Threat Early Warning System

Forest threats across the US have become increasingly evident in recent years. Sometimes these have resulted in regionally evident disturbance progressions (e.g., from drought, bark beetle outbreaks, and wildfires) that can occur across multiyear durations and have resulted in extensive forest overstory mortality. In addition to stand replacement disturbances, other forests are subject to ephemeral, sometimes yearly defoliation from various insects and varying types and intensities of ephemeral damage from storms. Sometimes, after prolonged severe disturbance, signs of recovery in terms of Normalized Difference Vegetation Index (NDVI) can occur. The growing prominence and threat of forest disturbances in part have led to the formation and implementation of the 2003 Healthy Forest Restoration Act which mandated that national forest threat early warning system be developed and deployed. In response, the US Forest Service collaborated with NASA, DOE Oakridge National Laboratory, and the USGS Eros Data Center to build and roll-out the near real time ForWarn early warning system for monitoring regionally evident forest disturbances. Given the diversity of disturbance types, severities, and durations, ForWarn employs multiple historical baselines that are used with current NDVI to derive a suite of six forest change products that are refreshed every 8 days. ForWarn employs daily quarter kilometer MODIS NDVI data from the Aqua and Terra satellites, including MOD13 data for deriving historical baseline NDVIs and eMODIS 7 NDVI for compiling current NDVI. In doing so, the Time Series Product Tool and the Phenological Parameters Estimation Tool are used to temporally de-noise, fuse, and aggregate current and historical MODIS NDVIs into 24 day composites refreshed every 8 days with 46 dates of products per year. The 24 day compositing interval enables disturbances to be detected, while minimizing the frequency of residual atmospheric contamination. Forest change products are computed versus the previous 1, previous 3, and all previous years in the MODIS record for a given 24 day interval. Other "weekly" forest change products include one computed using an adaptive length compositing method for quicker detection of disturbances, two others that adjust for seasonal fluctuations in normal vegetation phenology (e.g., early versus late springs). This overall approach enables forest disturbance dynamics from a variety of regionally evident biotic and abiotic forest disturbances to be viewed and assessed through the calendar year. The change products are also being utilized for forest change trend analysis and for developing regional forest overstory mortality products. ForWarn's forest change products are used to alert forest health specialists about new forest disturbances. Such alerts are also typically based on available Landsat, aerial, and ground data as well as communications with forest health specialists and previous experience. ForWarn products have been used to detect and track many types of regional disturbances to multiple forest types, including defoliation from caterpillars and severe storms, as well as mortality from both biotic and abiotic agents (e.g., bark beetles, drought, fire, anthropogenic clearing). ForWarn offers products that could be combined with other geospatial data on forest biomass to assess forest disturbance carbon impacts within the conterminous US.

Spruce, Joseph P.↗

The integrated Status and Effectiveness Monitoring Program : U.S. Forest Service Fish Abundance and Steelhead Redd Surveys Annual Report : January 1 - December 31, 2008.

This contract report is one of a series of reports that document implementation components of the Bonneville Power Administration's (BPA) funded project: Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00, Chris Jordan, NOAA-NWFSC project sponsor). Other components of the project are separately reported, as explained below. The ISEMP project has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical data management, communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring, and Evaluation (RME) program to assess the status of anadromous salmonids populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods requires the testing of multiple approaches. Thus, ISEMP has adopted an approach to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot areas, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall ISEMP, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Variation (Status and Trend) of Fine Sediment in Spawning Gravel within the Entiat River Subbasin : July 2008 - October 2008.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance; and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.

13 HYDRO ENERGY↗

The Integrated Status and Effectiveness Monitoring Program : Expansion of Existing Smolt Trapping Program and Steelhead Spawner Surveys : March 1st, 2008 - February 28th, 2009.

The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot subbasins, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and; (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g., Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall Integrated Status and Effectiveness Monitoring Program, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring, and Evaluation.

13 HYDRO ENERGY↗

The role of radiation hard solar cells in minimizing the costs of global satellite communication systems

An analysis embodied in a PC computer program is presented, which quantitatively demonstrates how the availability of radiation hard solar cells can help minimize the cost of a global satellite communications system. An important distinction between the currently proposed systems, such as Iridium, Odyssey and Ellipsat, is the number of satellites employed and their operating altitudes. Analysis of the major costs associated with implementing these systems shows that operation at orbital altitudes within the earth's radiation belts (10(exp 3) to 10(exp 4)km) can reduce the total cost of a system by several hundred percent, so long as radiation hard components including solar cells can be used. A detailed evaluation of the predicted performance of photovoltaic arrays using several different planar solar cell technologies is given, including commercially available Si and GaAs/Ge, and InP/Si which is currently under development. Several examples of applying the program are given, which show that the end of life (EOL) power density of different technologies can vary by a factor of ten for certain missions. Therefore, although a relatively radiation-soft technology can usually provide the required EOL power by simply increasing the size of the array, the impact upon the total system budget could be unacceptable, due to increased launch and hardware costs. In aggregate, these factors can account for more than a 10% increase in the total system cost. Since the estimated total costs of proposed global-coverage systems range from $1B to $9B, the availability of radiation-hard solar cells could make a decisive difference in the selection of a particular constellation architecture.

Summers, Geoffrey P.↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

Dye doped concentric shell nanoparticles for enhanced photophysical performance of downconverting light emitting diodes

In this study, we examined the potential for perylene dye doped nanoparticles to enhance Light Emitting Diodes (LED) efficacy by minimizing π–π intermolecular aggregation, and enhancing photoluminescence and photostability of the dye molecules in the solid state. Towards this end, we encapsulated perylene dyes, suitably modified with a reactive silica precursor, into silica nanoparticles within a silica-dye-silica concentric layered shell. We found that the fluorescent yield was higher when the dye was embedded in a buried concentric shell within the silica nanoparticles (NPs) compared to an undoped shell/dye doped core nanoparticle morphology or unencapsulated dye with the same net dye concentration in solution. A strong dependence of relative quantum yield on dye doping concentration in the silica-dye-silica nanoparticles was observed. The uniform ~ 100 nm large silica-dye-silica layered nanoparticles were used to prepare transparent dye doped silica nanoparticle/silicone nanocomposites. Dye doped silica nanoparticle/silicone nanocomposites exhibited higher photostability than the unencapsulated dye samples during long time aging tests under a blue LED with a wavelength of 455 nm at 300 ± 3% mA for 24 h. Novel dye doped layered silica NPs and their nanocomposites offer scope for developing organic luminescent materials into efficient and color-tunable light emitters for low-cost display, lighting, and optical communication applications.

42 ENGINEERING↗

Strategic Planning of Efficient Oceanic Flights

The efficiency of oceanic flights is low due to limited navigational and communication equipment, congestion and airspace restrictions. The availability of Automated Dependent Surveillance-Broadcast (ADS-B) and other improvements provides opportunity for better strategic planning of trajectories. Transatlantic flights between US and Europe constitute one of the busiest oceanic airspace regions in the world. This paper examines the benefits of a wind-optimal trajectory concept with a strategic de-confliction component compared to the current flight planning using the North Atlantic Tracks. The methodology generates a wind-optimal route for each aircraft and a strategic reduction in the potential conflicts between aircraft by a combination of small adjustments to departure times and rerouting. The de-confliction is achieved by optimization techniques involving simulated annealing with local gradient searching. The fuel burn for the tracks in today's Organized Track System are compared with the corresponding quantities for the wind-optimized routes to evaluate the potential benefits of flying wind-optimal routes in North Atlantic Airspace. The analysis is based on air traffic between US and Europe during July 2012. The potential fuel savings depend on existing inefficiencies in current flight plans, atmospheric conditions and location of the city-pairs. The paper provides both aggregate results and detailed examination of some of the most popular city-pairs. Results show that strategic planning can improve the efficiency of flight trajectories by 3 to 5 depending on city-pairs and aircraft type. This translates into a potential fuel savings in the range of (420-970) kg per flight for a Boeing 767-300, the most widely used aircraft between the city-pairs in this study.

oceanic operations↗

Smarter Grid Solutions | National Renewable Energy Laboratory: Active Management Integration: June 2015 - November 2016

This report presents the project results for the NREL INTEGRATE demonstration project: Active Network Management (ANM) Integration. Consistent with the INTEGRATE program's objective of increasing the grid's clean energy hosting capacity and providing grid services in a holistic manner, the project demonstrated the use of ANM to enable very high penetrations of solar PV and wind energy systems. Results obtained using a representative North American distribution system showed ANM's autonomous distributed control doubled the interconnected wind and solar systems by managing thermal and voltage constraints in real-time. These generators flexibly interconnected to the grid via ANM's end-to-end control architecture, and were managed and coordinated with other smart distributed energy resources (DER; e.g. EVs, battery ESS, controllable load) to unlock the grid's dynamic hosting capacity. As a smart grid application to standardize grid integration of diverse renewable generation sources, ANM provides the industry with a scalable, cost-effective alternative to traditional transmission and distribution (T&D) reinforcements. This project considered three use cases of the application of ANM: a Smart Home demonstration of ANM control of residential scale devices (PV, EV, and battery ESS); a Smart Campus demonstration of high penetration megawatt-scale DER (PV, EVs, battery ESS, and controllable load) behind a single point-of-common-coupling (PCC), and a Smart Distribution demonstration that combined prior use cases along with additional community/utility-scale DER at very high aggregate penetration levels. The Smart Distribution use case provided an integrated perspective of ANM across all distribution grid DER device scales (incorporating aggregated Smart Homes and the Smart Campus) in order to showcase how these devices can support smart grid services to manage DER related constraints in a safe and reliable manner; and likewise how ANM integrates with grid modernization initiatives. The ANM system was deployed in NREL's Energy Systems Integration Facility (ESIF), and project industry advisors attended an on-site demonstration and a set of workshops in order to review project outcomes and evaluate the relevance of ANM for increasing the grid hosting capacity. The outcomes of this effort include an assessment of opportunities for field deployment of ANM to address existing interconnection challenges, as well as consolidating project advisor suggestions for investment in ANM and potential future pilots for more advanced schemes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Functional characterization of natural variants found on the major stress inducible 70-kDa heat shock gene, HSPA1A, in humans

Highlights: • Mutations, R36C, I74T, and F592S, lower the rate of ATP hydrolysis of HSPA1A. • S16P, R36C, I480N, and F592S alter the interaction of HSPA1A and protein substrates. • R36C increases while the I480N decreases the refolding of heat-denatured luciferase. • R36C, I480N, and F592S failed to protect cells from aggregated protein stress. In this report, we investigated the effects of natural single nucleotide polymorphisms on the function of HSPA1A, the major stress-inducible Hsp70 gene in humans. We first established that all mutant proteins retain their ability to hydrolyze ATP, but three of them had a significantly lower rate of ATP hydrolysis as compared to the wild-type (WT) protein. We also used Isothermal Titration Calorimetry and found that although all mutants bind to protein substrate with dissociation constants similar to the WT protein, four of them had increased reaction entropies. We also tested whether these mutations affect the ability of HSPA1A to refold heat-denatured luciferase. These assays revealed that one mutation resulted in significantly lower levels while a second one resulted in higher levels of the refolded enzyme. We then determined whether the mutations affected the ability of HSPA1A to prevent apoptosis caused by poly-glutamine carrying huntingtin proteins. This assay determined that three of the mutations caused increased cell apoptosis as compared to the WT. Our results reveal that although none of these naturally occurring mutations exists on positions of known function, some alter the molecular chaperone activities of HSPA1A most probably by affecting the allosteric communication between its two major domains.

60 APPLIED LIFE SCIENCES↗

2023 Artemis Crew Health and Performance System Model Development

While the NASA Human Research Program (HRP) utilizes a Crew Health and Performance (CHP) System to represent all the Agency’s efforts to ensure the health and performance of NASA astronauts, there is no shared mental model of a CHP system at NASA. Some groups may consider a CHP system to be only a medical kit, while others may not be using the concept at all. To facilitate the integration of functions and capabilities to ensure astronaut health and performance during vehicle development, HRP has proposed a CHP Shared Mental Model derived from the NASA Human Health, Medical, and Performance Spaceflight Standards (NASA-STD-3001 Vol.1/Vol.2). [1] Even though many vehicle, ground, and communication systems as well as mission operations are modeled for the Artemis Campaigns, no mission level CHP system model was created to achieve the intent of the HRP CHP Shared Mental Model. The lack of this model renders it difficult to visualize and understand how the many programs work together to provide the necessary cross program functions and capabilities to ensure the health and performance of the crew throughout an Artemis mission. For this purpose, the Exploration Medical Capability (ExMC) element of HRP developed a CHP system model for the Artemis III and IV missions to provide a view of how each program contributes to and interacts with the overall CHP system. To develop the 2023 Artemis CHP system model, ExMC leveraged existing data and models from the Moon to Mars Program Office, the Office of the Chief Health and Medical Officer (OCHMO) and the Orion, Gateway, Extravehicular Activity and Human Surface Mobility (EHP) and Human Landing System (HLS) programs. By using a Model-Based Systems Engineering (MBSE) approach, existing requirements, functions, and concepts of operations were combined to create a single system model focused on representing CHP from the launch to the return to Earth segments of the Artemis III and IV missions. Additionally, by incorporating the HRP Systems Platform for Aggregating and Relating Capabilities, or SPARC tool, the data from the programs was also related back to the 2nd volume of the NASA Human Health, Medical, and Performance Spaceflight Standard (NASA-STD-3001, Vol.2) and the human system risks identified by the Human System Risk Board (HSRB). The first version of the 2023 Artemis CHP system model was baselined in Fall of 2023 after the model was demonstrated to be a potentially useful tool for systems engineers integrating CHP capabilities in vehicle development as well as members of the Health and Medical Technical Authority providing oversight of those programs. The model may also be useful to any stakeholder of astronaut health and performance by providing insights on how an Artemis mission satisfies the NASA Human Health, Medical, and Performance Spaceflight Standards as well as how they mitigate the HSRB Human System Risks. This presentation highlights how the model was developed and the possible benefits of the model. [1] NASA HRP (2022), Crew Health and Performance System Whitepaper

Systems engineering↗

2023 Artemis Crew Health and Performance (CHP) System Model Development

While the NASA Human Research Program (HRP) utilizes a Crew Health and Performance (CHP) System to represent all the Agency’s efforts to ensure the health and performance of NASA astronauts, there is no shared mental model of a CHP system at NASA. Some groups may consider a CHP system to be only a medical kit, while others may not be using the concept at all. To facilitate the integration of functions and capabilities to ensure astronaut health and performance during vehicle development, HRP has proposed a CHP Shared Mental Model derived from the NASA Human Health, Medical, and Performance Spaceflight Standards (NASA-STD-3001 Vol.1/Vol.2). [1] Even though many vehicle, ground, and communication systems as well as mission operations are modeled for the Artemis Campaigns, no mission level CHP system model was created to achieve the intent of the HRP CHP Shared Mental Model. The lack of this model renders it difficult to visualize and understand how the many programs work together to provide the necessary cross program functions and capabilities to ensure the health and performance of the crew throughout an Artemis mission. For this purpose, the Exploration Medical Capability (ExMC) element of HRP developed a CHP system model for the Artemis III and IV missions to provide a view of how each program contributes to and interacts with the overall CHP system. To develop the 2023 Artemis CHP system model, ExMC leveraged existing data and models from the Moon to Mars Program Office, the Office of the Chief Health and Medical Officer (OCHMO) and the Orion, Gateway, Extravehicular Activity and Human Surface Mobility (EHP) and Human Landing System (HLS) programs. By using a Model-Based Systems Engineering (MBSE) approach, existing requirements, functions, and concepts of operations were combined to create a single system model focused on representing CHP from the launch to the return to Earth segments of the Artemis III and IV missions. Additionally, by incorporating the HRP Systems Platform for Aggregating and Relating Capabilities, or SPARC tool, the data from the programs was also related back to the 2nd volume of the NASA Human Health, Medical, and Performance Spaceflight Standard (NASA-STD-3001, Vol.2) and the human system risks identified by the Human System Risk Board (HSRB). The first version of the 2023 Artemis CHP system model was baselined in Fall of 2023 after the model was demonstrated to be a potentially useful tool for systems engineers integrating CHP capabilities in vehicle development as well as members of the Health and Medical Technical Authority providing oversight of those programs. The model may also be useful to any stakeholder of astronaut health and performance by providing insights on how an Artemis mission satisfies the NASA Human Health, Medical, and Performance Spaceflight Standards as well as how they mitigate the HSRB Human System Risks. This presentation highlights how the model was developed and the possible benefits of the model. [1] NASA HRP (2022), Crew Health and Performance System Whitepaper

Systems engineering↗

NREL Integrate: RCS-4-42326

OMNETRIC Corp., Duke Energy, CPS Energy, and the University of Texas at San Antonio (UTSA) created a project team to execute the project 'OpenFMB Reference Architecture Demonstration.' The project included development and demonstration of concepts that will enable the electric utility grid to host larger penetrations of renewable resources. The project concept calls for the aggregation of renewable resources and loads into microgrids and the control of these microgrids with an implementation of the OpenFMB Reference Architecture. The production of power from the renewable resources that are appearing on the grid today is very closely linked to the weather. The difficulty of forecasting the weather, which is well understood, leads to difficulty in forecasting the production of renewable resources. The current state of the art in forecasting the power production from renewables (solar PV and wind) are accuracies in the range of 12-25 percent NMAE. In contrast the demand for electricity aggregated to the system level, is easier to predict. The state of the art of demand forecasting done, 24 hours ahead, is about 2-3% MAPE. Forecasting the load to be supplied from conventional resources (demand minus generation from renewable resources) is thus very hard to forecast. This means that even a few hours before the time of consumption, there can be considerable uncertainty over what must be done to balance supply and demand. Adding to the problem of difficulty of forecasting, is the reality of the variability of the actual production of power from renewables. Due to the variability of wind speeds and solar insolation, the actual output of power from renewable resources can vary significantly over a short period of time. Gusts of winds result is variation of power output of wind turbines. The shadows of clouds moving over solar PV arrays result in the variation of power production of the array. This compounds the problem of balancing supply and demand in real time. Establishing a control system that can manage distribution systems with large penetrations of renewable resources is difficult due to two major issues: (1) the lack of standardization and interoperability between the vast array of equipment in operation and on the market, most of which use different and proprietary means of communication and (2) the magnitude of the network and the information it generates and consumes. The objective of this project is to provide the industry with a design concept and tools that will enable the electric power grid to overcome these barriers and support a larger penetration of clean energy from renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗