Search NASA⌕ Search

SEARCH · Search NASA

Results for “DESIGN PHASE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Novel phase diagram behavior and materials design in heterostructural semiconductor alloys

Structure and composition control the behavior of materials. Isostructural alloying is historically an extremely successful approach for tuning materials properties, but it is often limited by binodal and spinodal decomposition, which correspond to the thermodynamic solubility limit and the stability against composition fluctuations, respectively. We show that heterostructural alloys can exhibit a markedly increased range of metastable alloy compositions between the binodal and spinodal lines, thereby opening up a vast phase space for novel homogeneous single-phase alloys. We distinguish two types of heterostructural alloys, that is, those between commensurate and incommensurate phases. Because of the structural transition around the critical composition, the properties change in a highly nonlinear or even discontinuous fashion, providing a mechanism for materials design that does not exist in conventional isostructural alloys. The novel phase diagram behavior follows from standard alloy models using mixing enthalpies from first-principles calculations. Furthermore, thin-film deposition demonstrates the viability of the synthesis of these metastable single-phase domains and validates the computationally predicted phase separation mechanism above the upper temperature bound of the nonequilibrium single-phase region.

14 SOLAR ENERGY↗

HOM frequency control of SRF cavity in high current ERLs

The acceleration of high-current beam in Superconducting Radio Frequency (SRF) cavities is a challenging but essential for a variety of advanced accelerators. SRF cavities should be carefully designed to minimize the High Order Modes (HOM) power generated in the cavities by the beam current. The reduction of HOM power we demonstrate in a particular case can be quite large. This paper presents a method to systematically control the HOM resonance frequencies in the initial design phase to minimize the HOM power generation. This method is expected to be beneficial for the design of high SRF cavities addressing a variety of Energy Recovery Linac (ERL) applications.

43 PARTICLE ACCELERATORS↗

ECLSS predictive monitoring

On Space Station Freedom (SSF), design iterations have made clear the need to keep the sensor complement small. Along with the unprecendented duration of the mission, it is imperative that decisions regarding placement of sensors be carefully examined and justified during the design phase. In the ECLSS Predictive Monitoring task, we are developing AI-based software to enable design engineers to evaluate alternate sensor configurations. Based on techniques from model-based reasoning and information theory, the software tool makes explicit the quantitative tradeoffs among competing sensor placements, and helps designers explore and justify placement decisions. This work is being applied to the Environmental Control and Life Support System (ECLSS) testbed at MSFC to assist design personnel in placing sensors for test purposes to evaluate baseline configurations and ultimately to select advanced life support system technologies for evolutionary SSF.

Doyle, Richard J.↗

Integrated topology and shape optimization in structural design

Structural optimization procedures usually start from a given design topology and vary its proportions or boundary shapes to achieve optimality under various constraints. Two different categories of structural optimization are distinguished in the literature, namely sizing and shape optimization. A major restriction in both cases is that the design topology is considered fixed and given. Questions concerning the general layout of a design (such as whether a truss or a solid structure should be used) as well as more detailed topology features (e.g., the number and connectivities of bars in a truss or the number of holes in a solid) have to be resolved by design experience before formulating the structural optimization model. Design quality of an optimized structure still depends strongly on engineering intuition. This article presents a novel approach for initiating formal structural optimization at an earlier stage, where the design topology is rigorously generated in addition to selecting shape and size dimensions. A three-phase design process is discussed: an optimal initial topology is created by a homogenization method as a gray level image, which is then transformed to a realizable design using computer vision techniques; this design is then parameterized and treated in detail by sizing and shape optimization. A fully automated process is described for trusses. Optimization of two dimensional solid structures is also discussed. Several application-oriented examples illustrate the usefulness of the proposed methodology.

Bremicker, M.↗

Iowa satellite project ISAT-1

Satellite systems to date have been mainly scientific in nature. Only a few systems have been of direct use to the public such as for telephone or television transmission. Space enterprises have remained a mystery to the general public and beyond the reach of the small business community. The result is a less than supportive public when it comes to space activities. The purpose of the ISAT-1 program is to develop a small and relatively inexpensive satellite that will serve the State of Iowa, primarily for educational purposes. It will provide products, services, and activities that will be educational, practical, and useful for a large number for people. The emphasis is on public awareness, 'space literacy', and routine practical applications rather than high technology. The initial conceptual design phase was complete when the current team took over the project. Some areas of the conceptual design were taken a little farther, but for the most part this team started at the detailed design stage.

Source record↗

Achieving the Proper Balance Between Crew and Public Safety

A paramount objective of all human-rated launch and reentry vehicle developers is to ensure that the risks to both the crew onboard and the public are minimized within reasonable cost, schedule, and technical constraints. Past experience has shown that proper attention to range safety requirements necessary to ensure public safety must be given early in the design phase to avoid additional operational complexities or threats to the safety of people onboard, and the design engineers must give these requirements the same consideration as crew safety requirements. For human spaceflight, the primary purpose and operational concept for any flight safety system is to protect the public while maximizing the likelihood of crew survival. This paper will outline the policy considerations, technical issues, and operational impacts regarding launch and reentry vehicle failure scenarios where crew and public safety are intertwined and thus addressed optimally in an integrated manner. An overview of existing range and crew safety policy requirements will be presented. Application of these requirements and lessons learned from both the Space Shuttle and Constellation Programs will also be discussed. Using these past programs as examples, the paper will detail operational, design, and analysis approaches to mitigate and balance the risks to people onboard and in the public. Manned vehicle perspectives from the Federal Aviation Administration (FAA) and Air Force organizations that oversee public safety will be summarized as well. Finally, the paper will emphasize the need to factor policy, operational, and analysis considerations into the early design trades of new vehicles to help ensure that both crew and public safety are maximized to the greatest extent possible.

Gowan, John↗

The Application of the Human Engineering Modeling and Performance Laboratory for Space Vehicle Ground Processing Tasks at Kennedy Space Center

The introduction of United Space Alliance's Human Engineering Modeling and Performance Laboratory began in early 2007 in an attempt to address the problematic workspace design issues that the Space Shuttle has imposed on technicians performing maintenance and inspection operations. The Space Shuttle was not expected to require the extensive maintenance it undergoes between flights. As a result, extensive, costly resources have been expended on workarounds and modifications to accommodate ground processing personnel. Consideration of basic human factors principles for design of maintenance is essential during the design phase of future space vehicles, facilities, and equipment. Simulation will be needed to test and validate designs before implementation.

Woodbury, Sarah K.↗

Augmenting Parametric Optimal Ascent Trajectory Modeling with Graph Theory

It has been well documented that decisions made in the early stages of Conceptual and Pre-Conceptual design commit up to 80% of total Life-Cycle Cost (LCC) while engineers know the least about the product they are designing [1]. Once within Preliminary and Detailed design however, making changes to the design becomes far more difficult to enact in both cost and schedule. Primarily this has been due to a lack of detailed data usually uncovered later during the Preliminary and Detailed design phases. In our current budget-constrained environment, making decisions within Conceptual and Pre-Conceptual design which minimize LCC while meeting requirements is paramount to a program's success. Within the arena of launch vehicle design, optimizing the ascent trajectory is critical for minimizing the costs present within such concerns as propellant, aerodynamic, aeroheating, and acceleration loads while meeting requirements such as payload delivered to a desired orbit. In order to optimize the vehicle design its constraints and requirements must be known, however as the design cycle proceeds it is all but inevitable that the conditions will change. Upon that change, the previously optimized trajectory may no longer be optimal, or meet design requirements. The current paradigm for adjusting to these updates is generating point solutions for every change in the design's requirements [2]. This can be a tedious, time-consuming task as changes in virtually any piece of a launch vehicle's design can have a disproportionately large effect on the ascent trajectory, as the solution space of the trajectory optimization problem is both non-linear and multimodal [3]. In addition, an industry standard tool, Program to Optimize Simulated Trajectories (POST), requires an expert analyst to produce simulated trajectories that are feasible and optimal [4]. In a previous publication the authors presented a method for combatting these challenges [5]. In order to bring more detailed information into Conceptual and Pre-Conceptual design, knowledge of the effects originating from changes to the vehicle must be calculated. In order to do this, a model capable of quantitatively describing any vehicle within the entire design space under consideration must be constructed. This model must be based upon analysis of acceptable fidelity, which in this work comes from POST. Design space interrogation can be achieved with surrogate modeling, a parametric, polynomial equation representing a tool. A surrogate model must be informed by data from the tool with enough points to represent the solution space for the chosen number of variables with an acceptable level of error. Therefore, Design Of Experiments (DOE) is used to select points within the design space to maximize information gained on the design space while minimizing number of data points required. To represent a design space with a non-trivial number of variable parameters the number of points required still represent an amount of work which would take an inordinate amount of time via the current paradigm of manual analysis, and so an automated method was developed. The best practices of expert trajectory analysts working within NASA Marshall's Advanced Concepts Office (ACO) were implemented within a tool called multiPOST. These practices include how to use the output data from a previous run of POST to inform the next, determining whether a trajectory solution is feasible from a real-world perspective, and how to handle program execution errors. The tool was then augmented with multiprocessing capability to enable analysis on multiple trajectories simultaneously, allowing throughput to scale with available computational resources. In this update to the previous work the authors discuss issues with the method and solutions.

Patrick D Dees↗

Space-Shielding Radiation Dosage Code Evaluation - Phase 1: SHIELDOSE-2 Radiation-Assessment Code

Radiation-transport codes or radiation-analysis tools are used in the spacecraft-design community to define and assess the local radiation levels. Among various radiation-transport/analysis tools available, SHIELDOSE-2 is commonly used in the early spacecraft-design phases because it has been established that it provides reasonably reliable results with relatively rapid computation time. The NASA Engineering and Safety Center initiated a two-phased study: (1) to better understand and document the SHIELDOSE-2 code capabilities and limitations, and (2) to recommend alternative tools to use for cases where SHIELDOSE-2 is not applicable. This report provides a summary of the Phase 1 study.

SHIELDOSE-2↗

Space-Shielding Radiation Dosage Code Evaluation Phase 2: SHIELDOSE-2 Radiation-Assessment Code

Radiation-transport codes or radiation-analysis tools are used in the spacecraft-design community to define and assess the local radiation levels. Among various radiation-transport/analysis tools available, SHIELDOSE-2 is commonly used in the early spacecraft-design phases because it has been established that it provides reasonably reliable results with relatively rapid computation time. The NASA Engineering and Safety Center initiated a two-phased study: (1) to better understand and document the SHIELDOSE-2 code capabilities and limitations, and (2) to identify alternative tools to use for cases where SHIELDOSE-2 is not applicable. This report provides a summary of the Phase 2 study.

SHIELDOSE-2↗

Europa Clipper Mission: Onward to Implementation!

Europa, the fourth largest moon of Jupiter, is believed to be one of the best places in the solar system to look for extant life beyond Earth, and the Europa Clipper Mission is preparing to investigate. Now entering the fifth year of life as a formal project, the Europa Clipper Mission has completed its major design phase and is preparing for implementation. The mission envisions sending a flight system, consisting of a spacecraft equipped with a payload of NASA-selected scientific instruments, to execute numerous flybys of Europa while in Jupiter orbit. The mission is being formulated and implemented by a joint Jet Propulsion Laboratory (JPL) and Applied Physics Laboratory (APL) Project team. At the Project Preliminary Design Review (PDR) in August 2018, it was determined that the unique integration of the REASON instrument’s antennas with the spacecraft’s solar arrays required additional time for maturity and review. The required maturity was demonstrated, and in June 2019 the Clipper Mission passed its Delta Preliminary Design Review, and formal confirmation for entry into Phase C was announced by NASA in August 2019. The earliest launch opportunity is now in July 2023, one year later than originally planned. The Project is now working toward its Critical Design Review in May 2020. This paper will describe the progress of the Europa Clipper Mission since January 2019, including maturation of the spacecraft, subsystem and instrument designs, the beginning of fabrication of engineering models and the first flight models, planning for the verification & validation phase, and planning for operations.

Jackson, Maddalena↗

A Recommended Procedure for Estimating the Cosmic Ray Spectral Parameter of a Simple Power Law

A simple power law model consisting of a single spectral index a(f(sub i)) is believed to be an adequate description of the galactic cosmic ray (GQ proton flux at energies below 1013 eV. Two procedures for estimating a(f(sub i)), referred as (1) the method of moments, and (2) maximum likelihood, are developed and their statistical performance compared. I concluded that the maximum likelihood procedure attains the most desirable statistical properties and is hence the recommended statistic estimation procedure for estimating a1. The maximum likelihood procedure is then generalized for application to a set of real cosmic ray data and thereby makes this approach applicable to existing cosmic ray data sets. Several other important results, such as the relationship between collecting power and detector energy resolution, as well as inclusion of a non-Gaussian detector response function, are presented. These results have many practical benefits in the design phase of a cosmic ray detector because they permit instrument developers to make important trade studies in design parameters as a function of one of the science objectives, which is particularly important for space-based detectors where physical parameters, such as dimension and weight, impose practical limits to the design envelope.

Howell, Leonard W.↗

Error Cost Escalation Through the Project Life Cycle

It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

Stecklein, Jonette M.↗

Sample Return Container Opening Process Concept for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require a pristine and secure opening method to ensure sample Contamination Control and backward Planetary Protection. In order to reach the samples, a series of five containers would need to be opened inside of a Mars Returned Sample Handling (MRSH) facility. The process would include opening the Containment Assurance Module (CAM) aboard the Earth Entry Vehicle (EEV), the Secondary Containment Vessel (SCV), Primary Containment Vessel (PCV), and the Orbiting Sample (OS) container, and finally removing and opening the Returned Sample Tube Assemblies (RSTA). Some of these containers can be opened by reversing the mechanical assembly process while others would require destructive means. Several containers are still in a conceptual design phase while others are en route to Mars aboard the M2020 rover. In order to inform the design of the containers that are still in the conceptual stages, a study was performed at each level of the containment assembly. The studies were used to determine the least destructive and most robust methods to disassemble and open the containers while minimizing risk to the samples or the personnel. In addition to the envisioned disassembly and breaching method, contingency plans were made for completing the disassembly if damage to the vehicle and containment system occurred.

Liu, Yang↗

Design procedure for satisfying time domain bounds for nonminimum-phase systems

Design techniques are presented applicable to nonminimum-phase systems. They are designed to handle plants with one right-half-plane zero which may vary, and any other variation of the plant parameters within known limits. The specifications that must be designed are given as a set of step response bounds in the time domain. A completed design will yield responses that stay within the time domain bounds at all times and utilize the entire region of allowed variation.

Ostheimer, W. D.↗

The Kilopower Space Nuclear Fission Power Reactor

Nuclear fission power offers an attractive alternative to solar electric or radioisotope power systems for certain applications on the Moon, Mars, and deep space science missions. The advantages of independence from solar irradiance, high energy density, and abundance of fuel allow fission power systems to enable novel, high power mission architectures. While NASA has had numerous fission power programs throughout its history, few have gone far beyond the design phase. The recent test campaign called the Kilopower Reactor Using Stirling Technology project (KRUSTY) focused on a low power, kilowatt-scale design for simplicity and reduced cost, with the driving motivation to perform a full nuclear hardware prototype test. Following the successful completion of the KRUSTY nuclear hardware test in March of 2018, NASA has begun the formulation process for a Technology Demonstration Mission (TDM) using the Kilopower reactor technology. In support of NASA's lunar surface initiatives, the Kilopower TDM will target a 1-3 kW fission electric power system that can survive the lunar night and operate for one year. The system will be heavily influenced by the KRUSTY reactor design, using a solid Uranium metal core with high temperature heat pipes and Stirling engine power conversion. During this formulation phase, continued engineering efforts are ongoing to improve heat transfer efficiency in the system, examine fission radiation damage effects, and begin to address the thermal and structural requirements of a Kilopower flight system.

Chaiken, Max↗

Digital Engineering and Cybersecurity Decision Analysis in Early Phases of SMR-Driven IES Projects

Considerable efforts are underway to ensure cybersecurity is integrated into the systems engineering lifecycle. Cyber-informed engineering and security-by-design frameworks are intended to identify and engineer out cybersecurity risks throughout the lifecycle. While these approaches are valuable for promoting the need to include cybersecurity considerations in early design phases to create more secure systems, they may not consider the entirety of digital risks. Digital risks in a digital instrumentation and control system include adversarial and unintentional risks from internal and external factors, such as human performance errors, design flaws, environmental conditions, and equipment degradation or failure. This report provides a detailed discussion on digital risk prior to describing the background and concept of operations for a small modular reactor-driven integrated energy system connected to industrial applications. The challenges of competing objectives and competing stakeholder requirements are discussed and the impacts on digital engineering, security considerations, and interdependencies are evaluated for mission-level, facility-level, and system-level decisions.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cost estimating methods for advanced space systems

Parametric cost estimating methods for space systems in the conceptual design phase are developed. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance, and time. The relationship between weight and cost is examined in detail. A theoretical model of cost is developed and tested statistically against a historical data base of major research and development programs. It is concluded that the technique presented is sound, but that it must be refined in order to produce acceptable cost estimates.

Cyr, Kelley↗