Corrosion Evaluation for Tank 241-AP-106 Re-purposing

Tank AP-106 will be an integral part of the Direct Feed Low Activity Waste (DF-LAW) activity. This tank is an underground, carbon steel, double shell tank (DST). Before it can be utilized, the Cs-137 concentration levels in the waste must be reduced significantly. The AP-106 re-purposing process will manage normal waste tank additions procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, concerns regarding tank integrity during and after the process to Tank AP-106 and associated tanks (i.e., AP-102, AN-101, and AP-108) were addressed. The degradation mechanisms identified include: general and pitting corrosion, caustic stress corrosion cracking, galvanic corrosion, and microbiologically induced corrosion (MIC). Recommendations were provided to minimize the exposure of the tank to corrosive conditions (see Section 6.0). These recommendations included chemistry adjustments at defined steps in the process that will maintain the waste in compliance with the corrosion control program. Additionally, sampling and inspection (see Sections 6.0 and 7.0, respectively) recommendations that will assess the final condition of the tank environment and the tank were presented. The greatest risk for this process involves the handling of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within the AP-106, associated tanks and supporting infrastructure (i.e., transfer line piping). As long as this water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, the final condition is expected to be within compliance. Recommendations were also made to address process interruptions that could result in exposure of the tank walls to aggressive conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Waste LDR Organics Data Summary for Sample-and-Send (Rev.1A)

The presence of organic chemicals regulated under the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDR) adds complexity to treating and disposing of the low activity fraction of Hanford tank waste if a low temperature treatment method such as grouting is used (SRNL-STI-2020-00228). The complexity arises from the fact that the baseline vitrification method is considered by the Washington State Department of Ecology (Ecology) as providing adequate thermal treatment for organics; a status not automatically extended to a lowtemperature process, such as solidifying the waste in a cementitious waste form. In addition, the Environmental Protection Agency (EPA) LDR program is intended to ensure that wastes are properly treated prior to disposal. Proper treatment makes hazardous waste less harmful to groundwater by reducing the mobility and/or toxicity of the hazardous constituents in the waste. EPA guidance indicates that stabilization/solidification of waste for organics could be considered impermissible dilution under the LDR dilution prohibition. In addition, waste storage activities at Hanford have required transferring and blending waste within the tank system and these activities have potentially altered the concentrations of the hazardous constituents. The LDR dilution prohibition found in 40 Code of Federal Regulations (CFR) 268.3 states that “… no generator, transporter, handler, or owner or operator of a treatment, storage, or disposal facility shall in any way dilute a restricted waste or the residual from treatment of a restricted waste as a substitute for adequate treatment …”. Hence, if LAW is to be treated using low temperature stabilization (such as cementation), then it is important to demonstrate both how past storage activities have contributed to the removal (by vacuum evaporation), or destruction (by in situ decomposition) of the LDR organics and how future retrieval and waste feed preparation will contribute to their removal (by filtration and ion exchange). Demonstrating these processes helps validate that cementation without additional organic treatment does not necessarily represent impermissible dilution. To aid in implementing cementitious solidification of Low Activity Waste (LAW), WRPS has been developing a regulatory and processing LDR treatment variance strategy termed “Sampleand-Send” that relies, in part, on demonstrating that in situ decomposition reactions along with historic evaporation of tank waste has destroyed or removed most of the LDR organics possibly associated with Hanford Tank Waste (SRNL-STI-2020-00582, SRNL-STI-2021-00453, SRNL-STI-2022-00391). Under the Sample-and-Send concept, Hanford tank waste would be retrieved, processed through a Tank-Side Cesium Removal-like system, and staged as a candidate feed that would then be sampled to confirm the waste acceptance criteria is met for solidification in an LAW cementitious treatment facility. If it can be shown that LDR organics are at concentrations below the waste acceptance criteria (WAC) for cementitious stabilization and have been sufficiently removed (by historic evaporation or by filtration and ion exchange during Cs removal), destroyed (by historic in situ decomposition), or are not soluble in LAW above the WAC then additional organic treatment is not needed prior to creating a cementitious final waste form and the concept of Sample-and-Send would be proposed to establish a non-rulemaking site-specific treatment variance using the specified method of treatment “STABL” to remove sampling requirements of the waste form after treatment. Waste not meeting the WAC could either be routed to the Hanford Waste Treatment and Immobilization Plant for LAW vitrification, or further processed by evaporation or chemical oxidation before solidifying in a cementitious waste form. A key component in implementing the Sample-and-Send strategy is identifying which of the 207 LDR organic compounds associated with the RCRA Part A permit application waste codes for the Double Shell Tanks (DSTs) and Single Shell Tanks (SSTs) and any applicable Underlying Hazardous Constituents (UHCs) from 40 CFR 268.48 should be considered as potentially present and thus subject to regulation. In addition, it is also necessary to understand the solubility volatility, and reactivity of these compounds in LAW to identify which of the potentially present LDR organic compounds are not soluble above regulatory levels or are likely to have been removed by historic evaporation or destroyed by in situ decomposition reactions. If there are potentially present LDR organic compounds that have not been removed or destroyed and are soluble above regulatorily significant concentrations then a treatability variance may be needed for these species to eliminate any concerns pertaining to impermissible dilution. The spreadsheet accompanying this calculation report contains the data and logic computations needed to screen the list of 207 LDR organics associated with Hanford tank waste to identify those potentially present and to indicate which compounds may need to be included in a treatability variance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray Phase 2 (Tasks 9-20)

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Solutions (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report for Cold Spray: Phase 2

In support of the ongoing environmental protection mission at the Hanford Site, led by Washington River Protection Services (WRPS), the cold spray team has continued development of the tank refurbishment technology. Orano Federal Services, along with subcontractors VRC Metal Systems (VRC) and Robotic Technologies of Tennessee (RTT), have worked with WRPS experts to refine the tools demonstrated in Phase 1 of this project, with the potential to refurbish double shell tanks (DST)s on the Hanford Site, extending the service lives of these vital waste storage facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrity Monitoring and Assessment, Prediction, Repair, and Corrosion Control of the Hanford Storage Tanks — 25213

BACKGROUND AND PROJECT TASKS Proposed work addresses focus area 1: Waste Retrieval, Transport and Closure, with particular focus on increasing volume available for tank storage 1) Refurbish/fortify existing double shell storage tanks (Tank Refurbish – Polymer Grout) 2) Robust monitoring tools for internal corrosion (Integrity Monitoring -Reference Electrodes) 3) Mitigate external corrosion (Degradation Prevention - Cathodic Protection) 4) Determine viability of constructing new tanks, and storage room creation by way of evaporation (Cost Benefit Analysis)

Shukla, Pavan K. [Savannah River National Laborato↗

Evaluation of Hanford Supernatant Waste Evaporation

• Hanford site in Washington has 27 underground “double-shell” storage tanks containing radioactive waste. Storage space is utilized to max capacity. • Construction of new tanks is undesirable, but volume reduction is still possible by vacuum evaporation of liquid waste. • Excess evaporation may create additional problems in solids precipitation, waste density and corrosivity. • Evaporation of liquid waste was simulated to determine possible outcomes.

Barkai, Benjamin [Savannah River National Laborato↗

Completion document for MRT 8824 - Upgrade NIF’s gaseous radiochemistry diagnostics (RAGS) to support weapons science

This milestone highlights the successful upgrade and deployment of the Radiochemical Analysis of Gaseous Samples (RAGS) system, which delivers high-quality measurements (<20% uncertainty) of activated gaseous species from NIF implosions. These measurements are critical for supporting Stockpile Stewardship Program (SSP) relevant platforms, including LANL’s Double Shell and LLNL’s Pushered Single Shell campaigns. The RAGS diagnostic technique enables analysis of short-range mixing in implosions using high-Z shells, which are otherwise inaccessible to conventional x-ray diagnostic methods. By facilitating the investigation of high-Z material mixing into fusion burn, this system provides essential data for quantifying and interpreting results in high-energy density (HED) experiments. This report details the physics motivation, diagnostic fundamentals, planned and enacted upgrade work, and the quantification of uncertainty for the upgraded system.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Volume Change from Solidification Correlation for Hanford Tank Waste.

The U.S. Department of Energy (DOE), Hanford Field Office’s primary mission is to safely and effectively treat Hanford’s tank waste and deliver environmental remediation. Mixed radioactive waste is stored in the underground tanks at the Hanford Site. It was recently estimated that retrieval of the waste in the 200 West Area underground tanks in the SY, S, SX, and U Tank Farms will result in about 41 million gallons of mixed low-level waste (MLLW) (RPP-RPT-65147, Rev. 1). The current plan is to retrieve at least 22 S, SX, and U Farm tanks and pretreat1 to produce pretreated tank waste (PTW) which will be further treated (including solidification /immobilization) for Resource Conservation and Recovery Act (RCRA) Land Disposal Restriction (LDR) organics and inorganics before being transferred to an offsite out-of-state facility for disposal (RPP-PLAN-66135, Rev. 2). In addition, solidified PTW from the 200 East Area may also be transferred to an offsite out-of-state facility for disposal to ensure availability of critical Double-Shell Tank space, meet retrieval obligations, and optimize 200 East Area operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE FLAMMABILITY ANALYSIS AND TIME TO REACH LOWER FLAMMABILITY LIMIT CALCULATIONS ON THE WASTE EVAPORATION AT 242-A EVAPORATOR

This document describes the analysis of the waste evaporation process on the flammability behavior. The evaluation calculates the gas generation rate, time to reach 25% and 100% of the lower flammability limit (LFL), and minimum ventilation rates for the 242-A Evaporator facility during the normal evaporation process and when vacuum is lost. This analysis performs flammability calculations on the waste currently within all 28 double-shell tanks (DST) under various evaporation process conditions to provide a wide spectrum of possible flammable gas behavior. The results of this analysis are used to support flammable gas control decisions and support and upgrade to Documented Safety Analysis for the 242-A Evaporator.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TANK 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ELECTROCHEMICAL CORROSION TESTS FOR TANK 241-AY-101 CORE 325 SEGMENTS 16R1 & 16R2

The interstitial liquid in the double-shell tank 241-AY-101 settled solids layer is below the hydroxide chemistry control limit required by HNF-SD-WM-TSR-006, Tank Farms Technical Safety Requirements, Administrative Control 5.16, 'Corrosion Mitigation Controls'. Operating tanks outside of the specification may increase the propensity corrosion of the carbon steel wall. This report is concerned with generalized electrochemical corrosion mechanism that may occur at specific loci. All cyclic potentiodynamic polarization scans exhibited a negative hysteresis, scan reversing at lower current density, indicating that there was no pitting propensity. The general electrochemical corrosion rates ranged from 4.4E-02 to 1.5E-03 mpy with the first round of coupons, while the second round yielded corrosion rates of 2.5E-03 to 2.9E-02 mpy.

36 MATERIALS SCIENCE↗

REPORT ON THE EFFECT OF TEMPERATURE AND AMMONIA CONCENTRATION ON A515 CARBON STEEL IN TANK 241 AY 101 SIMULANT

This report documents the results from RPP-PLAN-38676, Effect of Temperature and Ammonia Concentration on A515 Carbon Steel in Tank 241-AY-101 Simulant. The purpose of this test plan was to investigate the simulant formulated for the double-shell tank (DST) 241 AY 101 (AY 101) with the addition of ammonia. The simulant was formulated from the AY-101 condensate surface layer recipe used by CC Technologies{reg_sign} in the investigation of Hanford DST chemistry, under the Expert Panel on Corrosion. AY-101 is constructed from A515 grade 60 steel. The laboratory investigation used a cylindrical corrosion coupon from this steel formulation with a surface area of 5.64 square centimeters.

36 MATERIALS SCIENCE↗

TANK SPACE OPTIONS REPORT

Since this report was originally issued in 2001, several options proposed for increasing double-shell tank (DST) storage space were implemented or are in the process of implementation. Changes to the single-shell tank (SST) waste retrieval schedule, completion of DST space saving options, and the DST space saving options in progress have delayed the projected shortfall of DST storage space from the 2007-2011 to the 2018-2025 timeframe (ORP-11242, River Protection Project System Plan). This report reevaluates options from Rev. 0 and includes evaluations of new options for alleviating projected restrictions on SST waste retrieval beginning in 2018 because of the lack of DST storage space.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

METHODS FOR DETERMINING AGITATOR MIXING REQUIREMENTS FOR A MIXING & SAMPLING FACILITY TO FEED WTP (WASTE TREATMENT PLANT)

The following report is a summary of work conducted to evaluate the ability of existing correlative techniques and alternative methods to accurately estimate impeller speed and power requirements for mechanical mixers proposed for use in a mixing and sampling facility (MSF). The proposed facility would accept high level waste sludges from Hanford double-shell tanks and feed uniformly mixed high level waste to the Waste Treatment Plant. Numerous methods are evaluated and discussed, and resulting recommendations provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SHEAR STRENGTH MEASURING EQUIPMENT EVALUATION AT THE COLD TEST FACILITY

Retrievals under current criteria require that approximately 2,000,000 gallons of double-shell tank (DST) waste storage space not be used to prevent creating new tanks that might be susceptible to buoyant displacement gas release events (BDGRE). New criteria are being evaluated, based on actual sludge properties, to potentially show that sludge wastes do not exhibit the same BDGRE risk. Implementation of the new criteria requires measurement of in situ waste shear strength. Cone penetrometers were judged the best equipment for measuring in situ shear strength and an A.P. van den berg Hyson 100 kN Light Weight Cone Penetrometer (CPT) was selected for evaluation. The CPT was procured and then evaluated at the Hanford Site Cold Test Facility. Evaluation demonstrated that the equipment with minor modification was suitable for use in Tank Farms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STEADY STATE FLAMMABLE GAS RELEASE RATE CALCULATION AND LOWER FLAMMABILITY LEVEL EVALUATION FOR HANFORD TANK WASTE

This report assesses the steady state flammability level under off normal ventilation conditions in the tank headspace for 28 double-shell tanks (DST) and 149 single shell-tanks (SST) at the Hanford Site. Flammability was calculated using estimated gas release rates, Le Chatelier's rule, and lower flammability limits of fuels in an air mixture. This revision updates the hydrogen generation rate input data for al1 177 tanks using waste composition information from the Best Basis Inventory Detail Report (data effective as of August 4,2008). Assuming only barometric breathing, the shortest time to reach 25% of the lower flammability limit is 13 days for DSTs (i.e., tank 241-AZ-102) and 36 days for SSTs (i.e., tank 241-B-203). Assuming zero ventilation, the shortest time to reach 25% of the lower flammability limit is 12 days for DSTs (i.e., tank 241-AZ-102) and 34 days for SSTs (i.e., tank 241-B-203).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STEADY STATE FLAMMABLE GAS RELEASE RATE CALCULATION AND LOWER FLAMMABILITY LEVEL EVALUATION FOR HANFORD TANK WASTE

This report assesses the steady state flammability level under off normal ventilation conditions in the tank headspace for 28 double-shell tanks (DST) and 149 single shell-tanks (SST) at the Hanford Site. Flammability was calculated using estimated gas release rates, Le Chatelier's rule, and lower flammability limits of fuels in an air mixture. This revision updates the hydrogen generation rate input data for all 177 tanks using waste composition information from the Best Basis Inventory Detail Report (data effective as of August 4,2008). Assuming only barometric breathing, the shortest time to reach 25% of the lower flammability limit is 11 days for DSTs (i.e., tank 241-AZ-10l) and 36 days for SSTs (i.e., tank 241-B-203). Assuming zero ventilation, the shortest time to reach 25% of the lower flammability limit is 10 days for DSTs (i.e., tank 241-AZ-101) and 34 days for SSTs (i.e., tank 241-B-203).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗