Search NASA⌕ Search

SEARCH · Search NASA

Results for “Flight Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Cost, capability, and risk for planetary operations

The three key factors for flight projects - cost, capability, and risk - are examined with respect to their interplay, the uplink process, cost drivers, and risk factors. Scientific objectives are translated into a computer program during the uplink process, and examples are given relating to the Voyager Interstellar Mission, Galileo, and the Comet Rendezvous Asteroid Flyby. The development of a multimission sequence system based on these uplinks is described with reference to specific subsystems such as the pointer and the sequence generator. Operational cost drivers include mission, flight-system, and ground-system complexity, uplink traffic, and work force. Operational risks are listed in terms of the mission operations, the environment, and the mission facilities. The uplink process can be analyzed in terms of software development, and spacecraft operability is shown to be an important factor from the initial stages of spacecraft development.

Mclaughlin, William I.↗

The StarLight interferometer architecture and operational concepts

The StarLight flight project was designed to demonstrate the key technologies of spacebome long-baseline stellar interferometry and precision formation flying for potential use on the Terrestrial Planet Finder (TPF) and other future astrophysics missions. Interferometer performance validation could be achieved over a 6-12 month period by obtaining several hundred fringe visibility amplitude measurements for stars in the band 600-1000 nm for a variety of stellar visibilities (0.2-1.0), magnitudes (Mv = 2-5), and baselines (B = 30-125 meters). Interferometry could be performed both in a 1 meter fixed-baseline combiner-only mode and in a two-spacecraft formation mode. In formation mode, the combiner spacecraft would remain at the focus of a virtual parabola, while the collector spacecraft assumed various positions along the parabola such that the two arms of the interferometer remained equal over a variety of separations and bearing angles. Challenges to be encountered in flight include high-bandwidth inter-spacecraft stellar and metrology pointing control, alignment and shear correction, delay and delay-rate estimation, visibility calibration, and robust fringe tracking in the presence of local and inter-spacecraft dynamics. This paper is based on the StarLight project design-capture of March 2002 and will describe the StarLight Interferometer System architecture and selected operational concepts (both of which have relevance to the on-going TPF Technology Program).

stellar↗

Small Unmanned Aircraft Electromagnetic Interference (EMI) Initial Assessment

With many applications envisioned for small Unmanned Aircraft Systems (sUAS), and potentially millions of sUAS expected to be in operation in the future, the electromagnetic interference environment associated with the sUAS is of interest to understanding the potential performance impacts on the sUAS command and control communications link as well as the sUAS payload and payload links. As part of NASA's UAS Traffic Management (UTM) Project, flight experiments are planned to characterize the RF environment at altitudes up to 400 ft to better understand how UTM command and control links can be expected to perform. The flight experiments will use an RF channel sensing payload attached to an sUAS. In terms of the payload being capable of measuring relatively low level signals at altitude, electromagnetic interference (EMI) emanating from the sUAS vehicle itself could potentially complicate the measurement process. For this reason, NASA was interested in measuring the EMI performance of the sUAS planned for these flight experiments, a DJI model S1000. The S1000 was thus measured in a controlled EMI test chamber at the NASA Ames Research Center. The S1000 is a carbon fiber based platform with eight rotors. As such, the EMI test results represent potential performance of a number of similar sUAS types. sUAS platforms significantly different from the S1000 may also require EMI testing, and the method employed for NASA's S1000 EMI tests can be applied to other platforms. In this paper we describe the UTM project, the RF channel sensing payload, the EMI testing method and EMI test results for the S1000, and discuss the implications of these results.

Unmanned aircraft↗

Small Unmanned Aircraft Electromagnetic Interference (EMI) Initial Assessment

With many applications envisioned for small Unmanned Aircraft Systems (sUAS), and potentially millions of sUAS expected to be in operation in the future, the electromagnetic interference environment associated with the sUAS is of interest to understanding the potential performance impacts on the sUAS command and control communications link as well as the sUAS payload and payload links. As part of NASAâ€"TM"s UAS Traffic Management (UTM) Project, flight experiments are planned to characterize the RF environment at altitudes up to 400 ft to better understand how UTM command and control links can be expected to perform. The flight experiments will use an RF channel sensing payload attached to an sUAS. In terms of the payload being capable of measuring relatively low level signals at altitude, electromagnetic interference (EMI) emanating from the sUAS vehicle itself could potentially complicate the measurement process. For this reason, NASA was interested in measuring the EMI performance of the sUAS planned for these flight experiments, a DJI model S1000. The S1000 was thus measured in a controlled EMI test chamber at the NASA Ames Research Center. The S1000 is a carbon fiber based platform with eight rotors. As such, the EMI test results represent potential performance of a number of similar sUAS types. sUAS platforms significantly different from the S1000 may also require EMI testing, and the method employed for NASAâ€"TM"s S1000 EMI tests can be applied to other platforms. In this paper we describe the UTM project, the RF channel sensing payload, the EMI testing method and EMI test results for the S1000, and discuss the implications of these results.

traffic management↗

X-57 Wing Structural Load Testing

The X-57 flight project will provide an opportunity to assess the benefits of distributed electric propulsion. The plan is to use a TECNAM P2006T twin-engine light aircraft (Aeronautiche TECNAM S.p.A., Capua, Italy) as the baseline aircraft, but design and fabricate a new wing to test the technology. The wing when fully integrated onto the X-57 TECNAM P2006T fuselage will incorporate two wingtip cruise electric motors and 12 high-lift electric motors along the wing span. The testing described in this paper confirmed the strength of the X-57 wing for flight and provided an opportunity to calibrate the wing flight strain gages for monitoring loads in flight. The X-57 wing was qualification tested in the National Aeronautics and Space Administration Armstrong Flight Research Center Flight Loads Laboratory. This paper documents the airworthiness approach, test setup, instrumentation, and preliminary results. The X-57 ground load testing lessons learned are also discussed.

Wing loading↗

Advanced Stirling Convertor (ASC) Development for NASA RPS

Sunpower's Advanced Stirling Convertor (ASC) initiated development under contract to the NASA Glenn Research Center (GRC) and after a series of successful demonstrations, the ASC began transitioning from a technology development project to flight development project. The ASC has very high power conversion efficiency making it attractive for future Radioisotope Power Systems (RPS) in order to make best use of the low plutonium-238 fuel inventory in the U.S. In recent years, the ASC became part of the NASA-Department of Energy Advanced Stirling Radioisotope Generator (ASRG) Integrated Project. Sunpower held two parallel contracts to produce ASC convertors, one with the Department of Energy/Lockheed Martin to produce the ASC-F flight convertors, and one with NASA GRC for the production of ASC-E3 engineering units, the initial units of which served as production pathfinders. The integrated ASC technical team successfully overcame various technical challenges that led to the completion and delivery of the first two pairs of flight-like ASC-E3 by 2013. However, in late Fall 2013, the DOE initiated termination of the Lockheed Martin ASRG flight development contract driven primarily by budget constraints. NASA continues to recognize the importance of high efficiency ASC power conversion for RPS and continues investment in the technology including the continuation of ASC-E3 production at Sunpower and the assembly of the ASRG Engineering Unit #2. This paper provides a summary of ASC technical accomplishments, overview of tests at GRC, plans for continued ASC production at Sunpower, and status of Stirling technology development.

Power Efficiency↗

Launch Vehicle Flight Report - Nasa Project Apollo Little Joe 2 Qualification Test Vehicle 12-50-1

The Little Joe II Qualification Test Vehicle, Model 12-50-1, was launched from Army Launch Area 3 {ALA-3) at White Sands Missile Range, New Mexico, on 28 August 1963. This was the first launch of this class of boosters. The Little Joe II Launch Vehicle was designed as a test vehicle for boosting payloads into flight. For the Apollo Program, its mission is to serve as a launch vehicle for flight testing of the Apollo spacecraft. Accomplishment of this mission requires that the vehicle be capable of boosting the Apollo payload to parameters ranging from high dynamic pressures at low altitude to very high altitude flight. The fixed-fin 12-50 version was designed to accomplish the low-altitude parameter. The 12-51 version incorporates an attitude control system to accomplish the high altitude mission. This launch was designed to demonstrate the Little Joe II capability of meeting the high dynamic pressure parameter for the Apollo Program. For this test, a boiler-plate version of the Apollo capsule, service module and escape tower were attached to the launch vehicle to simulate weight, center of gravity and aerodynamic shape of the Apollo configuration. No attempt was made to separate the payload in flight. The test was conducted in compliance with Project Apollo Flight Mission Directive for QTV-1, NASA-MSC, dated 3 June 1963, under authority of NASA Contract NAS 9-492,

Source record↗

Autonomous Aerobraking Development Software: Phase 2 Summary

NASA has used aerobraking at Mars and Venus to reduce the fuel required to deliver a spacecraft into a desired orbit compared to an all-propulsive solution. Although aerobraking reduces the propellant, it does so at the expense of mission duration, large staff, and DSN coverage. These factors make aerobraking a significant cost element in the mission design. By moving on-board the current ground-based tasks of ephemeris determination, atmospheric density estimation, and maneuver sizing and execution, a flight project would realize significant cost savings. The NASA Engineering and Safety Center (NESC) sponsored Phase 1 and 2 of the Autonomous Aerobraking Development Software (AADS) study, which demonstrated the initial feasibility of moving these current ground-based functions to the spacecraft. This paper highlights key state-of-the-art advancements made in the Phase 2 effort to verify that the AADS algorithms are accurate, robust and ready to be considered for application on future missions that utilize aerobraking. The advancements discussed herein include both model updates and simulation and benchmark testing. Rigorous testing using observed flight atmospheres, operational environments and statistical analysis characterized the AADS operability in a perturbed environment.

Cianciolo, Alicia D.↗

Qualification of uralane 5750 A/B (LV) for flight applications

Uralane 5750 A/B (LV) is a POLYURETHANE which was to be considered for use as a thin CONFORMAL COATING on printed circuit boards for JPL flight projects. As part of the qualification process several properties of Uralane 5750 A/B (LV) were measured for the as-cured material and after various environmental exposures. The properties that were measured included outgassing i.e. Total Mass Loss (TML) and Vacuum Condensable Mass (VCM) and mass accumulation rates on cold surfaces, Static Elastic Modulus and coefficient of Thermal Expansion (CTE). The Uralane 5750 A/B (LV) that was tested consisted of sheets which varied in both thickness and curing procedures. The environmental exposures consisted of vacuum, thermal and combined thermal vacuum. The physical properties of Uralane 5750 A/B (LV) met the JPL requirements for flight in both the as-cured condition and after environmental exposures.

Lewis, Donald F.↗

NASA Deep Space Network performance analysis

As part of the Control Center Operations, the Performance Analysis Group has responsibility for validating all committed Deep Space Network support to the various user projects. The group provides the Network with the analysis support necessary to assure that actual Network performance meets or exceeds committed levels throughout the mission. Validation is carried out as the signals are received in real time by monitoring the data streams and comparing the data quality against predicted values and established performance standards and tolerance limits. An important function is to generate the predictions used to point the antennas, acquire the radio frequency, and validate the monitored Network performance. Another function is anomaly investigation. An integral part of validation is the support task of generating and maintaining performance standards and tolerance limits for each flight project. The Performance Analysis Group is broadly divided into two subgroups: real-time personnel and nonreal-time personnel.

Bartok, C. D.↗

Evaluation of Ultem 1000, 1010, and 9085 for Radome Applications at 24.5 GHz

The UAS in the NAS project Flight Test 6 (FT6) campaign scheduled for FY19Q3 will evaluate the proficiency of a Honeywell DAPA-Lite Radar installed on a Tiger Shark unmanned vehicle to detect the presence of air traffic operating in its vicinity. A 3D printed radome will be manufactured for the front of the Tiger Shark to enclose the radar during FT6 operations. The DAPA-Lite radar operates in the 24.5 GHz frequency band. Material properties of 3D printer filaments are widely available for the mechanical and thermal properties, but limited knowledge exists on the electrical properties for radome applications and no data was found to correspond at the 24.5 Ghz frequency band. To minimize project risk associated with the radome performance, transmissivity and reflectivity measurements were conducted on two candidate 3D printed dielectric material filaments (Ultem 1010 Natural and Ultem 9085 Black) and two thicknesses of a solid laminate (Ultem 1000) material. The 3D printed Ultem coupons were tested shortly after being printed and again 8 months later to examine ageing effects of the open cell structure. This paper presents the transmissivity and reflectivity measurement results collected on the Ultem coupons and concludes the 3D printed 1010 Natural coupon is a suitable candidate filament for radome applications at 24.5 GHz. The design of the structure’s open cell matrix has a significant impact on the material’s surface reflectivity.

Szatkowski, George N.↗

A Multi-Mission Space Avionics Architecture

As the budget for the space industry is dwindling, a reusable avionics architecture applicable across multiple missions is urgently needed to reduce the development and production costs of flight projects. This paper presents a multi-mission avionics architecture which employs interface standards extensively, sot hat avionics systems can be built rapidly by assembling subsystems and instruments in a plug-and-play manner. The key feature of this architecture is a "backbone" standard parallel bus which can accommodate various standard interfaces through a repertoire of I/O modules. Hence, specific ;mission requirements can be met by selecting and integrating the appropriate subsystems and instruments into the system. This architecture can also adopt different "backbone" buses, implement redundant processors, and support distributed processing. An example of the architecture using the MOPS6000 from the Southwest Research Institute is also described. Experiments will be done in the Flight System Testbed (FST) of the Jet Propulsion Laboratory to benchmark the MOPS6000 and to demonstrate its multi-mission capability.

Avionics↗

Preliminary Report on Mission Design and Operations for Critical Events

Mission-critical events are defined in the Jet Propulsion Laboratory s Flight Project Practices as those sequences of events which must succeed in order to attain mission goals. These are dependent on the particular operational concept and design reference mission, and are especially important when committing to irreversible events. Critical events include main engine cutoff (MECO) after launch; engine cutoff or parachute deployment on entry, descent, and landing (EDL); orbital insertion; separation of payload from vehicle or separation of booster segments; maintenance of pointing accuracy for power and communication; and deployment of solar arrays and communication antennas. The purpose of this paper is to report on the current practices in handling mission-critical events in design and operations at major NASA spaceflight centers. The scope of this report includes NASA Johnson Space Center (JSC), NASA Goddard Space Flight Center (GSFC), and NASA Jet Propulsion Laboratory (JPL), with staff at each center consulted on their current practices, processes, and procedures.

Hayden, Sandra C.↗

Radio-science performance analysis software

The Radio Science Systems Group (RSSG) provides various support functions for several flight project radio-science teams. Among these support functions are uplink and sequence planning, real-time operations monitoring and support, data validation, archiving and distribution functions, and data processing and analysis. This article describes the support functions that encompass radio-science data performance analysis. The primary tool used by the RSSG to fulfill this support function is the STBLTY program set. STBLTY is used to reconstruct observable frequencies and calculate model frequencies, frequency residuals, frequency stability in terms of Allan deviation, reconstructed phase, frequency and phase power spectral density, and frequency drift rates. In the case of one-way data, using an ultrastable oscillator (USO) as a frequency reference, the program set computes the spacecraft transmitted frequency and maintains a database containing the in-flight history of the USO measurements. The program set also produces graphical displays. Some examples and discussions on operating the program set on Galileo and Ulysses data will be presented.

Morabito, D. D.↗

Structural-Thermal-Optical-Performance (STOP) Model Development and Analysis of a Field-widened Michelson Interferometer

An integrated Structural-Thermal-Optical-Performance (STOP) model was developed for a field-widened Michelson interferometer which is being built and tested for the High Spectral Resolution Lidar (HSRL) project at NASA Langley Research Center (LaRC). The performance of the interferometer is highly sensitive to thermal expansion, changes in refractive index with temperature, temperature gradients, and deformation due to mounting stresses. Hand calculations can only predict system performance for uniform temperature changes, under the assumption that coefficient of thermal expansion (CTE) mismatch effects are negligible. An integrated STOP model was developed to investigate the effects of design modifications on the performance of the interferometer in detail, including CTE mismatch, and other three- dimensional effects. The model will be used to improve the design for a future spaceflight version of the interferometer. The STOP model was developed using the Comet SimApp'TM' Authoring Workspace which performs automated integration between Pro-Engineer®, Thermal Desktop®, MSC Nastran'TM', SigFit'TM', Code V'TM', and MATLAB®. This is the first flight project for which LaRC has utilized Comet, and it allows a larger trade space to be studied in a shorter time than would be possible in a traditional STOP analysis. This paper describes the development of the STOP model, presents a comparison of STOP results for simple cases with hand calculations, and presents results of the correlation effort to bench-top testing of the interferometer. A trade study conducted with the STOP model which demonstrates a few simple design changes that can improve the performance seen in the lab is also presented.

Scola, Salvatore J.↗

Lessons Learned With Risk Management: A Systems Engineer's Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Lessons Learned With Risk Management: A Systems Engineer’s Perspective

Risk management is a communications device that, when executed as an essential task, enables systems engineering to effectively balance risk across the project. Developing and baselining risks is an essential continuous task to ensure top project concerns both from bottom up and top down are being mitigated. Risk management provides the opportunity to avoid the consequence of the risk when mitigation steps start early enough. Just discussing risk with all the project flight elements during development, even if no risks are open, provides an excellent communication opportunity between systems engineering and those elements, ensuring concerns and worries have a platform for discussion. A well-managed risk identification process will identify concerns that are serious but not being clearly communicated, and it will enable mitigation of those potential problems before they cause a failure. Effective risk management requires considerable time and effort, but that effort will save time and money across the development. Risk management must be frequent enough to be useful and in depth enough to bring out emerging issues. It also requires a trusting relationship between the lead systems engineer and element and/or subsystem leads. The discussions need to be with the right number of individuals (typically a handful) and the right duration in time (typically an hour a month). Outside of these risk working groups, there is a formal management process to input, status, and disposition risks, and a monthly Risk Management Board meeting where key project stakeholders are informed. This paper provides good guidance on effective risk management from a systems engineering perspective and provides project lessons learned from the NASA spaceflight missions NICER, Landsat 9, LRO, and OSIRIS-REx to demonstrate the effectiveness of risk management.

Lessons Learned↗

Heater Validation for the NEXT-C Hollow Cathodes

Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.

hollow cathodes↗