Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduler software for tracking and data relay satellite system loading analysis: User manual and programmer guide

A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.

Craft, R.↗

Intelligent industrial demand response to increase grid flexibility and reliability: A review

The rapid transition toward renewable energy has introduced challenges in grid stability due to the intermittency of non-dispatchable sources like solar and wind. Industrial Demand Response (IDR) offers a promising, cost-effective solution that adjusts energy consumption patterns to align with supply, increases renewable utilization, and reduces costs. This review provides an updated analysis of IDR, sorting technologies into five categories: energy storage, scheduled energy usage, operational flexibility, on-site generation, and intelligent operations. Energy storage solutions, while requiring little flexibility, often have the longest payback periods. While slightly better, on-site generation also has longer payback periods, ranging from 5 to 20 years or more. Scheduled energy usage, operational flexibility, and intelligent operations allow significant peak reduction at lower capital costs but require greater flexibility. While 15–20 % peak reduction is within the range of all five categories, scheduled energy use and on-site energy generation are shown to have reductions of up to 70–80 % in select scenarios. Combining multiple IDR strategies from these five categories maximizes both financial and operational benefits. Synergistic approaches are shown to enhance grid stability while reducing costs. As the grid evolves, IDR will enable a more flexible, renewable-powered future that will benefit industrial facilities and the broader energy system.

Demand flexibility↗

Temperature-aware task scheduling and proactive power management

Systems, apparatuses, and methods for performing temperature-aware task scheduling and proactive power management. A SoC includes a plurality of processing units and a task queue storing pending tasks. The SoC calculates a thermal metric for each pending task to predict an amount of heat the pending task will generate. The SoC also determines a thermal gradient for each processing unit to predict a rate at which the processing unit's temperature will change when executing a task. The SoC also monitors a thermal margin of how far each processing unit is from reaching its thermal limit. The SoC minimizes non-uniform heat generation on the SoC by scheduling pending tasks from the task queue to the processing units based on the thermal metrics for the pending tasks, the thermal gradients of each processing unit, and the thermal margin available on each processing unit.

97 MATHEMATICS AND COMPUTING↗

Advance Resource Provisioning in Bulk Data Scheduling

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

97 MATHEMATICS AND COMPUTING↗

Technical note: Deep learning for creating surrogate models of precipitation in Earth system models

Abstract. We investigate techniques for using deep neural networks to produce surrogatemodels for short-term climate forecasts. A convolutional neural network istrained on 97 years of monthly precipitation output from the 1pctCO2 run (theCO 2 concentration increases by 1 % per year) simulated by the second-generation Canadian Earth System Model (CanESM2). The neural network clearly outperforms a persistence forecast anddoes not show substantially degraded performance even when the forecast lengthis extended to 120 months. The model is prone to underpredicting precipitationin areas characterized by intense precipitation events. Scheduled sampling(forcing the model to gradually use its own past predictions rather than groundtruth) is essential for avoiding amplification of early forecasting errors.However, the use of scheduled sampling also necessitates preforecasting(generating forecasts prior to the first forecast date) to obtain adequateperformance for the first few prediction time steps. We document the trainingprocedures and hyperparameter optimization process for researchers who wish toextend the use of neural networks in developing surrogate models.

54 ENVIRONMENTAL SCIENCES↗

Scheduling time-critical graphics on multiple processors

This paper describes an algorithm for the scheduling of time-critical rendering and computation tasks on single- and multiple-processor architectures, with minimal pipelining. It was developed to manage scientific visualization scenes consisting of hundreds of objects, each of which can be computed and displayed at thousands of possible resolution levels. The algorithm generates the time-critical schedule using progressive-refinement techniques; it always returns a feasible schedule and, when allowed to run to completion, produces a near-optimal schedule which takes advantage of almost the entire multiple-processor system.

Meyer, Tom W.↗

Bayesian Structural Time Series for Behind-the-Meter Photovoltaic Disaggregation

Distributed photovoltaic (PV) generation often occurs ``behind the meter": a grid operator can only observe the net load, which is the sum of the gross load and distributed PV generation. This lack of observability poses a challenge to system operation at both bulk level and distribution level. The lack of real-time or near-future disaggregated estimates of gross load and PV generation will lead to over scheduling of energy production and regulation reserves, reliability constraints violations, wear and tear of controller devices, and potentially cascading failures of a system. In this paper we propose the use of a Bayesian Structural Time Series (BSTS) model with local solar irradiance measurements to disaggregate the summed PV generation and gross load signals at a downstream measurement site. BSTSs are a highly expressive model class that blends classic time series models with the powerful Bayesian state space estimation framework. Disaggregation is done probabilistically, which automatically quantifies the uncertainties of the estimated PV generation and gross load consumption. Depending on the data availability in real-time, it can be used to disaggragate PV and gross load at customer site, or can be used at the feeder level. In this paper, we focus on solving the problem at feeder level. We compare the performance of a BSTS model as well as a handful of state-of-the-art methods on a Pecan Street AMI dataset, using the National Solar Radiation Database (NSRDB) to estimate local irradiance.

bayesian structural time series↗

Optimum-AIV: A planning and scheduling system for spacecraft AIV

A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

Arentoft, M. M.↗

Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

departure scheduling↗

Manned orbital systems concept study. Book 4: Programmatics for extended-duration missions

The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.

Source record↗

Distributed Generation Cost-Benefit and Ratemaking Considerations for Idaho

This memo was completed through the Grid Modernization Laboratory Consortium (GMLC), a strategic partnership between the U.S. Department of Energy (DOE) and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The GMLC was established as part of the DOE Grid Modernization Initiative to accelerate the development of technology, modeling analysis, tools, and frameworks to help enable grid modernization. Special thanks to DOE project leads, Larry Mansueti and Elaine Ulrich, and the laboratory project lead for this effort, Peter Cappers from Lawrence Berkeley National Laboratory (LBNL). The Idaho Public Utility Commission (IPUC) Staff requested this technical assistance to improve their understanding of the emerging, complex, and consequential issues around distributed energy resource (DER) rate design to help the staff achieve its goal of making a fair, just, and reasonable rate design recommendation with respect to Order 34147 under Case No. IPC-E-17-13. 2 PNNL-28285 In Case No. IPC-E-17-13, Idaho Power requested authorization from the IPUC to establish new rate schedules for residential and small general service customers with on-site generation. The IPUC’s Order No. 34046 of May 9, 2018 authorized Idaho Power to (IPUC 2018a): Close Schedule 84 and create Schedule 6 for residential on-site generators and Schedule 8 for small general service on-site generators; Acknowledge smart inverter technology; Make proposed revisions to interconnection Schedule 72; Open an Idaho Power-specific docket to “to comprehensively study the costs and benefits of on-site generation on Idaho Power’s system, as well as proper rates and rate design, transitional rates, and related issues of compensation for net excess energy provided as a resource” to Idaho Power; File a study with the IPUC “exploring fixed-cost recovery in basic charges and other rate design options prior to its next general rate case.”

24 POWER TRANSMISSION AND DISTRIBUTION↗

End-to-end planning and scheduling systems technology for space operations

Consideration is given to planning and scheduling operations concepts from an end-to-end perspective, through both mission operations and institutional support functions. An operations concept is proposed which is based on a flexible request language used to state resource requirements and mission constraints to a scheduling system. The language has the potential to evolve into an international standard for exchanging service request information on international space networks. The key benefit of the flexible scheduling request concept is the shift of a significant conflict resolution effort from humans to computers, reducing the time for generating a week's worth of schedules to hours instead of days.

Moe, Karen L.↗

A Strategy for Autogeneration of Space Shuttle Ground Processing Simulation Models for Project Makespan Estimations

Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.

Madden, Michael G.↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Residential Time-of-Use Utility Rate Structures and Economic Implications for Thermal Energy Storage

Thermal energy storage (TES) is an increasingly popular tool to level out the daily electrical demand and add stability to the electrical grid as more intermittent renewable energy sources are installed. TES systems can locally decouple high thermal loads from the operation of a heat pump or reduce the electrical energy demand of the heat pump by providing a more favorable temperature gradient. In addition, many policy makers and utility providers have introduced time-of-use (TOU) rate schedules for residential customers to better reflect the price of electricity generation and demand for specific times. TOU rate schedules price grid-provided electricity differently throughout the day depending on the region’s climate, time of year, and electrical production. Large differences between on-peak and off-peak electrical prices may create an economic advantage for a residential customer to install a TES system. In this work, the economic and energy savings are calculated for a modeled 2,400 square foot residential building with water/ice-based TES using a TOU rate structure. The weather data is from Fresno County, CA, ASHRAE climate zone 3B, and a representative residential TOU utility rate structure from Pacific Gas and Electric (PG&E) was used. The results showed that total energy consumption could be reduced by 14.5% with an 87.5% reduction in on-peak energy usage when the TES is installed. The cost of operating this system for space cooling was reduced by nearly 20% using the sample utility rate plan.

Sultan, Sara↗