Search NASA⌕ Search

SEARCH · Search NASA

Results for “HOSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction

Additive manufacturing (AM) in both polymer and metal has advanced to the point where it can substantially facilitate robot and remote system design and implementation. While AM is not a panacea to fix bad design concepts, properly used AM can create features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been available commercially for quite some time and is regularly used to facilitate prototyping and test fitting of parts later to be fabricated in metal or to produce low production quantity parts that do not require high structural strength. However Oak Ridge National Laboratory (ORNL) has pioneered large scale polymer additive manufacturing with sufficient strength to print a car and frame, a small house, a “wet” submarine, and tooling to mold wind generator blades. While polymer processes use a variety of materials, all polymer printers basically lay down a heated extruded bead of a certain width and height. Print resolution is based on the deposition rate of the printer. The larger the deposition rate, the lower the print resolution. Large scale polymer builds often rely on post processing (machining) to provide a smooth finish to the part surface.Metal printing processes are much more diverse than polymer print processes. Electron beam (ebeam), laser, and binder jet are common methods to fuse metal powder-based systems. Metal powder spray can be done with laser or plasma. While metal powder systems produce high definition parts, part size is limited. Larger parts are currently done with wire feed systems based on laser or arc (metal inert gas (MIG) or tungsten inert gas (TIG)) processes. Part definition decreases, but part size can be on the order of tens of cubic feet and hundreds of pounds.Two implementation examples are presented in this paper to illustrate the possibilities and to identify issues that remain. A dual arm hydraulic manipulator was printed in titanium using the ebeam process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire feed metal inert gas (MIG) process. The excavator was then used for digging as part of an equipment exposition validating the metallurgy of the printed part.

Nycz, Andrzej↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can substantially facilitates robot and remote system design and implementation. While AM is not a panacea to fix bad design concepts, properly used AM can creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available commercially for quite some time and is regularly used to facilitatefor prototyping and test fitting of parts later to be before they are fabricated fromin metal or to produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples thato illustrate the possibilities and to identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part.

Noakes, Mark↗

Design and Verification of An Open-Circuit Electro-Hydraulic Actuator System with An Integrated Electro-Hydraulic Unit

This paper proposes an electro-hydraulic actuator (EHA) system, and two novel-designed electro-hydraulic units (EHU) consisting of a fixed-displacement hydraulic pump and a variable-speed electric motor. Both the novel EHU designs integrate an electric machine and a hydraulic machine in a single unit, featuring compactness and power density. However, they differ for salient aspects such as power and electric machine cooling system. The EHA system features an open circuit design, where hydraulic hoses connect the EHU with a tank, a valve manifold, and the hydraulic cylinder. In this way, the proposed EHA technology can be used to implement distributed hydraulic actuation in a vehicle without requiring changes to the hydraulic actuators or at the overall layout of the hydraulic components with respect to the original vehicle design. A dedicated test rig is developed to verify the performance of the proposed EHA system. The efficiency of the EHA is measured in a steady state and under a realistic duty cycle of a commercial compact loader. The measured efficiency of the system can reach 54% with up to 20kN load and 6kW power level.

42 ENGINEERING↗

Control rod drive mechanism with heat pipe cooling

A representative cooling system for a nuclear reactor control rod drive mechanism (CRDM) includes an evaporation section located within or next to the CRDM and a condensation section fluidly coupled to the evaporation section. The cooling system includes a set of heat fins coupled to drive coils in the CRDM and heat pipes that extend through the drive coils and heat fins. A fluid evaporates while in the evaporation section of the heat pipes from heat generated by the CRDM and moves out of the evaporation section into the condensation section in the heat fins. The fluid cools and condensates while in the condensation section, recirculating back into the evaporation section. This passive natural circulation cooling system reduces or eliminates the number of water hoses, piping, and other water pumping equipment typically used for cooling a CRDM thereby increasing nuclear reactor reliability and simplifying nuclear reactor operation and maintenance.

Lobscheid, Christian↗

Improvements Realized on the NiThrow{sup TM} Solution - 13075

Two years ago we presented the first results obtained with the highly pressurized liquid nitrogen technology (HPLN) in case of cutting, surface decontamination and concrete scabbling applications. These results, carried out in non active conditions, were really promising in term of efficiency and productivity and highlighted how this technology was interesting for D and D business (e.g. cut of depth up to 30 mm for concrete scabbling application; productivity of 4 cm.min{sup -1} in case of the cut of a 50 mm thick stainless steel ingot..). We also found some real issues which were not compatible with its use in a radioactive environment. Indeed, the reliability of some parts of the system was not efficient enough (e.g. lancing tool, intensifiers...) to run the HPLN technology in good conditions. More than two years, after a complete study of the whole system, and after the compilation of all the required troubleshooting, AREVA with its partner Air Liquide, decided to start a complete R and D work in order to improve this cryogenic technology. Our engineers started with the lancing tool and designed a new one lighter and more reliable than the original one. After that, they improved the reliability of the pressurization unit (skid) by changing seals and other parts. As mentioned above, the goal of this work was to implement this technology in a nuclear environment the best way. We also focused our efforts on the insulation of the high pressure hoses (with a maximal distance, between the 'skid - Heat exchanger' module and the lancing tool, of about 110 meters), and on the development of a quite efficient vacuum system comprising dust collection units (we can guarantee an efficiency of our system higher than 95%). Finally, the last step of our development was devoted to the design and the manufacturing of a dedicated carrier enabling the technology to move in all directions (X,Y and Z) and to reach all the positions (wall, ground, ceiling and for sure all the singularities such as corners..). In this paper, the 'step by step' strategy to achieve those ambitious developments will be presented with a special attention to the NiThrow{sup TM} carrier development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical System Decontamination at PWR Power Stations Biblis A and B by Advanced System Decontamination by Oxidizing Chemistry (ASDOC-D) Process Technology - 13081

For chemical decontamination of PWR primary systems the so called ASDOC-D process has been developed and qualified at the German PWR power station Biblis. In comparison to other chemical decontamination processes ASDOC-D offers a number of advantages: - ASDOC-D does not require separate process equipment but is completely operated and controlled by the nuclear site installations. Feeding of chemical concentrates into the primary system is done by means of the site's dosing systems. Process control is performed by standard site instrumentation and analytics. - ASDOC-D safely prevents any formation and precipitation of insoluble constituents - Since ASDOC-D is operated without external equipment there is no need for installation of such equipment in high radioactive radiation surrounding. The radioactive exposure rate during process implementation and process performance may therefore be neglected in comparison to other chemical decontamination processes. - ASDOC-D does not require auxiliary hose connections which usually bear high leakage risk. The above mentioned technical advantages of ASDOC-D together with its cost-effectiveness gave rise to Biblis Power station to agree on testing ASDOC-D at the volume control system of PWR Biblis unit A. By involving the licensing authorities as well as expert examiners into this test ASDOC-D received the official qualification for primary system decontamination in German PWR. As a main outcome of the achieved results NIS received contracts for full primary system decontamination of both units Biblis A and B (each 1.200 MW) by end of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Present status and future plans for the restoration of Fukushima Daiichi NPS

There are many challenges at Fukushima-Daiichi Nuclear Power Station, even though the reactors have reached a condition equivalent to cold shutdown. Cooling of reactors is maintained using the circulating cooling system, which contains some temporary equipments and consists of long pipes reaching to about 4 km. The reliability of the cooling system is one of the keys to maintaining the stabilized condition. Therefore a variety of activities, such as the replacement of hoses with more durable pipes, is being conducted to improve the reliability of the cooling system. The first fuel bundle will be removed from the spent fuel pool (SFP) at Unit 4 in November, which is earlier than the original plan. In preparation for the fuel debris removal, investigations inside the primary containment vessel (PCVs) have been initiated. Visual images and other data, such as water level, radiation dose and temperature inside the PCVs, have been taken at Units 1 and 2. The issue of excessive contaminated water is the most urgent one. About 400 tons of ground water is intruding into the turbine and reactor buildings every day. This intruding water mixes with the core cooling water and becomes a large amount of contaminated water. It has to be stored on the site, despite the fact that some radioactive nuclides remain in it even after cesium is removed. The amount of water stored on the site has reached about 290,000 tons so far and is increasing. Counter measures for this issue, such as reduction of intruding water, cleaning up of the contaminated water and securing of water storage tanks, are under consideration and being conducted. However, certain recent events, such as the power loss of the SFP cooling systems and leakage of contaminated water from the underground tanks, have raised concerns about reliability. Vulnerabilities have been evaluated systematically and counter measures are being taken. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INL transient reactor restart progress

The United States Department of Energy (DOE) has authorized resumption of transient testing and the restart of the Transient Reactor Test (TREAT) facility. The TREAT reactor was used from 1959 to 1994 to conduct more than 2800 nuclear fuel transient tests prior to being placed in standby in 1994. The plant was extensively upgraded shortly before it was placed in standby. Present day assessments revealed that a sound infrastructure remains at the plant. The assessments included extensive walk-downs and subsequent functional testing. The testing was broad in scope, but ensured that any plant operability issues, including age related degradation were discovered and resolved. The primary age related degradation found was capacitors in Reactor Trip System and Automatic Reactor Control System power supplies. The majority of low voltage power supplies required replacement. Although minimal degradation was evident, in some cases elastomers such as hydraulic hoses were preemptively replaced to take advantage of the existing maintenance window and ensure future reliable operation. Configuration management has been extensively reviewed and the plant components re-labeled using modern standards. The re-labeling required extensive work including updates to plant drawings and procedures. The plant organization has been established to restart the reactor and will subsequently seamlessly transition to reactor operations. For the restart effort, the operating organization is being supplemented by subcontractors including some personnel who were involved in TREAT historical operations. During 2015 and the first half of 2016 substantial progress has been made to renew reactor systems and infrastructure, update procedures and configuration management documents, and put in place a qualified operating organization. Reactor startup is anticipated no later than 2018. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vacuum drying of spent fuel storage canisters/casks - 'just how much water could be left in there, anyway?' - 15233

The process of moving spent fuel assemblies from wet storage in the spent fuel pool to dry storage in an inert gas environment within a canister or cask typically involves two main stages. In the first stage, the bulk of the water is removed by a draining or siphoning operation, conducted with pressure inside the canister maintained at 1.3 to 2 atm. This process removes most of the water in the cask cavity, but residual water can be left behind, in three main regions. The largest region, typically, is the bottom of the cavity below the end of the siphon tube. A second general class of locations, also located at the bottom of the cask cavity, consists of the 'dashpots' at the ends of the various non-fuel tubular structures within the fuel assemblies. For PWR assemblies, these are the control rod guide sleeve tubes and instrumentation thimbles. For BWR assemblies, these are the water rods of various designs and control blade ends in some configurations. A third class of locations consists of porous material within the cavity that can absorb water, such as thin ceramic neutron poison plates, and ostensibly intact fuel rods that nevertheless might have pinholes or fine cracks in the cladding that could allow pool water to creep inside the fuel rod. To remove residual water from these locations, the second stage of drying operations utilizes vacuum drying, by reducing the pressure sufficiently to convert the water to vapor that can then be pumped out of the canister cavity. In this operation, the cask cavity pressure is slowly reduced from the nominal condition of (1.3-2.0 atm (1000-1520 torr), to a final target pressure below 3 torr (0.004 atm). This is typically accomplished in three to five stages, with prescribed 'hold' points defined in procedures or in the Technical Specifications, to preclude sudden pressure spikes due to flashing of water to steam, or development of large local temperature gradients in the fuel rods or other cask internal components. This paper discusses the various locations in the system where residual water may 'hang up' in the cask, and presents a discussion of the physical basis for the effectiveness of vacuum drying for removing it. Results and conclusions based on realistic qualitative and quantitative evaluations of the transient heat transfer behavior of the system are presented, based on detailed modeling of a range of spent fuel canister designs and decay heat loads, most notably the 24P Dry Shielded Canisters (DSCs) stored at the Rancho Seco Independent Spent Fuel Storage Installation (ISFSI), the NAC-MPC modules at Maine Yankee, the 24P DSCs stored at Calvert Cliffs, and the Holtec HI-STORM modules at Hope Creek. The evaluations presented here show that ice formation within a spent fuel canister is highly unlikely, due to the availability of a large thermal source term in the form of the decay heat load of the spent fuel. The formation of ice is an operational concern, since it mainly affects operation of equipment external to the canister (i.e., the hoses, valves, and fittings of the vacuum drying equipment.) Evaluations are presented for quantifying the amount of residual water that could remain in the cask cavity, even after successful drying operations, since vacuum drying is a limit process, and by definition, cannot remove all of the water from the cavity, no matter how long the operation goes on, even if all of it is in vapor form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

241-AY-102 Leak detection pit drain line visual inspection - 15678

In October 2012, Washington River Protection Solutions LLC (WRPS) determined that waste had leaked into the annulus of Tank 241-AY-102. WRPS conducted an extensive review of Tank AY-102 and increased both inspection and monitoring of the tank; however, the precise cause and location of the leak could not be determined. In parallel with the leak in the primary tank, the Tank AY-102 leak detection pit (LDP) was accumulating water through the drain system external to the secondary tank liner. Liquid collecting in the LDP is suspected to be from water intrusion and collects at a rate such that the LDP must be pumped routinely. Following a routine pumping event on June 20, 2013, elevated radiation dose rates were noted on the transfer hose and surface contamination readings were found on the transfer pump when it was removed from the Tank AY-102 LDP. These two field readings suggested that tank waste from a secondary liner breach could be leaking into the LDP. As a result, WRPS initiated a plan to ascertain the integrity of the secondary tank liner including a robotic inspection of the LDP. To perform the robotic visual inspection, a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest for WRPS to inspect the 6 in (152 mm) leak detection pit drain line. To ensure success when deployed in the field, the inspection equipment was demonstrated at both the IHI facility in Denver, Colorado, and the Hanford Site using full scale piping mockups. On November 20, 2013 WRPS inspected the 6 in (152 mm) diameter drain line. The deployment device successfully attached to the drain line, and the crawler entered the drain line and traversed to within approximately 7 ft (2.1 m) of the central sump located under the center of the tank before losing traction. Crawler performance was satisfactory, and the quality of the camera image and lighting provided sufficient detail to document the current condition of the visible regions of the pipe. The inspection showed that the majority of the drain line was dry. Two wet areas were observed, a portion of the line nearest the LDP and a portion near the center of the tank. The portion nearest the LDP was under water prior to pumping on November 14, 2013. Although sediment and debris were seen during the inspection, it is believed to be construction debris and corrosion products. No material was found in the inspection that looked like tank waste or the material seen in the Tank AY-102 annulus (i.e., no greenish or yellowish deposits or dark fluids, dried salt deposits, or crystalline material). The contamination levels seen on the crawler were consistent with past values seen on LDP pumping equipment. Sampling and analysis of the recovered residues from the crawlers did not find material consistent with tank waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Additive Manufacturing Advances to Facilitate Novel Robot and Remote System Construction - 18493

Additive manufacturing (AM), in both polymer and metal, has advanced to the point where it can significantly facilitate robot and remote system design and implementation. Properly used AM creates features and capabilities otherwise not possible in machined or cast products. AM design rules are still being developed and must be applied differently based on the process and purpose of the final component, but progress is being made in practical implementation. Polymer-based AM has been commercially available for quite some time and is regularly used for prototyping and test fitting parts before they are fabricated from metal or produced in low production quantity parts that do not require high structural strength. Metal printing processes are more diverse than polymer print processes. Both polymer and metal printing systems can be used to make parts or complete systems for robotics. Two implementation examples that illustrate the possibilities and identify issues that remain in metal printing are: a dual arm hydraulic manipulator and a distal link of an excavator arm. The dual arm hydraulic manipulator was printed in titanium using an e-beam fusing process. All hydraulics and electrical cabling passageways were printed into the manipulator; there are no external hoses or cables. The distal link of an excavator arm was printed using a wire-fed metal inert gas process. The excavator was then used for digging as part of an equipment exposition validating the structural integrity of the printed part. (authors)

3D PRINTING↗

Decontamination Experiments and Simulations Supporting Recovery After Widespread Contamination - 18685

Clean-up after an uncontrolled nuclear material release differs from common decontamination practices in the nuclear industry and military combat scenarios. Uncontrolled releases, particularly acts of terror, require specific protective actions guides (PAGs) to optimize short and long-term repercussions. Ideally, non-destructive decontamination methods would be employed. To help fulfill this need, the IWATERS (Integrated Wash Aid Treatment Emergency Reuse System) was proposed in 2014 for remediation outside the immediate blast area. 'Wash-Aid' is hosed onto affected areas, and the used wash solution is collected and recycled through sand/clay beds. To help characterize the IWATERS technology, the below was completed: - Decontamination experiments with a pressurized wash solution using Cs-137, Sr- 85, and Eu-152 contaminants on porous urban materials. - Sensitivity analyses on recycling bed variables using GoldSim{sup TM} CT. - A proposed framework that expands the recycling bed model to include probabilistic simulation of immediate recovery efforts. Removal efficacy of tap water and 0.5 M KCl were compared for Cs, Sr, and Eu across asphalt, brick, and concrete. The 0.5 M KCl solution significantly outperformed tap water in every case except for Eu on concrete and Cs on brick. Trends in the high-pressure decontamination with salt additive compared to low pressure decontamination show evidence of physical and chemical removal. Variations in cleaning rate yielded no significant trend. Pressure changes (by adjusting nozzle-to-coupon distance) were only significant for the highest pressure. Hypothetical Contamination Scenario: To tie the decontamination experiments and recycling bed model together, a small contamination scenario was created. Imagine the sides of a small concrete building uniformly contaminated with Cs-137. Power washing the building with 0.5 M KCl solution would result in 857 L of contaminated solution generated in 185 minutes. Two sand clay beds were designed to clean the used solution. With a sand mass fraction of 0.9, a 10 ft{sup 2} bed 4 ft tall could recycle the solution in 1.05 hrs. Changing the sand mass fraction to 0.5 yielded a 2.5 ft{sup 2} bed 4 ft tall (∼55-gallon drum) that recycled the solution in 7.43 hrs. This exercise showed how the sand/clay bed design can easily change to match the primary remediation goals. The second sand/clay bed would reduce the waste generation while the first bed reduces the remediation time. Conclusions: Variations on speed and nozzle distance (pressure) yielded insignificant differences in efficacy except for the closest distance. High-pressure washing showed increased decontamination efficacy with KCl additive in the majority of cases. Except for bed composition, key recycling bed parameters can be varied on-the-fly. This allows for optimization of, for example, time and waste generation. The hypothetical contamination scenario showed pairing decontamination experiment results with modeling tools can lead to increased preparedness for a large-scale contamination event. With collaboration and time, an expanded recovery/remediation model could aid in development of effective protective action guides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operator Action Time Evaluation of Emergency Water Injection Strategy for Extreme SGTR Accidents

In terms of severe accidents caused by earthquakes or tsunamis that are beyond expectation, a special safety inspection for operating plants, following the Fukushima accident, has been conducted by the government of Korea to verify that nation's nuclear power plants have been adequately designed to respond to extreme accidents. The inspection results show that Korean nuclear power plants in operation have no imminent risk for an expected maximum potential earthquake or coastal flooding based on the up-to-date investigation. However, there is a need to implement long- and short-term safety improvements in order to secure the level of safety for natural beyond-design-basis events. One of the measures to increase the mitigation capability during extreme accidents is installing the injection flow paths to provide emergency cooling water of extemal sources using fire engines to the steam generators (SGs) or reactor cooling system (RCS). An emergency cooling water system consists of a fixed pipe connected from the RCS or SGs to the outside of the containment. A standby valve is installed on the pipe. Following the occurrence of an extreme accident, movable equipment (for example, a fire truck hose) can be connected to the pipe hole at the opening of the isolation valve. The emergency cooling water injection strategy was not taken into account for the steam generator tube rupture (SGTR) accident management strategy of the OPR-1000. Therefore, it is necessary to develop some guidelines or strategies to cope with an extreme SGTR scenarios using the newly installed injection flow paths and fire engines. As long as the fission products released from the core during severe accidents are kept inside the containment, there may be several ways to reduce the radionuclide release into the environment, for example, by using plant safety features. The containment bypass sequences, however, allow the fission products to be released into the environment or directly to the auxiliary building. The SGTR accidents, which are one of the containment bypass sequences, have shown during various probabilistic safety assessments (PSAs) to be contributors to plant risk, mainly because of their potential for causing a release outside containment. This paper is intended to be an investigation of the characteristics of accident progressions and assessments for the mitigative effectiveness of the external cooling water injection strategies during extreme SGTR accidents in a typical OPR-1000 plant. Analyses were performed using a MAAP computer code version 5.03. The MAAP code is a system-level computer code capable of conducting integral analyses of potential severe accident progressions in nuclear power plants, whose main purpose is to support a level 2 PSA or severe accident management strategy developments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗