Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Space Shuttle Program Update

Bruce Buckingham, from NASA Public Affairs, introduces Wayne Hale, Space Shuttle Program Manager, and Mike Leinbach, NASA launch Director. Wayne Hale begins discussing the Flight Readiness Review (FRR) that has just occurred to see if they were ready to fly. He points out that the review was a debris verification review (DVR). This review was done to ascertain how well they have done to eliminate the potential for debris to come off of the External Tank (ET), or any other part of the launch vehicle. He expresses that they have made significant improvements to the ET. He gives a description of the ET that is presently on the launch pad. Mike Leinbach discusses hardware processing and the condition of the launch vehicle. Questions from the news media about possible modifications to the ice frost ramp, Solid Rocket Booster (SRB) electrical problems, ET foam loss, amount of debris loss expectation during ascent, and return to flight costs are all addressed.

Source record↗

Simulation Assisted Risk Assessment Applied to Launch Vehicle Conceptual Design

A simulation-based risk assessment approach is presented and is applied to the analysis of abort during the ascent phase of a space exploration mission. The approach utilizes groupings of launch vehicle failures, referred to as failure bins, which are mapped to corresponding failure environments. Physical models are used to characterize the failure environments in terms of the risk due to blast overpressure, resulting debris field, and the thermal radiation due to a fireball. The resulting risk to the crew is dynamically modeled by combining the likelihood of each failure, the severity of the failure environments as a function of initiator and time of the failure, the robustness of the crew module, and the warning time available due to early detection. The approach is shown to support the launch vehicle design process by characterizing the risk drivers and identifying regions where failure detection would significantly reduce the risk to the crew.

Mathias, Donovan L.↗

Launch Order, Launch Separation, and Loiter in the Constellation 1 1/2-Launch Solution

The NASA Constellation Program (CxP) is developing a two-element Earth-to-Orbit launch system to enable human exploration of the Moon. The first element, Ares I, is a human-rated system that consists of a first stage based on the Space Shuttle Program's solid rocket booster (SRB) and an upper stage that consists of a four-crew Orion capsule, a service module, and a Launch Escape System. The second element, Ares V, is a Saturn V-plus category launch system that consists of the core stage with a cluster of six RS-68B engines and augmented with two 5.5-segment SRBs, a Saturn-derived J-2X engine powering an Earth Departure Stage (EDS), and the lunar-lander vehicle payload, Altair. Initial plans called for the Ares V to be launched first, followed the next day by the Ares I. After the EDS performs the final portion of ascent and subsequent orbit circularization, the Orion spacecraft then performs a rendezvous and docks with the EDS and its Altair payload. Following checkout, the integrated stack loiters in low Earth orbit (LEO) until the appropriate Trans-Lunar Injection (TLI) window opportunity opens, at which time the EDS propels the integrated Orion Altair to the Moon. Successful completion of this 1 1/2-launch solution carries risks related to both the orbital lifetime of the assets and the probability of achieving the launch of the second vehicle within the orbital lifetime of the first. These risks, which are significant in terms of overall system design choices and probability of mission success, dictated a thorough reevaluation of the launch strategy, including the order of vehicle launch and the planned time period between launches. The goal of the effort described in this paper was to select a launch strategy that would result in the greatest possible expected system performance, while accounting for launch risks and the cost of increased orbital lifetime. Discrete Event Simulation (DES) model of the launch strategies was created to determine the probability of a second launch not occurring in a timely fashion (i.e., before the assets waiting in LEO expire). An overview of the launch strategy evaluation process is presented, along with results of specific cases that were analyzed. A high-level comparison of options is then presented, along with the conclusion derived from the analysis.

Stromgren, Chel↗

CASIS Fact Sheet: Hardware and Facilities

Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS

Solomon, Michael R.↗

Enabling Future Low-Cost Small Mission Concepts

A SmallSat using a small Radioisotope Power System for deep space destinations could potentially fit into a Discovery class mission cost cap and perform significant science with a timely return of data. Only applicable when the Discovery 12 guidelines were applied. Commonality of hardware and science instruments among identical spacecraft enabled to meet the Discovery Class mission cost cap. Multiple spacecraft shared the costs of the Launch Approval Engineering Process. Assumed a secondary science instrument was contributed. Small RPS could provide small spacecraft with a relatively high power (approx. 60 We) option for missions to deep space destinations (> 10 AU) with multiple science instruments. Study of Centaur mission demonstrated the ability to achieve New Frontiers level science. Multiple spacecraft possible with small RPS, allowing for multiple targets, science from multiple platforms, and/or redundancy.

Lee, Young↗

Interplanetary Trajectory Design for NASA's Common Probe Study

The Galileo Probe, Pioneer-Venus probes, and SPRITE concept all share a number of common characteristics. They all follow a similar entry and descent sequence, using an aeroshell to protect against entry environments, and parachutes to aid in extrusion and descent speed control of the descent vehicle containing the science instruments. The descent vehicles all contained similar instruments (e.g. mass spectrometers and atmosphere structure sensors), and data was either relayed back to a carrier spacecraft (Galileo Probe, SPRITE) or transmitted direct to Earth (Pioneer-Venus). Based on these similar characteristics, NASA initiated a study to investigate a “common probe' that might be designed to perform similar science in a variety of planetary environments. This concept would leverage a common aeroshell design, and descent vehicle designs that could be made as similar as possible (the primary exception being that Venus will require a pressure vessel due to the extreme pressures and temperatures seen in the lower portion of the descent). To support the Common Probe study, GSFC and JPL performed a series of interplanetary trajectory analyses to help develop the mission designs for Venus, Jupiter, Saturn, Uranus, and Neptune. Primary considerations in the trajectory modeling included: a maximum of 12-year time of flight (for outer planet destinations), generation of both steep and shallow entry trajectories to each destination (where steep and shallow resulted in approximately 150 g and 50 g peak deceleration during entry at each location), and consideration of the data relay. Gravity assists and trajectories with low delta-V requirements (typically much less than 500 m/s) were also incorporated into the design process to enable launch on existing vehicles such as the Atlas V.

Hughes, Kyle M.↗

Prelaunch Spectral Characterization of the Operational Land Imager-2

The Landsat-9 satellite, launched in September 2021, carries the Operational Land Imager-2 (OLI-2) as one of its payloads. This instrument is a clone of the Landsat-8 OLI and its mission is to continue the operational land imaging of the Landsat program. The OLI-2 instrument is not significantly different from OLI though the instrument-level pre-launch spectral characterization process was much improved. The focal plane modules used on OLI-2 were manufactured as spares for OLI and much of the spectral characterization of the components was performed for OLI. However, while the spectral response of the fully assembled OLI was characterized by a double monochromator system, the OLI-2 spectral characterization made use of the Goddard Laser for Absolute Measurement of Radiance (GLAMR). GLAMR is a system of tunable lasers that cover 350–2500 nm which are fiber-coupled to a 30 in integrating sphere permanently monitored by NIST-traceable radiometers. GLAMR allowed the spectral characterization of every detector of the OLI-2 focal plane in nominal imaging conditions. The spectral performance of the OLI-2 was, in general, much better than requirements. The final relative spectral responses (RSRs) represent the best characterization any Landsat instrument spectral response. This paper will cover the results of the spectral characterization from the component-level to the instrument-level of the Landsat-9 OLI-2.

Landsat-9↗

A Common Approach for the Certifying of International Space Station (ISS) Basic Hardware for Ground Safety

In order to support the International Space Station, as well as any future long term human missions, vast amounts of logistical-type hardware is required to be processed through the various launch sites. This category consists of such hardware as spare parts, replacement items, and upgraded hardware. The category also includes samples for experiments and consumables. One attribute that all these items have is they are generally non-hazardous, at least to ground personnel. Even though the items are non-hazardous, launch site ground safety has a responsibility for the protection of personnel, the flight hardware, and launch site resources. In order to fulfill this responsibility, the safety organization must have knowledge of the hardware and its operations. Conversely, the hardware providers are entitled to a process that is commensurate with the hazard. Additionally, a common system should be in place that is flexible enough to account for the requirements at all launch sites, so that, the hardware provider need only complete one process for ground safety regardless of the launch site.

Kirkpatrick, Paul D.↗

Assessment and forecasting of lightning potential and its effect on launch operations at Cape Canaveral Air Force Station and John F. Kennedy Space Center

Lightning plays a pivotal role in the operation decision process for space and ballistic launches at Cape Canaveral Air Force Station and Kennedy Space Center. Lightning forecasts are the responsibility of Detachment 11, 4th Weather Wing's Cape Canaveral Forecast Facility. These forecasts are important to daily ground processing as well as launch countdown decisions. The methodology and equipment used to forecast lightning are discussed. Impact on a recent mission is summarized.

Weems, J.↗

Space Launch System Day of Launch Loads for Artemis I

NASA’s Space Launch System (SLS) was successfully launched on November 16, 2022. During the years leading up to the first flight, Artemis I, a DOLILU (Day of Launch I-Load Update) process was developed to design, verify, and upload the first stage flight trajectory on day-of-launch to ensure a safe flight. The evaluation of integrated vehicle loads is a key component of the DOLILU process. The SLS Artemis I DOL loads project has involved methodology development, software development, software testing and certification, operator training, and simulation and launch support. The resulting DOL process successfully calculated loads for all launch opportunities within the window, with the robust nature of the process contributing to all opportunities being go for loads.

SLS↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

The Development of the Ares I-X Flight Test

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

Ess, Robert H.↗

Proposal for Ground Safety Review Coordination at ISS Launch Sites

As the transportation of ISS payloads and cargo shifts from KSC to other launch sites, close coordination of ground safety review processes would be of benefit to all parties. The benefit would have the launch sites receiving consistent data that would require less effort to review while still meeting their needs. Until recently, ground safety focus for the ISS program has been almost exclusively for prelaunch processing at KSC/post-landing processing at KSC/DFRC Each launch site, used by the ISS Program, has a ground safety review process. Ground safety viewed as local prerogative. Up till now, ground processing has consisted of low risk/low hazard items; but this will not always be the case. Recent coordination issues associated with the ground safety review of ORU's to be processed at Tanegashima for HTV-2, illustrate that IP ground safety review processes are not well understood by the ISS community at large. Confusion for data providers (US only?). Lack of internal review process for data being submitted to launch sites can lead to inconsistent submittals. NCRs/HRs. Majority of IP ground safety requirements are based upon old KHB 1700.7 (now KNPR 8715.3, Chapter 20). Proposals include: Establish a ground safety working group as part of the MS&MAP. Search for efficiencies in requirements and data submittal processes. Document processes in NSTS 13830/SSP 30599. Each launch site report out its payload ground safety status at the F2F (Monthly's as required). Completions/due dates/NCRs/issues/changes. Establish internal processes for review of ground safety submittals.

Kirkpatrick, Paul D.↗

Decision Support Systems for Launch and Range Operations Using Jess

The virtual test bed for launch and range operations developed at NASA Ames Research Center consists of various independent expert systems advising on weather effects, toxic gas dispersions and human health risk assessment during space-flight operations. An individual dedicated server supports each expert system and the master system gather information from the dedicated servers to support the launch decision-making process. Since the test bed is based on the web system, reducing network traffic and optimizing the knowledge base is critical to its success of real-time or near real-time operations. Jess, a fast rule engine and powerful scripting environment developed at Sandia National Laboratory has been adopted to build the expert systems providing robustness and scalability. Jess also supports XML representation of knowledge base with forward and backward chaining inference mechanism. Facts added - to working memory during run-time operations facilitates analyses of multiple scenarios. Knowledge base can be distributed with one inference engine performing the inference process. This paper discusses details of the knowledge base and inference engine using Jess for a launch and range virtual test bed.

Thirumalainambi, Rajkumar↗

Spacecraft Charging Issues for Launch Vehicles

Spacecraft charging is well known threat to successful long term spacecraft operations and instrument reliability in orbits that spend significant time in hot electron environments. In recent years, spacecraft charging has increasingly been recognized as a potentially significant engineering issue for launch vehicles used to deploy spacecraft using (a) low Earth orbit (LEO), high inclination flight trajectories that pass through the auroral zone, (b) geostationary transfer orbits that require exposures to the hot electron environments in the Earths outer radiation belts, and (c) LEO escape trajectories using multiple phasing orbits through the Earths radiation belts while raising apogee towards a final Earth escape geometry. Charging becomes an issue when significant areas of exposed insulating materials or ungrounded conductors are used in the launch vehicle design or the payload is designed for use in a benign charging region beyond the Earths magnetosphere but must survive passage through the strong charging regimes of the Earths radiation belts. This presentation will first outline the charging risks encountered on typical launch trajectories used to deploy spacecraft into Earth orbit and Earth escape trajectories. We then describe the process used by NASAs Launch Services Program to evaluate when surface and internal charging is a potential risk to a NASA mission. Finally, we describe the options for mitigating charging risks including modification of the launch vehicle andor payload design and controlling the risk through operational launch constraints to avoid significant charging environments.

Electrostatics↗

Spacecraft Charging Issues for Launch Vehicles

Spacecraft charging is well known threat to successful long term spacecraft operations and instrument reliability in orbits that spend significant time in hot electron environments. In recent years, spacecraft charging has increasingly been recognized as a potentially significant engineering issue for launch vehicles used to deploy spacecraft using (a) low Earth orbit (LEO), high inclination flight trajectories that pass through the auroral zone, (b) geostationary transfer orbits that require exposures to the hot electron environments in the Earths outer radiation belts, and (c) LEO escape trajectories using multiple phasing orbits through the Earths radiation belts while raising apogee towards a final Earth escape geometry. Charging becomes an issue when significant areas of exposed insulating materials or ungrounded conductors are used in the launch vehicle design or the payload is designed for use in a benign charging region beyond the Earths magnetosphere but must survive passage through the strong charging regimes of the Earths radiation belts. This presentation will first outline the charging risks encountered on typical launch trajectories used to deploy spacecraft into Earth orbit and Earth escape trajectories. We then describe the process used by NASAs Launch Services Program to evaluate when surface and internal charging is a potential risk to a NASA mission. Finally, we describe the options for mitigating charging risks including modification of the launch vehicle and/or payload design and controlling the risk through operational launch constraints to avoid significant charging environments

electrostatics↗

Considerations for the next manned transportation system - Is a personnel launch system the answer?

The process that NASA is using to determine the high-level requirements for the next manned transportation system (MTS) is discussed. The primary attributes that the MTS must possess are outlined. Three options that could provide assured access to LEO for people are examined: (1) Shuttle evolution, (2) an advanced manned launch system, and (3) a Personnel Launch System.

Erwin, Harry O.↗