Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Enabling Future Low-Cost Small Mission Concepts

A SmallSat using a small Radioisotope Power System for deep space destinations could potentially fit into a Discovery class mission cost cap and perform significant science with a timely return of data. Only applicable when the Discovery 12 guidelines were applied. Commonality of hardware and science instruments among identical spacecraft enabled to meet the Discovery Class mission cost cap. Multiple spacecraft shared the costs of the Launch Approval Engineering Process. Assumed a secondary science instrument was contributed. Small RPS could provide small spacecraft with a relatively high power (approx. 60 We) option for missions to deep space destinations (> 10 AU) with multiple science instruments. Study of Centaur mission demonstrated the ability to achieve New Frontiers level science. Multiple spacecraft possible with small RPS, allowing for multiple targets, science from multiple platforms, and/or redundancy.

Lee, Young↗

Interplanetary Trajectory Design for NASA's Common Probe Study

The Galileo Probe, Pioneer-Venus probes, and SPRITE concept all share a number of common characteristics. They all follow a similar entry and descent sequence, using an aeroshell to protect against entry environments, and parachutes to aid in extrusion and descent speed control of the descent vehicle containing the science instruments. The descent vehicles all contained similar instruments (e.g. mass spectrometers and atmosphere structure sensors), and data was either relayed back to a carrier spacecraft (Galileo Probe, SPRITE) or transmitted direct to Earth (Pioneer-Venus). Based on these similar characteristics, NASA initiated a study to investigate a “common probe' that might be designed to perform similar science in a variety of planetary environments. This concept would leverage a common aeroshell design, and descent vehicle designs that could be made as similar as possible (the primary exception being that Venus will require a pressure vessel due to the extreme pressures and temperatures seen in the lower portion of the descent). To support the Common Probe study, GSFC and JPL performed a series of interplanetary trajectory analyses to help develop the mission designs for Venus, Jupiter, Saturn, Uranus, and Neptune. Primary considerations in the trajectory modeling included: a maximum of 12-year time of flight (for outer planet destinations), generation of both steep and shallow entry trajectories to each destination (where steep and shallow resulted in approximately 150 g and 50 g peak deceleration during entry at each location), and consideration of the data relay. Gravity assists and trajectories with low delta-V requirements (typically much less than 500 m/s) were also incorporated into the design process to enable launch on existing vehicles such as the Atlas V.

Hughes, Kyle M.↗

Prelaunch Spectral Characterization of the Operational Land Imager-2

The Landsat-9 satellite, launched in September 2021, carries the Operational Land Imager-2 (OLI-2) as one of its payloads. This instrument is a clone of the Landsat-8 OLI and its mission is to continue the operational land imaging of the Landsat program. The OLI-2 instrument is not significantly different from OLI though the instrument-level pre-launch spectral characterization process was much improved. The focal plane modules used on OLI-2 were manufactured as spares for OLI and much of the spectral characterization of the components was performed for OLI. However, while the spectral response of the fully assembled OLI was characterized by a double monochromator system, the OLI-2 spectral characterization made use of the Goddard Laser for Absolute Measurement of Radiance (GLAMR). GLAMR is a system of tunable lasers that cover 350–2500 nm which are fiber-coupled to a 30 in integrating sphere permanently monitored by NIST-traceable radiometers. GLAMR allowed the spectral characterization of every detector of the OLI-2 focal plane in nominal imaging conditions. The spectral performance of the OLI-2 was, in general, much better than requirements. The final relative spectral responses (RSRs) represent the best characterization any Landsat instrument spectral response. This paper will cover the results of the spectral characterization from the component-level to the instrument-level of the Landsat-9 OLI-2.

Landsat-9↗

A Common Approach for the Certifying of International Space Station (ISS) Basic Hardware for Ground Safety

In order to support the International Space Station, as well as any future long term human missions, vast amounts of logistical-type hardware is required to be processed through the various launch sites. This category consists of such hardware as spare parts, replacement items, and upgraded hardware. The category also includes samples for experiments and consumables. One attribute that all these items have is they are generally non-hazardous, at least to ground personnel. Even though the items are non-hazardous, launch site ground safety has a responsibility for the protection of personnel, the flight hardware, and launch site resources. In order to fulfill this responsibility, the safety organization must have knowledge of the hardware and its operations. Conversely, the hardware providers are entitled to a process that is commensurate with the hazard. Additionally, a common system should be in place that is flexible enough to account for the requirements at all launch sites, so that, the hardware provider need only complete one process for ground safety regardless of the launch site.

Kirkpatrick, Paul D.↗

Assessment and forecasting of lightning potential and its effect on launch operations at Cape Canaveral Air Force Station and John F. Kennedy Space Center

Lightning plays a pivotal role in the operation decision process for space and ballistic launches at Cape Canaveral Air Force Station and Kennedy Space Center. Lightning forecasts are the responsibility of Detachment 11, 4th Weather Wing's Cape Canaveral Forecast Facility. These forecasts are important to daily ground processing as well as launch countdown decisions. The methodology and equipment used to forecast lightning are discussed. Impact on a recent mission is summarized.

Weems, J.↗

Space Launch System Day of Launch Loads for Artemis I

NASA’s Space Launch System (SLS) was successfully launched on November 16, 2022. During the years leading up to the first flight, Artemis I, a DOLILU (Day of Launch I-Load Update) process was developed to design, verify, and upload the first stage flight trajectory on day-of-launch to ensure a safe flight. The evaluation of integrated vehicle loads is a key component of the DOLILU process. The SLS Artemis I DOL loads project has involved methodology development, software development, software testing and certification, operator training, and simulation and launch support. The resulting DOL process successfully calculated loads for all launch opportunities within the window, with the robust nature of the process contributing to all opportunities being go for loads.

SLS↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

The Development of the Ares I-X Flight Test

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

Ess, Robert H.↗

Proposal for Ground Safety Review Coordination at ISS Launch Sites

As the transportation of ISS payloads and cargo shifts from KSC to other launch sites, close coordination of ground safety review processes would be of benefit to all parties. The benefit would have the launch sites receiving consistent data that would require less effort to review while still meeting their needs. Until recently, ground safety focus for the ISS program has been almost exclusively for prelaunch processing at KSC/post-landing processing at KSC/DFRC Each launch site, used by the ISS Program, has a ground safety review process. Ground safety viewed as local prerogative. Up till now, ground processing has consisted of low risk/low hazard items; but this will not always be the case. Recent coordination issues associated with the ground safety review of ORU's to be processed at Tanegashima for HTV-2, illustrate that IP ground safety review processes are not well understood by the ISS community at large. Confusion for data providers (US only?). Lack of internal review process for data being submitted to launch sites can lead to inconsistent submittals. NCRs/HRs. Majority of IP ground safety requirements are based upon old KHB 1700.7 (now KNPR 8715.3, Chapter 20). Proposals include: Establish a ground safety working group as part of the MS&MAP. Search for efficiencies in requirements and data submittal processes. Document processes in NSTS 13830/SSP 30599. Each launch site report out its payload ground safety status at the F2F (Monthly's as required). Completions/due dates/NCRs/issues/changes. Establish internal processes for review of ground safety submittals.

Kirkpatrick, Paul D.↗

Decision Support Systems for Launch and Range Operations Using Jess

The virtual test bed for launch and range operations developed at NASA Ames Research Center consists of various independent expert systems advising on weather effects, toxic gas dispersions and human health risk assessment during space-flight operations. An individual dedicated server supports each expert system and the master system gather information from the dedicated servers to support the launch decision-making process. Since the test bed is based on the web system, reducing network traffic and optimizing the knowledge base is critical to its success of real-time or near real-time operations. Jess, a fast rule engine and powerful scripting environment developed at Sandia National Laboratory has been adopted to build the expert systems providing robustness and scalability. Jess also supports XML representation of knowledge base with forward and backward chaining inference mechanism. Facts added - to working memory during run-time operations facilitates analyses of multiple scenarios. Knowledge base can be distributed with one inference engine performing the inference process. This paper discusses details of the knowledge base and inference engine using Jess for a launch and range virtual test bed.

Thirumalainambi, Rajkumar↗

Spacecraft Charging Issues for Launch Vehicles

Spacecraft charging is well known threat to successful long term spacecraft operations and instrument reliability in orbits that spend significant time in hot electron environments. In recent years, spacecraft charging has increasingly been recognized as a potentially significant engineering issue for launch vehicles used to deploy spacecraft using (a) low Earth orbit (LEO), high inclination flight trajectories that pass through the auroral zone, (b) geostationary transfer orbits that require exposures to the hot electron environments in the Earths outer radiation belts, and (c) LEO escape trajectories using multiple phasing orbits through the Earths radiation belts while raising apogee towards a final Earth escape geometry. Charging becomes an issue when significant areas of exposed insulating materials or ungrounded conductors are used in the launch vehicle design or the payload is designed for use in a benign charging region beyond the Earths magnetosphere but must survive passage through the strong charging regimes of the Earths radiation belts. This presentation will first outline the charging risks encountered on typical launch trajectories used to deploy spacecraft into Earth orbit and Earth escape trajectories. We then describe the process used by NASAs Launch Services Program to evaluate when surface and internal charging is a potential risk to a NASA mission. Finally, we describe the options for mitigating charging risks including modification of the launch vehicle andor payload design and controlling the risk through operational launch constraints to avoid significant charging environments.

Electrostatics↗

Spacecraft Charging Issues for Launch Vehicles

Spacecraft charging is well known threat to successful long term spacecraft operations and instrument reliability in orbits that spend significant time in hot electron environments. In recent years, spacecraft charging has increasingly been recognized as a potentially significant engineering issue for launch vehicles used to deploy spacecraft using (a) low Earth orbit (LEO), high inclination flight trajectories that pass through the auroral zone, (b) geostationary transfer orbits that require exposures to the hot electron environments in the Earths outer radiation belts, and (c) LEO escape trajectories using multiple phasing orbits through the Earths radiation belts while raising apogee towards a final Earth escape geometry. Charging becomes an issue when significant areas of exposed insulating materials or ungrounded conductors are used in the launch vehicle design or the payload is designed for use in a benign charging region beyond the Earths magnetosphere but must survive passage through the strong charging regimes of the Earths radiation belts. This presentation will first outline the charging risks encountered on typical launch trajectories used to deploy spacecraft into Earth orbit and Earth escape trajectories. We then describe the process used by NASAs Launch Services Program to evaluate when surface and internal charging is a potential risk to a NASA mission. Finally, we describe the options for mitigating charging risks including modification of the launch vehicle and/or payload design and controlling the risk through operational launch constraints to avoid significant charging environments

electrostatics↗

Considerations for the next manned transportation system - Is a personnel launch system the answer?

The process that NASA is using to determine the high-level requirements for the next manned transportation system (MTS) is discussed. The primary attributes that the MTS must possess are outlined. Three options that could provide assured access to LEO for people are examined: (1) Shuttle evolution, (2) an advanced manned launch system, and (3) a Personnel Launch System.

Erwin, Harry O.↗

Recent Advances in Near-Net-Shape Fabrication of Al-Li Alloy 2195 for Launch Vehicles

Recent applications in launch vehicles use 2195 processed to Super Lightweight Tank specifications. Potential benefits exist by tailoring heat treatment and other processing parameters to the application. Assess the potential benefits and advocate application of Al-Li near-net-shape technologies for other launch vehicle structural components. Work with manufacturing and material producers to optimize Al-Li ingot shape and size for enhanced near-net-shape processing. Examine time dependent properties of 2195 critical for reusable applications.

Wagner, John↗

SLS Trade Study 0058: Day of Launch (DOL) Wind Biasing

SLS heritage hardware and legacy designs have shown load exceedances at several locations during Design Analysis Cycles (DAC): MPCV Z bending moments; ICPS Electro-Mechanical Actuator (EMA) loads; Core Stage loads just downstream of Booster forward interface. SLS Buffet Loads Mitigation Task Team (BLMTT) tasked to study issue. Identified low frequency buffet load responses are a function of the vehicle's total angle of attack (AlphaTotal). SLS DOL Wind Biasing Trade team to analyze DOL wind biasing methods to limit maximum AlphaTotal in the M0.8 - 2.0 altitude region for EM-1 and EM-2 missions through investigating: Trajectory design process; Wind wavelength filtering options; Launch availability; DOL process to achieve shorter processing/uplink timeline. Trade Team consisted of personnel supporting SLS, MPCV, GSDO programs.

Decker, Ryan K.↗

Pioneer 10 and 11 interstellar studies

The Pioneer 10 spacecraft may soon be the first man-made object to leave our solar system and penetrate the heliospheric boundary into interstellar space. Scientific investigators on this mission eagerly anticipate the opportunity to measure the physical processes occurring in the terminal boundary region and in the unexplored space known as the interstellar medium by astronomers who have studied it remotely with telescopes for many years. This paper is a descriptive overview of the Pioneer 10 mission and the dominant physical processes that have been discovered since its 1972 launch into our heliosphere and those processes that we expect to see at the boundary and in the interstellar medium.

Dyal, P.↗

Characterization of 10-ft. Diameter Aluminum Alloy 2219 Integrally Stiffened Cylinders

The integrally stiffened cylinder (ISC) process, pioneered by NASA Langley Research Center, offers significant savings for launch vehicle structures. The ISC process is a near net shape, advanced manufacturing method for fabrication of single-piece, thin-walled barrels with internal longitudinal stiffeners, eliminating the need for longitudinal welding and machining. A cost-benefit analysis of the ISC process estimated a 50 % reduction in manufacturing costs and a 10% weight savings over the current multi-piece, machined and welded construction approach for stiffened barrels. In 2017, commercial-scale manufacturing trials were pursued, leading to a successful manufacturing demonstration of 10-ft. diameter ISC barrels fabricated from Al alloy 2219. Some cracking was observed in the stiffeners during fabrication. Optical metallography was performed to evaluate the as-formed microstructures to identify potential causes of cracking, along with mechanical testing to evaluate formability. Results revealed that cracking in the stiffeners was attributed to three likely causes: 1) large Al-Cu stringer particles, 2) stick-slip friction between the mandrel and ISC due to non-optimized lubrication, and 3) differences in material flow rate between the wall and stiffener locations. Testing to gauge formability revealed a significant decrease in ductility in the longitudinal directional for the as-formed condition, attributed to reduced ductility due to the large Al-Cu stringer particles. These results provide guidance toward materials and processing modifications for future ISC forming trials.

Tayon, Wesley A.↗