Management of disused plutonium sealed sources

The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) has been recovering excess and unwanted radioactive sealed sources since 1999, including more than 2,400 Plutonium (Pu)-238 sealed sources and 653 Pu-239-bearing sources that represent more than 10% of the total sources recovered by GTRI/OSRP to date. These sources have been recovered from hundreds of sites within the United States (US) and around the world. OSRP grew out of early efforts at the Los Alamos National Laboratory (LANL) to recover and disposition excess Plutonium-239 (Pu-239) sealed sources that were distributed in the 1960s and 1970s under the Atoms for Peace Program, a loan-lease program that serviced 31 countries, as well as domestic users. In the conduct of these recovery operations, GTRI/OSRP has been required to solve problems related to knowledge-of-inventory, packaging and transportation of fissile and heat-source materials, transfer of ownership, storage of special nuclear material (SNM) both at US Department of Energy (DOE) facilities and commercially, and disposal. Unique issues associated with repatriation from foreign countries, including end user agreements required by some European countries and denials of shipment, will also be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated - Research Support Facility (RSF) construction time lapse

Haselden Construction and RNL built the 222,000 square-foot Research Support Facility (RSF) for the U.S. Department of Energy (DOE) on the National Renewable Energy Laboratory (NREL) campus. This time lapse video begins on July 23, 2009 and the last shot was taken in June 2010. The building is designed to be a model for sustainable, high-performance building design, and will provide DOE-owned work space for administrative staff who currently occupy leased space in the nearby Denver West Office Park. The engineers and scientists from NREL's Building Technology Program set the energy criteria and the energy design strategies that are making it possible for the RSF to use no more carbon-based energy than is produced by renewables. The RSF was designed by RNL. Stantec Consulting served as the project's engineering, energy modeling and sustainability consultant.

99 GENERAL AND MISCELLANEOUS↗

Supporting Dynamic Spectrum Access in Heterogeneous LTE+ Networks

As early as 2014, mobile network operators’ spectral capac- ity is expected to be overwhelmed by the demand brought on by new devices and applications. With Long Term Evo- lution Advanced (LTE+) networks likely as the future one world 4G standard, network operators may need to deploy a Dynamic Spectrum Access (DSA) overlay in Heterogeneous Networks (HetNets) to extend coverage, increase spectrum efficiency, and increase the capacity of these networks. In this paper, we propose three new management frameworks for DSA in an LTE+ HetNet: Spectrum Accountability Client, Cell Spectrum Management, and Domain Spectrum Man- agement. For these spectrum management frameworks, we define protocol interfaces and operational signaling scenar- ios to support cooperative sensing, spectrum lease manage- ment, and alarm scenarios for rule adjustment. We also quan- tify, through integer programs, the benefits of using DSA in an LTE+ HetNet, that can opportunistically reuse vacant TV and GSM spectrum. Using integer programs, we consider a topology using Geographic Information System data from the Blacksburg, VA metro area to assess the realistic benefits of DSA in an LTE+ HetNet.

42 ENGINEERING↗

Hydrogen powered bus

Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

08 HYDROGEN↗

Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE's Tribal Energy Program Offers Resources

This handbook is an accessible reference for those who are new to tribal energy project development or who seek a refresher on key development issues as they navigate the project development process. Building upon the wealth of feedback and experiences shared by tribal and other participants in tribal energy workshops conducted by the National Renewable Energy Laboratory, it is designed to provide tribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process. It includes information on how to structure a renewable energy project transaction to protect tribal interests, with an emphasis on joint project development efforts undertaken with nontribal parties; a general overview of key energy development agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and a detailed discussion of ways tribes can finance renewable energy projects, the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects. The guide also includes a glossary of some of the most commonly used technical terms.

Biomass↗

Wind Energy Ordinance Fact Sheet

Due to increasing energy demands in the United States and more installed wind projects, rural communities and local governments with limited or no experience with wind energy now have the opportunity to become involved in this industry. Communities with good wind resources may be approached by entities with plans to develop the resource. Although these opportunities can create new revenue in the form of construction jobs and land lease payments, they also create a new responsibility on the part of local governments to create ordinances to regulate wind turbine installations. Ordinances are laws, often found within municipal codes that provide various degrees of control to local governments. These laws cover issues such as zoning, traffic, consumer protection, and building codes. Wind energy ordinances reflect local needs and wants regarding wind turbines within county or city lines and aid the development of safe facilities that will be embraced by the community. Since 2008 when the National Renewable Energy Laboratory released a report on existing wind energy ordinances, many more ordinances have been established throughout the United States, and this trend is likely to continue in the near future as the wind energy industry grows. This fact sheet provides an overview of elements found in typical wind energy ordinances to educate state and local government officials, as well as policy makers.

DOE/GO-102010-3105↗

Treatment of Chlorinated Solvents in Groundwater Beneath an Occupied Building at the Young-Rainey STAR Center, Pinellas, FL

Groundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (also known as the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building 100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. The technical approach consisted of installing horizontal wells from outside the building footprint, extending through and around the identified subsurface treatment areas, and terminating beneath the building. Two 107 m (350 ft) long wells, two 122 m (400 ft) long wells, and four 137 m (450 ft) long wells have been installed to intersect the inferred source areas and confirmed contaminant plumes beneath the building. DOE then injected emulsified vegetable oil and a microbial culture into the horizontal wells at each of several target areas beneath the building where the highest groundwater contaminant concentrations have been detected. The target areas are the northwest corner of the building between the old drum storage pad locations and monitoring well PIN12-S35B, the vicinity of former monitoring well PIN12-S57B, and hydraulically upgradient from the south plume and the east plume at the points where they exit from beneath the building. We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before the full impact of the project will be realized.

54 ENVIRONMENTAL SCIENCES↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming – 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM’s primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE “full administrative jurisdiction” and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites’ radiological safety and long-term public and environmental protection. This “shared-jurisdiction approach” will meet LM’s strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to “manage and conserve the lands under the mandate of multiple-use and sustained yield.” In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets.

54 ENVIRONMENTAL SCIENCES↗

Decision Point 2 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the “CerFab”) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the “ITM Oxygen Development Facility”), and to perform supporting development tasks in materials development an engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 2, which pertains to progress in Materials Development, Engineering Development, and construction of the CerFab, with an emphasis on establishing the environmental permitting required prior to the next Decision Point. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Also in this area, Ceramatec has made significant progress in developing Advanced Architecture wafers and modules by advancing in parallel with two production methods of the Advanced Architecture components and determining the appropriate equipment required to make these components at high volume in the CerFab. Work in this area continues to refine the CerFab requirements. Under Engineering Development, Air Products has developed various concepts around use of ITM in industrial applications to reduce carbon footprint though process integrations that result in less fuel requirement. Air Products also developed notions around hybrid cryogenic air separation plants with ITM Oxygen plants for scale-up test applications. Toward the CerFab, Air Products and Ceramatec have refined the manufacturing process for ceramic membrane modules and developed an equipment layout in the Tooele, Utah, facility that was leased earlier this year. Based on the refined specification, Air Products determined material flows in the CerFab facility, including emissions calculations that form the basis for seeking the various environmental permits required by the project. The permits and permitting schedule is described. Finally, the Project and Staffing statuses are summarized. Based on the considerable progress at this juncture in the program, Air Products recommends proceeding to develop detailed equipment specifications for the CerFab and to continue the development work in the other tasks, such that a complete and comprehensive assessment of project prior to construction of the CerFab can be made at the next Decision Point.

Armstrong, Phillip↗

Imagining the Future of Electric Vehicles and the Batteries that will Drive them

Battery breakthroughs are critical, but it is important to keep in mind that a widespread and robust transportation infrastructure based primarily on EV's will require advances not only in batteries, but in many other areas such as power electronics, next-gen vehicle designs, consumer behavior, new business models, and perhaps most of all, a smarter, cleaner, and more secure electricity grid. ARPA-E is supporting crucial research in several of these areas, and a variety of innovative new concepts, like Better Place's EV battery leasing model, are rapidly coming onto the scene in the United States and around the globe.

36 MATERIALS SCIENCE↗

Appendix B: Commercial Solar Financing Options

As the solar photovoltaic (PV) market in the United States has evolved, so too have the financing mechanisms associated with it. This appendix provides a snapshot of the current commercial solar financing arena and an overview of existing financing mechanisms. While there is significant overlap in solar financing options among the residential, government, and commercial sectors, this report focuses on options and considerations for commercial entities only. Traditional solar financing models are being adapted to encompass increasingly complex relationships between solar energy consumers and solar development. This guide explores the variety of financing options available to commercial entities, ranging from the historical mainstays of the solar financing spectrum - third-party ownership (TPO) models, which include power purchase agreements (PPAs) and leases, in addition to loans and cash purchases - to relatively more recent additions, including property-assessed clean energy (PACE) financing, performance contracting, and green bonds, among others. This appendix ('Appendix B. Commercial Solar Financing Options') is one chapter in the Environmental Protection Agency's broader Guide to Purchasing Green Power, which provides a detailed overview of green power markets and procurement.

14 SOLAR ENERGY↗

Distributed Wind Deployment: Rural Cooperative

This is a case study about a distributed wind project. Located on a 60-foot hill that was created during past coal mining operations, the “Gob Nob” wind turbine sits high above the fields that surround the project. The additional height allows the wind turbine to access a stronger wind resource than the lower elevations nearby. The land is owned by the Illinois Department of Natural Resources and is leased to the Rural Electric Convenience Cooperative (RECC). The project is connected to the Farmersville substation about half a mile away. All of the turbine’s electricity is fed into the Farmersville substation, and then distributed to about 380 RECC members’ homes and farms in the surrounding area.

case study↗

Geothermal Exploration of Mount Baker Hot Springs Through Ground-Based Magnetic and Gravity Surveys

The Washington State Division of Geology and Earth Resources (WDGER), together with the USGS, Altarock Energy Inc., Colorado College, Temple University, Innovate Geothermal Ltd., University of British Columbia, and Western Washington University(WWU), conducted phase two of a geothermal play fairway exploration at three plays (Mount Baker, Mount St. Helens seismic zone, and Wind River valley) along the Washington Cascade Range. The Mount Baker (MB) play is an ideal location for further investigation as a potential geothermal resource due to the presence of thermal features, young volcanic centers, existing geothermal leases, accessibility, and its proximity to existing transmission lines at the Baker Lake Dam. The goal of phase II exploration at all three plays is to collect geologic and geophysical data to help constrain spatial changes in subsurface lithology and structures that may be associated with the geothermal systems. Furthermore, this paper discusses the geothermal potential of the southeast flank of Mount Baker, WA by interpreting newly collected ground-based gravity and magnetic data. The Mount Baker play was surveyed from July-September, 2016 by the USGS, WDGER, and WWU. Results of a detailed magnetic and gravity surveys of the region surrounding the Baker hot springs, the primary surface expression of the hydrothermal system, are presented here. Gravity data were collected at 495 stations in the study area amounting to an area of roughly 150 square km. Approximately 93 km of line magnetometer data were collected within the study area, over a dozen magnetic susceptibility measurements were taken at 50 locations and about 50 hand samples were collected for density measurements. Preliminary data and modeling suggest pronounced magnetic anomalies trending NE/SW, generally in line with previously mapped lineaments identified in LiDAR. We present a series of preliminary two-dimensional forward models of the gravity and magnetic data as well as a 3D inversion model of magnetic susceptibility and interpret these models in terms of the structural controls influencing the Baker hot springs and hydrothermal system.

Geophysics↗

Community Solar

Community solar, also known as shared solar or solar gardens, is a distributed solar energy deployment model that allows customers to buy or lease part of a larger, offsite shared solar photovoltaic (PV) system and receive benefits of their participation.

achetypes of ownership↗

Summary Analysis of Different Offshore Wind Capacity Density Drivers in Proposed U.S. Projects and Impacts on Progress Towards State and Federal Deployment Targets

Understanding the density of offshore wind development - or the "capacity density" - is important for state and federal offshore wind planning efforts and to track progress towards policy goals. NREL has traditionally assumed a capacity density of 3 megawatts per square kilometer (MW/km2) when estimating the U.S. project pipeline (Musial et al. 2022), but capacity densities for existing European offshore wind farms ranged from 2-19 MW/km2 (Borrmann et al. 2018). We track the expected capacity densities of the proposed U.S. projects in the East Coast and make an analysis by state and by developer to identify what are the capacity density norms in the industry and whether the state in which the development efforts are taking place has some impact on capacity density. We also analyze the effects of the area occupied by station keeping systems on capacity density for lease areas dedicated to floating projects and provide a list of main capacity density drivers. This summary analysis sets a baseline to study how different capacity density drivers could impact the progress towards state and federal deployment targets. Given the currently delineated Renewable Energy Areas in the Outer Continental Shelf (OCS) and the basis from the summary analysis, we estimate the expected offshore wind deployment over time federally and by state and compare it to the state and federal deployment targets. The proposed analysis helps identify gaps and needs to meet state and federal targets, which provides sufficient information to propose strategic supply chain and policy planning with the objective of meeting deployment goals.

capacity density↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)