At least 343 records · Page 19

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

1MV Febetron Pulse Generator Operator's Manual

The Febetron Pulse Generator (FPG) is an experimental assembly used to store electrical energy for a period of time and then release that energy over a short duration pulse to achieve high instantaneous power outputs. The FPG is an ideal device to be used for a variety high energy physics experiments. For mobility and ease of repeatable operation, the FPG is secured on a rolling test fixture and paired with a diagnostic and controls rack. The combination of the FPG, test fixture cart, SF6 gas cart, and controls rack is identified as the Pulse Generator Testing Assembly (PGTA). This document outlines all necessary information regarding the working principles, assembly/disassembly, maintenance, operation, uses, hazards, and experimental procedures of the 1 Mega Volt (MV) PGTA. This document, in addition to the manufacturer’s manuals, should be utilized as a reference whenever working with the PGTA and any of its components.

42 ENGINEERING↗

Design of infrared astronomical satellite /IRAS/ primary mirror mounts

The design of an operational mount to rigidly secure the primary mirror to its baseplate without the introduction of figure error always proves to be a major task on diffraction limited optical systems. A summary of the design of the Infrared Astronomical Satellite (IRAS) primary mirror mount is given. The mirror was designed to be alligned and tested at room temperature and operated in a zero 'g' field at temperatures of 2K. To minimize overstressing, a stiffness requirement of greater than 150 Hz was required for cold launch and room temperature vibration acceptance testing. Additional isolation was required to minimize strains, introduced via the mounting base, due to thermal and mechanical distortions.

Schreibman, M.↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

Chapter Nine - Automated Optimal Control in Energy Systems: The Reinforcement Learning Approach

With the development of smart grid technologies an increasing number of new devices and participants have joined modern energy systems and are inevitably making them more complicated and interdependent than ever. Optimally controlling such a complex energy system and maintaining its operation in a high-efficient, secure, and resilient manner are challenging tasks to the system operators. Fortunately, the revolution in deep learning and artificial intelligence (AI), both from hardware and algorithms perspectives, has provided new ideas and solutions to many previously intractable problems. As a result, this advance in computer science also sparked great research interests in utilizing AI in solving engineering problems related to the modern energy systems. Among many AI techniques, deep reinforcement learning (DRL) has demonstrated great potential for solving sequential optimization problems, which are very common in the engineering domains. Its ability to handle nonlinearity and stochasticity in controlled systems has out-competed many traditional optimal control algorithms. Therefore in this chapter, we focus on the state-of-the-art of DRL concepts and related algorithms, compare their pros and cons with traditional optimal control approaches and discuss the typical workflow for leveraging RL in solving complex problems in modern energy systems.

artificial intelligence↗

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation↗

Driving Economics and Reducing Risks: The Business Case for Security-by-Design in Nuclear Power

This report provides an analysis of the financial, operational, and strategic advantages of incorporating Security-by-Design (SeBD) early in the lifecycle of nuclear power plant projects. By framing security as a foundational design element rather than a late-stage add-on, owners, vendors, and operators can reduce budget overruns, strengthen regulatory compliance, and increase revenue opportunities. The report details key lifecycle phases, highlighting the strategic imperative for organizations (including project developers, investors, vendors, and regulators) to adopt SeBD. Drawing on industry estimates, real-world case studies, and comparative cost analyses, the findings underscore that even a modest upfront investment in SeBD can yield substantial long-term returns by preventing costly retrofit activities, minimizing regulatory delays, and positioning nuclear vendors for the ability to adapt in the evolving security market. By avoiding excessive retrofit expenses and positioning security as a built-in feature rather than an afterthought, nuclear projects can protect their financial performance, enhance public trust, and secure a competitive edge in an increasingly complex global energy market. The authors advocate for SeBD’s strategic implementation, supported by established quality management methodologies, thereby promoting continuous improvement and defect avoidance. Ultimately, early SeBD integration represents a strategic investment, yielding significant returns by preventing costly retrofits and positioning nuclear projects for enhanced competitiveness and public trust.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cyber-Informed Engineering Guidance—Implementing CIE in Early Systems Engineering Lifecycle Stages

Traditionally, cybersecurity is not considered in the design process. Design engineers typically focus on building safety and reliability into their products and applications. Security against malicious cyber incidents is often an afterthought, resulting in deployment of security solutions during installation or operation. Unfortunately, waiting to consider cybersecurity until later in the systems engineering lifecycle often results in less effective and more expense security. Idaho National Laboratory (INL) developed the concept of Cyber-Informed Engineering (CIE) in 2015 to provide a framework that enables cybersecurity to be built into systems beginning at the conceptual design stage. In addition to ongoing research by INL, the U.S. Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response has recently developed a National CIE Strategy document for incorporating CIE into the design and operation of infrastructure systems reliant on digital monitoring or controls. This paper provides a brief review of this National CIE Strategy as well as a roadmap to historical, current, and future CIE research by INL through the U.S. DOE Office of Nuclear Energy (NE) Cybersecurity Crosscutting Technology Development Program. A near-term focus of the DOE-NE’s research and development is to extend the foundational CIE work into detailed guidance for implementation during initial systems engineering stages in nuclear digital instrumentation and control projects and to demonstrate use of the guidance in an integrated energy systems project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Cyber Security for the Spaceport Command and Control System: Vulnerability Management and Compliance Analysis

With the rapid development of the Internet, the number of malicious threats to organizations is continually increasing. In June of 2015, the United States Office of Personnel Management (OPM) had a data breach resulting in the compromise of millions of government employee records. The National Aeronautics and Space Administration (NASA) is not exempt from these attacks. Cyber security is becoming a critical facet to the discussion of moving forward with projects. The Spaceport Command and Control System (SCCS) project at the Kennedy Space Center (KSC) aims to develop the launch control system for the next generation launch vehicle in the coming decades. There are many ways to increase the security of the network it uses, from vulnerability management to ensuring operating system images are compliant with securely configured baselines recommended by the United States Government.

Cyber Security↗

Study on Conduction Cooling of Superconducting Magnets for the ILC Main Linac

In the main linac of the International Linear Collider (ILC), superconducting magnets for beam focusing and steering will be located periodically in superconducting RF (SRF) cavity string for beam acceleration in common cryomodules. A concept of conduction cooling of the combined-functioned, splittable superconducting magnets has been proposed and investigated to adapt much different features and to meet different requirements for the superconducting magnet and SRF cavity in fabrication, assembly, and operation. It is required to integrate the superconducting magnet after the SRF cavity string assembly which completed under an ultra-clean environment. The magnet must be conductively cooled down through thermal links to a liquid helium supply pipe. According to this concept, a model magnet development was carried out in cooperation with Fermilab and KEK, and has been demonstrated in KEK superconducting RF test facility (STF). In addition, an important issue has been recently identified. High gradient SRF cavities naturally emit field emission electron flux from the inner surface, so-called dark current. It may pass through the subsequent SRF cavity string and penetrate into the superconducting magnets placed downstream. It may heat up the superconducting coils, and may cause a quench. Therefore, further study on reliable conduction cooling and to secure the superconducting magnet operation with a keeping sufficient safety margin is quite essential. In this paper, we report the installation, the improvement achieved in STF, and the R&D progress in the study on the conduction cooling of the superconducting magnet for the ILC main linac.

43 PARTICLE ACCELERATORS↗

PUF-Based Two-Factor Authentication Protocol for Securing the Power Grid Against Insider Threat

Recent advances in smart grid technologies have enabled additional distributed control paradigms that allow more efficient and reliable operation. However, this creates new security concerns for the grid, such as attackers using spoofed grid control devices to generate false measurements. This paper introduces a two-factor authentication protocol leveraging standard public-key cryptography as one authentication factor and a hardware-based fingerprint, known as a Physical Unclonable Function, as a second authentication factor. This protocol incurs a small overhead and prevents cyber-attacks even when an adversary is able to compromise the cryptographic keys stored in the non-volatile memory of an intelligent control device.

42 ENGINEERING↗

Ethernet for Space Flight Applications

NASA's Goddard Space Flight Center (GSFC) is adapting current data networking technologies to fly on future spaceflight missions. The benefits of using commercially based networking standards and protocols have been widely discussed and are expected to include reduction in overall mission cost, shortened integration and test (I&T) schedules, increased operations flexibility, and hardware and software upgradeability/scalability with developments ongoing in the commercial world. The networking effort is a comprehensive one encompassing missions ranging from small University Explorer (UNEX) class spacecraft to large observatories such as the Next Generation Space Telescope (NGST). Mission aspects such as flight hardware and software, ground station hardware and software, operations, RF communications, and security (physical and electronic) are all being addressed to ensure a complete end-to-end system solution. One of the current networking development efforts at GSFC is the SpaceLAN (Spacecraft Local Area Network) project, development of a space-qualifiable Ethernet network. To this end we have purchased an IEEE 802.3-compatible 10/100/1000 Media Access Control (MAC) layer Intellectual Property (IP) core and are designing a network node interface (NNI) and associated network components such as a switch. These systems will ultimately allow the replacement of the typical MIL-STD-1553/1773 and custom interfaces that inhabit most spacecraft. In this paper we will describe our current Ethernet NNI development along with a novel new space qualified physical layer that will be used in place of the standard interfaces. We will outline our plans for development of space qualified network components that will allow future spacecraft to operate in significant radiation environments while using a single onboard network for reliable commanding and data transfer. There will be a brief discussion of some issues surrounding system implications of a flight Ethernet. Finally, we will show an onboard network architecture for a proposed new mission using Ethernet for science data transport.

Webb, Evan↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LLNL Kimberlina 1.2 NUFT Simulations June 2018 (v2)

This dataset contains the output 6,000, 3-dimensional reactive multi-phase flow and transport aquifer simulations of brine and CO2 leakage into a protective aquiver in California’s San Joaquin Valley and input data files detailing the geologic mesh, aquifer physical properties and CO2 and brine injection rates. This data set was generated as an ongoing effort with the US DOE National Risk Assessment Partnership (NRAP) to evaluate the effectiveness of monitoring techniques to detect brine and CO2 leakage from legacy wells into underground sources of drinking water overlaying a CO2 storage reservoir. Each simulation contains a unique set of input parameters, generated stochastically. The outputs consist of these upper three geologic layers (from top): the Etchegoin, Macoma-Chanac, Santa Margarita-McLure formations. These simulations span the several distances (1, 3 and 6 km or wells W31-0.2, W31-0.5 and W31-1.0, respectively) from the CO2 injector, initiated from bottom hole pressure and saturation to calculate wellbore leakage from the storage reservoir, with low and high regional groundwater gradients and wellbore leakage into 5 leaky nodes. The dataset includes 1,000 unique simulations for each distance, which each contain a unique aquifer heterogeneity, aquifer and caprock permeability, and two model generations are included with a high permeability (prod07) and hybrid permeability (prod09). The range of permeability distributions is listed in Table 1. Each model generation consists of 3,000 simulations. Included in the dataset are the leakage rates determined from 2D wellbore models which utilize the pressure and CO2 saturation from LBL's reservoir simulations, NUFT mesh files with distributed lithology, NUFT rocktab files which describe the material properties for the geologic layers and the NUFT input files and post-processed output 'ntab' files. Each ntab file contains spatial (rows) and temporal (columns) model output tables for each model cell, the locations (x,y,z) and dimensions for each cells (dx, dy, dz). Table 1. Permeability distribution ranges for prod07 and prod09 model generations Geologic Layer: Permeability Range (log10 m^2) prod07 prod09 Etchegoin -12.92 to -10.92 -13.70 to -11.44 Macoma-Chanac -12.72 to -10.72 -13.50 to -11.24 Santa Margarita-McLure -12.70 to -10.70 -13.48 to -11.22 The input files used to generate the model include which are included in the dataset are: Time series of CO2 leakage input into the model (ex: Q_brn.W31-0.2.sim1000.layers123.tab) Time series of CO2 leakage input into the model (ex: Q_CO2.W31-0.2.sim1000.layers123.tab) Physical properties of the aquifer materials detailing the aquifer porosity, solid density, partitioning coefficients, permeabilities and van-Genuchten parameters detailed in a NUFT rocktab file: (ex: sim1000.usnt.rocktab) Numerical mesh and geologic data assigned to each model cell detailed in a NUFT genmsh format (ex: sim1000.mesh_k16.prod07.trans.genmsh) The primary output parameters are: pH (use absolute value) Change in TDS (mg/kg) Change in Pressure (Pa) Change CO2 gas saturation (fraction range 0.0-1.0) for example, the directory /p/lscratchh/mansoor1/nrap/kimberlina/prod09/mainfiles/sim1000/W31- 0.2 contains: sim1000.W31-0.2.trans.pH.red.ntab sim1000.W31-0.2.no_bg.trans.TDS.red.ntab sim1000.W31-0.2.usnt.P.deltabg.red.ntab sim1000.W31-0.2.usnt.CO2_sat.deltabg.red.ntab Each row in the NTAB files consist of model output per numerical grid cell. Each output file contains 33 columns (variables), including the information of numerical records, geologic location and sizes and the simulated parameter values over time. The first 13 variables are about numerical records and relative geologic information for a simulation grid: 1. index: simulation index 2. i: the ith grid of x-axis 3. j: the ith grid of y-axis 4. k: the ith grid of z-axis 5. element_ref: element reference 6. nuft_ind: nuft index 7. x: grid location in the x axis direction 8. y: grid location in the y axis direction 9. z: grid location in the z axis direction 10. dx: grid length in the x axis direction 11. dy: grid length in the y axis direction 12. dz: grid length in the z axis direction 13. volume: volume of the simulation grid The remainder (14, 15, 16...) variables are the simulated parameter values over time, take Pressure as an example, are: 14. 0.0y: initial pressure per cell. 15. 10.0y: simulated pressure at the end of the 10th year. 16. 20.0y: simulated pressure at the end of the 20th year. ... (repeated for every 10 years until 200 years)... The model extends 10,000 m, 5,000 m and 1,411 m in the x,y and z dimensions, respectively. The mesh consists of 164,832 cells with mesh dimensions of 101 x 51 x 32 (nx, ny, nz), with cell dimensions ranging from 100 m laterally (along x and y-axis) and model layers are as designated in the z-axis: Layer 1: atmosphere (1e-30 m thick) Layer 2: upper caprock (10 m thick) Layers 3-13: Etchegoin (536.23 m thck) Layers 14-27: Macoma-Chanac (679.04 m thick) Layers 28-32: Santa Margarita-McLure (185.94 m thick) The wellbore is placed along node i=51, j=26, and extends vertically along 5 nodes from the top to the bottom of the model. Special instructions when extracting files: Each Gzip archive (ex: prod07.sim1000-sim00099.tar.gz) contains 100 simulations. Gzip archives should be transferred into base directories (ie. In Linux: mkdir prod07; mv prod07.*.tar.gz prod07/.) before extracting, or files will be overwritten. Each sub-simulation tree should have the following file structure pattern (using the linux 'tree' command): |-- prod07 | |-- sim0001 | |-- W31-0.2 | | |-- Q_brn.W31-0.2.sim0001.layers123.tab | | |-- Q_co2.W31-0.2.sim0001.layers123.tab | | |-- sim0001.W31-0.2.no_bg.trans.TDS.red.ntab | | |-- sim0001.W31-0.2.trans.pH.red.ntab | | |-- sim0001.W31-0.2.usnt.CO2_sat.deltabg.red.ntab | | |-- sim0001.W31-0.2.usnt.P.deltabg.red.ntab | |-- W31-0.5 | | |-- Q_brn.W31-0.5.sim0001.layers123.tab | | |-- Q_co2.W31-0.5.sim0001.layers123.tab | | |-- sim0001.W31-0.5.no_bg.trans.TDS.red.ntab | | |-- sim0001.W31-0.5.trans.pH.red.ntab | | |-- sim0001.W31-0.5.usnt.CO2_sat.deltabg.red.ntab | | |-- sim0001.W31-0.5.usnt.P.deltabg.red.ntab | |-- W31-1.0 | | |-- Q_brn.W31-1.0.sim0001.layers123.tab | | |-- Q_co2.W31-1.0.sim0001.layers123.tab | | |-- sim0001.W31-1.0.no_bg.trans.TDS.red.ntab | | |-- sim0001.W31-1.0.trans.pH.red.ntab | | |-- sim0001.W31-1.0.usnt.CO2_sat.deltabg.red.ntab | | |-- sim0001.W31-1.0.usnt.P.deltabg.red.ntab | |-- sim0001.mesh_k16.prod07.trans.genmsh Disclaimer This document was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor Lawrence Livermore National Security, LLC, nor any of their employees makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or Lawrence Livermore National Security, LLC. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or Lawrence Livermore National Security, LLC, and shall not be used for advertising or product endorsement purposes. Lawrence Livermore National Laboratory is operated by Lawrence Livermore National Security, LLC, for the U.S. Department of Energy, National Nuclear Security Administration under Contract DE-AC52-07NA27344. This report was reviewed and released as LLNL-MI-753464.

aquifer↗

Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).

Martin, Keith↗