Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Onboard planning for geological investigations using a rover team

This paper describes an integrated system for coordinating multiple rover behavior with the overall goal of collecting planetary surface data. The Multi-Rover Integrated Science Understanding System (MISUS) combines techniques from planning and scheduling with machine learning to perform autonomous scientific exploration with cooperating rovers.

scheduling↗

Demand Assignment in the ACTS LBR System

On the Advanced Communications Technology Satellite (ACTS) being developed at NASA Lewis, low-burst-rate (LBR) traffic stations will access the ACTS multibeam package via two hopping beams that can be directed at certain areas in the continental U.S. An onboard baseband processor (BBP) demodulates uplink traffic, switches it between uplink and downlink beams at baseband, and then remodulates it for retransmission at 20 GHz. This study describes the demand-assigned operation of the ACTS LBR system, where the onboard switch is remote from both traffic stations and master control station (MCS). Network control uses inbound and outbound orderwire channels and a BBP control channel, allowing the MCS to coordinate assignment of individual 64-kb/s spacecraft channels. Models are developed to simulate the dynamics of the assignment process and verify the call blocking behavior, to predict control channel loads, and to evaluate algorithms for burst time plan rearrangement.

White, Lawrence W.↗

Transitioning NASA Space Operations to Commercial Services

Major considerations associated with "Transitioning NASA Space Operations to Commercial Services" are presented in viewgraph form. Specific topics include: 1) Government use of commercial frequencies vs. commercial use of commercial frequencies for government use; 2) Commercial use of government frequencies; 3) Government vs commercial: Access techniques, data formats, and modulation and coding; 4) Government need for multiple sources: backup and competition; 5) Government in perceived competition with commercial service providers if TDRSS is used for commercial purposes; and 6) Coordination required among plans for CSOC, NSCP, and satellite industry.

Gilbert, Charlene E.↗

Toward the Development of an Integrated Global Observing Strategy

In the current environment of stagnant or shrinking budgets for space research and exploration, nations can no longer afford to develop costly systems in a vacuum. Greater coordination of existing and planned systems, both among space agencies and between the space agencies and user communities, will enable the maximization of global investments in all areas of space-related research. In this manner, a group of space agencies has embarked on an initiative to link their activities in Earth observation with complementary observation programs. The goal of this initiative is to develop a comprehensive strategy for enhanced levels of support to scientific, operational and research communities. The space agencies, through the Committee on Earth Observation Satellites (CEOS), have embraced the concept of an Integrated Global Observing Strategy (IGOS), primarily in fulfillment of their own set of objectives and to derive greater benefit from both operating and planned Earth observing systems. Through working together, CEOS agencies are in a position to plan their Earth observation projects with the minimum of unnecessary overlap and to devise joint strategies for addressing serious gaps in their observation capabilities. Ultimately, an IGOS should be the joint product of all groups involved in the collection and analysis of both space-based and in-situ data. CEOS is actively seeking IGOS -related partnerships with the Global Climate, Global Ocean and Global Terrestrial Observing Systems, their intergovernmental Sponsors, the International Group of Funding Agencies for Global Change Research, and other scientific and user organizations including the International Geosphere-Biosphere Programme and the World Climate Research Programme.

Charles, Leslie Bermann↗

Computer Human Interface Challenges in Space Exploration

NASA’s plans to return humans to the Lunar surface require overcoming a variety of challenging technical and operational obstacles. In 2022, NASA formed the Extravehicular Activity (EVA) and Human Surface Mobility (HSM) Program (EHP) at the Johnson Space Center with responsibilities including development of space suits and surface mobility systems for Lunar missions. This program includes a Technology Development and Partnerships office chartered to identify high priority gaps in capabilities for Lunar surface mobility and to coordinate resources to close those gaps. This presentation details the EHP technology roadmap for “Informatics and Decision Support,” a subset of spacecraft avionics focused on effective and autonomous crew interaction with spaceflight systems. The gaps, grouped into displays, audio systems, and information technology infrastructure, are largely driven by the unique interaction requirements for human spacecraft and the severe radiation environments beyond low earth orbit. The roadmap identifies ongoing activities and paths to technology infusion into Lunar spacecraft. NASA is seeking input on the content and ideas for alternative paths to gap closure. Closing these gaps is important to successful human operations on the Lunar surface and vital to NASA’s long-term goal of human missions to Mars.

Spacecraft Displays↗

STS-61 mission director's post-mission report

To ensure the success of the complex Hubble Space Telescope servicing mission, STS-61, NASA established a number of independent review groups to assess management, design, planning, and preparation for the mission. One of the resulting recommendations for mission success was that an overall Mission Director be appointed to coordinate management activities of the Space Shuttle and Hubble programs and to consolidate results of the team reviews and expedite responses to recommendations. This report presents pre-mission events important to the experience base of mission management, with related Mission Director's recommendations following the event(s) to which they apply. All Mission Director's recommendations are presented collectively in an appendix. Other appendixes contain recommendations from the various review groups, including Payload Officers, the JSC Extravehicular Activity (EVA) Section, JSC EVA Management Office, JSC Crew and Thermal Systems Division, and the STS-61 crew itself. This report also lists mission events in chronological order and includes as an appendix a post-mission summary by the lead Payload Deployment and Retrieval System Officer. Recommendations range from those pertaining to specific component use or operating techniques to those for improved management, review, planning, and safety procedures.

Newman, Ronald L.↗

Field Evaluations Test Plan for Validation of Alternative Low-Emission Surface Preparation/Depainting Technologies for Structural Steel

Headquarters National Aeronautics and Space Administration (NASA) chartered the Acquisition Pollution Prevention (AP2) Office to coordinate agency activities affecting pollution prevention issues identified during system and component acquisition and sustainment processes. The primary objectives of the AP2 Office are to: (1) Reduce or eliminate the use of hazardous materials (HazMats) or hazardous processes at manufacturing, remanufacturing, and sustainment locations. (2) Avoid duplication of effort in actions required to reduce or eliminate HazMats through joint center cooperation and technology sharing. To achieve a substrate condition suitable for the application of a coating system, both new and old (in-situ) substrates must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The level of cleanliness or anchor profile desired is typically a function of the type of coating to be applied and the specification being adhered to. In high performance environments, cleanliness and surface profile requirements for carbon steel (the dominant substrate for facilities, structures and equipment) dictates the use of abrasive media. Many of the abrasive media currently used across NASA and Air Force Space Command (AFSPC) installations generate large quantities of fugitive particulate emissions and waste. The high quantities of airborne dust and waste generated from these operations pose significant environmental concern. Efforts to contain emissions and the reduce quantity of waste generated have significant implications on project cost; this is often a deterrent to engaging in maintenance activities. In response to recent technological developments and NASA's and AFSPC's need to undertake environmentally conscious corrosion prevention projects, a review of the industry needs to be undertaken to evaluate surface preparation technologies (materials and processes) for embrace. This project will identify, evaluate and approve alternative surface preparation technologies for use at NASA and AFSPC installations. Materials and processes will be evaluated with the goal of selecting those processes that will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination and reduce the amount of hazardous waste generated. This Field Evaluations Test Plan defines the field evaluation and testing requirements for validating alternative surface preparation/depainting technologies and supplements the JTP. The field evaluations will be performed at Stennis Space Center, Mississippi, under the oversight of the Project Engineer. Additional field evaluations may be performed at other NASA centers or AFSPC facilities.

Lewis, Pattie↗

First down and goal to go

A 10 year game plan for transition to the operational system was developed in the State of Washington. The plan is to: examine the results of past demonstration projects to identify successful operational applications, take advantage of geographic information systems, and work toward reducing/eliminating constraints of the present system which inhibit operational use. Support for the LANDSAT program was demonstrated by sending a user representative to NOAA working in the development of a user oriented system. It is suggested that the state should reassess its position, by taking advantage of the past 8 years' experience, and coordinate efforts to enhance LANDSAT' advantages in a cost effective manner.

Little, G.↗

Testing Enabling Technologies for Safe UAS Urban Operations

A set of more than 100 flight operations were conducted at NASA Langley Research Center using small UAS (sUAS) to demonstrate, test, and evaluate a set of technologies and an overarching air-ground system concept aimed at enabling safety. The research vehicle was tracked continuously during nominal traversal of planned flight paths while autonomously operating over moderately populated land. For selected flights, off-nominal risks were introduced, including vehicle-to-vehicle (V2V) encounters. Three contingency maneuvers were demonstrated that provide safe responses. These maneuvers made use of an integrated air/ground platform and two on-board autonomous capabilities. Flight data was monitored and recorded with multiple ground systems and was forwarded in real time to a UAS traffic management (UTM) server for airspace coordination and supervision.

Moore, Andrew J.↗

Future SAR Imaging Systems: Goals, Plans, Challenges and Opportunities

Synthetic Aperture Radar (SAR) Earth observation data are becoming increasingly ubiquitous as new spaceborne systems become operational and their data are made available to scientists and applications users. The characteristic of active sensors like SAR to be able to observe Earth independent of weather or solar illumination, coupled with regular data acquisition, fosters reliability and encourages the investment in algorithm and product development toward a beneficial result. As SAR systems typically contain proprietary or nationally important technologies, civilian SAR systems are typically developed with a national focus, or in the case of the European Union, with the Union’s focus. As a result, when viewed from a global perspective, SAR programs can be generally viewed as independent developments, each with their own requirements, schedules, development approaches, and data policies. At the same time, these systems can be expensive, and particularly in an era of increasingly open data policies, coordination of programs could reduce redundancy in observations, increase sampling density and measurement diversity, and improve dependability of data streams in the long term. Since 2018, agency representatives from NASA, ESA, DLR, JAXA, ISRO, ASI, and CONAE have been evaluating the possibilities for programmatic and technical coordination of future SAR systems, data sharing, and scientific exploitation. In this paper, we describe the work in discovering trends and possibilities associated with flight systems, by evaluating current and future plans for SAR systems around the world, and identifying opportunities for coordination.

Zink, Manfred↗

A Review of the Generic Grid-Forming Model Used by the System Operator in Chile

The objective in this project is to verify the applicability of using generic electro-magnetic transient domain models of GFM technology through a wide range of tests and system conditions proposed by subject matter experts of GFM technology through a wide range of tests and system conditions proposed by subject matter experts. For this study, we used the generic GFM electro-magnetic transient model available in the EMTP (Electromagnetic Transient Program) software library, and we assessed the model’s various GFM capabilities through 12 tests. In this report, we compare the performance of the model with that of an original equipment manufacturer (OEM) GFM model. We also share the key insights and lessons learned from this work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration and Test of Shuttle Small Payloads

Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Human Factors Research Considerations for Terminal Area Urban Air Mobility Operations

In this presentation, we discuss the human factors research challenges from introducing greater levels of automation in a future air transportation concept called Urban Air Mobility (UAM). UAM is an air transportation concept that aims to provide air transportation services to the daily commuter, as well as emergency response and package delivery. The principal innovation over current day large air transport system is the greater distribution of important safety functions to automated and human agents; these functions include air traffic management, traditionally an air traffic controller responsibility. A central aspect of UAM is the development of an automated air traffic manager, whose primary responsibility is to approve airspace access for vehicle operators. Vehicle operator roles may include onboard and remote pilots, as well as a human manager who will supervise an entire fleet. Alternatively, both fleet manager and vehicle operators can be merged into a single role – a feasible option if UAM aircraft are autonomous. In lieu of tower controllers, vertiport managers, with the assistance of automation, will manage arrival and departure schedules between vertiports, as well as supervise surface operations. Our approach here will be to introduce use cases currently being developed by NASA, and then provide preliminary definitions for each of the roles introduced above and how coordination between them can be configured to support the operations within the use cases described. Subsequently, we review the tools and interfaces being developed to support the various roles. To conclude, we present current human factors work related to defining the roles above and suggest future work to advance the UAM concept.

trial planning↗

Integration and Test for Small Shuttle Payloads

Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

Wright, Michael R.↗

Design of a SMART Valve Testbed for Nuclear Thermal Dispatch

By the year 2050, the United States aims to achieve net-zero carbon emissions. To achieve this target, the licensing of the Light Water Reactor (LWR) fleet has been extended for 20 more years. To stay economically competitive with other power sources such as renewable and fossil-fuel power plants, the U.S. Department of Energy has introduced a plan to modernize the existing LWR fleet and diversify the revenue stream. One of the plans is to dispatch thermal energy to endothermic industrial processes. SMART valves will play an important role in this initiative by efficiently balancing the load by regulating valves in a coordinated manner while monitoring the thermal-hydraulic systems to enhance safety and maintain the integrity of the power plant. This research aims to develop a facility to test the coordinated control algorithm and produce various test results for training the monitoring system. The constructed facility is capable of simulating various operational and accidental scenarios by coordinating all the valves (positions) and pump (flowrate). The facility is developed with an Internet of Things (IoT)-based custom system and a python-based valve position control and coordination mechanism. It has achieved stable sensor outputs, pump control, and coordinated valve regulation in all three valves with minimum obstruction in the system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA's UAS [Unmanned Aircraft Systems] Related Activities

NASA continues to operate all sizes of UAS in all classes of airspace both domestically and internationally. Missions range from highly complex operations in coordination with piloted aircraft, ground, and space systems in support of science objectives to single aircraft operations in support of aeronautics research. One such example is a scaled commercial transport aircraft being used to study recovery techniques due to large upsets. NASA's efforts to support routine UAS operations continued on several fronts last year. At the national level in the United States (U.S.), NASA continued its support of the UAS Executive Committee (ExCom) comprised of the Federal Aviation Administration (FAA), Department of Defense (DoD), Department of Homeland Security (DHS), and NASA. The committee was formed in recognition of the need of UAS operated by these agencies to access to the National Airspace System (NAS) to support operational, training, development and research requirements. Recommendations were received on how to operate both manned and unmanned aircraft in class D airspace and plans are being developed to validate and implement those recommendations. In addition the UAS ExCom has begun developing recommendations for how to achieve routine operations in remote areas as well as for small UAS operations in class G airspace. As well as supporting the UAS ExCom, NASA is a participant in the recently formed Aviation Rule Making Committee for UAS. This committee, established by the FAA, is intended to propose regulatory guidance which would enable routine civil UAS operations. As that effort matures NASA stands ready to supply the necessary technical expertise to help that committee achieve its objectives. By supporting both the UAS ExCom and UAS ARC, NASA is positioned to provide its technical expertise across the full spectrum of UAS airspace access related topic areas. The UAS NAS Access Project got underway this past year under the leadership of NASA s Aeronautics Research Mission Directorate. This project is focused on advancing the state of the art and providing research and analysis results in the areas of Separation Assurance, Communications (non-governmental spectrum allocation for UAS), Certification, and Human System Integration (ground control station design/pilot interfaces). The project is working in close coordination with the FAA and industry standards organizations (e.g. RTCA SC 203). More details on this project are provided in a separate article in this year's yearbook

Bauer, Jeffrey↗

Dynamic Path Planning Automation Concept for Advanced Air Mobility

Advanced Air Mobility (AAM) aims to develop an air transportation system for novel air vehicles between local, regional, intraregional, and urban places. Safety and efficiency of increasingly complex AAM operations are expected to require extensive use of automation, ranging from controlling the revolutionary new aircraft to managing flights dynamically in the high tempo airspace and aerodrome operations. Both onboard and ground automation will play central roles in assisting AAM operators with managing the flight paths of their fleet. This document presents a concept for dynamic path planning (DPP) automation applicable to AAM and other flight operations. The role of the DPP automation system is fivefold: (1) it creates a flight path with desired qualities of being feasible, deconflicted, harmonized, flexible, and optimal; (2) it monitors the progress of flight in a dynamic operating environment; (3) it supports the user in evaluating continued acceptability of the flight path in changing conditions; (4) it revises the flight path as needed to maintain the desired flight path qualities; and (5) it coordinates the flight path with airspace users and service providers. Key users of the DPP automation system include flight planners, pilots, and airspace service providers The concept allows for the system to be installed onboard the aircraft as well as on the ground. The system responds automatically to the dynamic operating environment to ensure that a safe and operationally acceptable flight path is available throughout the flight.

Vivek Sharma↗