Search NASA⌕ Search

SEARCH · Search NASA

Results for “PCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

INL High Level Language Microcontroller Implementa

The overall goal of this project is to improve the security of embedded devices (microcontrollers) used in monitoring and control of energy-sector infrastructure. As these devices are essentially scaled-down personal computers (PCs), they are vulnerable to common low-level cyber-attacks such as buffer overflows and insecure authentication. The implementation of a modern high-level programming language on these microcontrollers would disallow such low-level attacks as the languages would have inherent safeguards against these types of cyber exploits. Idaho National Laboratory (INL) has partnered with Siemens Corporate Research (SCR) to develop and test a 4 th -generation language DNP3 implementation on real-world embedded hardware. These tests were carried out on control-system device models currently deployed in real-world applications. Testing was performed with existing C-based DNP implementation as well as the Python version developed by INL.

4GL↗

PV output smoothing using a battery and natural gas engine-generator.

In some situations involving weak grids or high penetration scenarios, the variability of photovoltaic systems can affect the local electrical grid. In order to mitigate destabilizing effects of power fluctuations, an energy storage device or other controllable generation or load can be used. This paper describes the development of a controller for coordinated operation of a small gas engine-generator set (genset) and a battery for smoothing PV plant output. There are a number of benefits derived from using a traditional generation resource in combination with the battery; the variability of the photovoltaic system can be reduced to a specific level with a smaller battery and Power Conditioning System (PCS) and the lifetime of the battery can be extended. The controller was designed specifically for a PV/energy storage project (Prosperity) and a gas engine-generator (Mesa Del Sol) currently operating on the same feeder in Albuquerque, New Mexico. A number of smoothing simulations of the Prosperity PV were conducted using power data collected from the site. By adjusting the control parameters, tradeoffs between battery use and ramp rates could be tuned. A cost function was created to optimize the control in order to balance, in this example, the need to have low ramp rates with reducing battery size and operation. Simulations were performed for cases with only a genset or battery, and with and without coordinated control between the genset and battery, e.g., without the communication link between sites or during a communication failure. The degree of smoothing without coordinated control did not change significantly because the battery dominated the smoothing response. It is anticipated that this work will be followed by a field demonstration in the near future.

Johnson, Jay Dean↗

Gyrokinetic Particle Simulation of Turbulent Transport in Burning Plasmas

In this project, we have developed techniques for visualizing large-scale time-varying multivariate particle and field data produced by the GPS_TTBP team. Our basic approach to particle data visualization is to provide the user with an intuitive interactive interface for exploring the data. We have designed a multivariate filtering interface for scientists to effortlessly isolate those particles of interest for revealing structures in densely packed particles as well as the temporal behaviors of selected particles. With such a visualization system, scientists on the GPS-TTBP project can validate known relationships and temporal trends, and possibly gain new insights in their simulations. We have tested the system using over several millions of particles on a single PC. We will also need to address the scalability of the system to handle billions of particles using a cluster of PCs. To visualize the field data, we choose to use direct volume rendering. Because the data provided by PPPL is on a curvilinear mesh, several processing steps have to be taken. The mesh is curvilinear in nature, following the shape of a deformed torus. Additionally, in order to properly interpolate between the given slices we cannot use simple linear interpolation in Cartesian space but instead have to interpolate along the magnetic field lines given to us by the scientists. With these limitations, building a system that can provide an accurate visualization of the dataset is quite a challenge to overcome. In the end we use a combination of deformation methods such as deformation textures in order to fit a normal torus into their deformed torus, allowing us to store the data in toroidal coordinates in order to take advantage of modern GPUs to perform the interpolation along the field lines for us. The resulting new rendering capability produces visualizations at a quality and detail level previously not available to the scientists at the PPPL. In summary, in this project we have successfully created new capabilities for the scientists to visualize their 3D data at higher accuracy and quality, enhancing their ability to evaluate the simulations and understand the modeled phenomena.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of an Advanced Simulator to Model Mobility Control and Geomechanics during CO 2 Floods

The simulator is an isothermal, three-dimensional, four-phase, compositional, equation-of–state (EOS) simulator. We have named the simulator UTDOE-CO2 capable of simulating various recovery processes (i.e., primary, secondary waterflooding, and miscible and immiscible gas flooding). We include both the Peng-Robinson EOS and the Redlich-Kwong EOS models. A Gibbs stability test is also included in the model to perform a phase identification test to consistently label each phase for subsequent property calculations such as relative permeability, viscosity, density, interfacial tension, and capillary pressure. Our time step strategy is based on an IMPEC-type method (implicit pressure and explicit concentration). The gridblock pressure is solved first using the explicit dating of saturation-dependent terms. Subsequently, the material balance equations are solved explicitly for the total concentration of each component. The physical dispersion term is also included in the governing equations. The simulator includes (1) several foam model(s) for gas mobility control, (2) compositional relative permeability models with the hysteresis option, (3) corner point grid and several efficient solvers, (4) geomechanics module to compute stress field as the result of CO 2 injection/production, (5) the format of commercial visualization software, S3graf from Science-soft Ltd., was implemented for user friendly visualization of the simulation results. All tasks are completed and the simulator was fully tested and delivered to the DOE office including a user’s guide and several input files and the executable for Windows Pcs. We have published several SPE papers, presented several posters, and one MS thesis is completed (V. Pudugramam, 2013) resulting from this DOE funded project.

02 PETROLEUM↗

KJRR-FAI Hydraulic Flow Testing Input Package

The INL, in cooperation with the KAERI via Cooperative Research And Development Agreement (CRADA), undertook an effort in the latter half of calendar year 2013 to produce a conceptual design for the KJRR-FAI campaign. The outcomes of this effort are documented in further detail elsewhere [5]. The KJRR-FAI was designed to be cooled by the ATR’s Primary Coolant System (PCS) with no provision for in-pile measurement or control of the hydraulic conditions in the irradiation assembly. The irradiation assembly was designed to achieve the target hydraulic conditions via engineered hydraulic losses in a throttling orifice at the outlet of the irradiation vehicle.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ethanol Production from Biomass: Large Scale Facility Design Project

High solids processing of biomass slurries provides the following benefits: maximized product concentration in the fermentable sugar stream, reduced water usage, and reduced reactor size. However, high solids processing poses mixing and heat transfer problems above about 15% for pretreated corn stover solids due to their high viscosities. Also, highly viscous slurries require high power consumption in conventional stirred tanks since they must be run at high rotational speeds to maintain proper mixing. An 8 liter scraped surface bio-reactor (SSBR) is employed here that is designed to efficiently handle high solids loadings for enzymatic saccharification of pretreated corn stover (PCS) while maintaining power requirements on the order of low viscous liquids in conventional stirred tanks. Saccharification of biomass exhibit slow reaction rates and incomplete conversion, which may be attributed to enzyme deactivation and loss of activity due to a variety of mechanisms. Enzyme deactivation is classified into two categories here: one, deactivation due to enzyme-substrate interactions and two, deactivation due to all other factors that are grouped together and termed “non-specific” deactivation. A study was conducted to investigate the relative extents of “non-specific” deactivation and deactivation due to “enzyme-substrate interactions” and a model was developed that describes the kinetics of cellulose hydrolysis by considering the observed deactivation effects. Enzyme substrate interactions had a much more significant effect on overall deactivation with a deactivation rate constant about 20X higher than the non-specific deactivation rate constant (0.35 h -1 vs 0.018 h -1 ). The model is well validated by the experimental data and predicts complete conversion of cellulose within 30 hours in the absence of enzyme substrate interactions.

09 BIOMASS FUELS↗

SynTec Final Technical Report: Synthetic biology for Tailored Enzyme cocktails

Using a novel enzyme screening method inspired by synthetic biology, Novozymes developed new technology under SynTec which allows for more rapidly tailoring of enzyme cocktails. The methodology can be applied to specific feedstocks, and or coupled to address a specific hydrolytic conversion process context. Using combinatorial high throughput screening of libraries of enzyme domains, we can quickly assess which combination of catalytic modules delivers the best performance for a specific condition. To demonstrate the effectiveness of the screening process, we measured performance of the output catalytic cocktail compared to CTec3/HTec3. SynTec benchmark cocktail - blend of Cellic® CTec3 and HTec3. The test substrate was - ammonia fiber expansion pretreated corn stover (AFEX™ PCS).CTec3/HTec3 was assayed at the optimal pH and temperature, and also in the absence of any pH adjustment. The new enzyme cocktail discovered under SynTec was assayed in the absence of any pH adjustment and at the optimal temperature. Conversion is delivered by SynTec enzyme at significant dose reduction relative to CTec3/HTec3 at the controlled pH optimum, and without titrant required to maintain pH, which delivers additional cost savings relative to current state of the art process. In this 2.5 year $4M project, the team delivered an experimental cocktail that significantly outperformed CTec3/HTec3 for a specific substrate, and for specific hydrolysis conditions. As a means of comparing performance improvement delivered per research dollar spent, we note that SynTec delivered a similar performance improvement to the previous award, in a shorter time and with fewer resources than for the previously successful DOE project DECREASE, a 3.5 year, $25M project, though this project focused on a different substrate and used different hydrolysis conditions. The newly implemented technology for rapid sourcing of new cellulases and hemicellulases from nature is an example of Novozymes' continued innovation that results in more effective products for the advanced biofuel market.

09 BIOMASS FUELS↗

Pipe Overpack Container Fire Testing: Phase I & II

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a new series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016, and described herein, were done in two phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. This report will describe the various tests conducted in phase I and II, present preliminary results from these tests, and discuss implications for the POCs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How to Build MCNP 6.2

This presentation describes how to build MCNP 6.2. MCNP®* 6.2 can be compiled on Macs, PCs, and most Linux systems. It can also be built for parallel execution using both OpenMP and Messing Passing Interface (MPI) methods. MCNP6 requires Fortran, C, and C++ compilers to build the code.

97 MATHEMATICS AND COMPUTING↗

Pipe Overpack Container Fire Testing: Phase I II & III.

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016 were done in three phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. The goal of the third phase was to see if surrogate aerosol gets released from the PC when the drum lid is off. This report will describe the various tests conducted in phase I, II, and III, present preliminary results from these tests, and discuss implications for the POCs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pipe Overpack Container Fire Testing: Phase II-A

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible Transuranic (TRU) waste at Department of Energy (DOE) sites. At the request of DOE's Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), SNL started conducting a new series of fire tests in 2015 to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to overpressurize and release its inner content. In 2016, Phase II tests showed that POCs tested in a pool fire failed within 3 minutes of ignition with the POC lid ejecting. These POC lids were fitted with an all-metal (NUCFIL019DS) filter and revealed that this specific filter did not relieve sufficient pressure to prevent lid ejection. For the test phase discussed in this report, Phase II-A, the POCs are exposed to a 30-minute pool fire, with similar configurations to those tested in Phase II, except that the POC lids are fitted with a hybrid metal-polyethylene (UT9424S) filter instead. This report will: describe the various tests conducted in Phase II-A, present results from these tests, and discuss implications for the POCs based on the test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Transport Pipeline, Construction

Construction of a fuel transport pipeline, on the basis of pcs per kg of fuel transported over the plant lifetime. Includes steel pipe for pipeline; amount of pipe is variable based on length and diameter. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=090C92F3-7735-4669-95F9-ED97C2E43C72

42 ENGINEERING↗

Pipe Overpack Container Fire Testing: Phase II-A

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible Transuranic (TRU) waste at Department of Energy (DOE) sites. At the request of DOE's Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), SNL started conducting a new series of fire tests in 2015 to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to overpressurize and release its inner content. In 2016, Phase II tests showed that POCs tested in a pool fire failed within 3 minutes of ignition with the POC lid ejecting. These POC lids were fitted with an all-metal (NUCFIL019DS) filter and revealed that this specific filter did not relieve sufficient pressure to prevent lid ejection. For the test phase discussed in this report, Phase II-A, the POCs are exposed to a 30-minute pool fire, with similar configurations to those tested in Phase II, except that the POC lids are fitted with a hybrid metal-polyethylene (UT9424S) filter instead. This report will: describe the various tests conducted in Phase II-A, present results from these tests, and discuss implications for the POCs based on the test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational and Mission Highlights A Monthly Summary of Top Achievements

In September 2020, the Laboratory’s Chemical Microscopy Facility tripled in size, expanding to 1,000 square feet. Located at TA-46, Building158, this facility houses a unique Laboratory resource. Operated by the Physical Chemistry and Applied Spectroscopy (C-PCS) group, this facility was established to renew the Laboratory’s rich history in radiobiology. The facility combines biological research capabilities with isotope production, as well as radioanalytical and chemical infrastructure. This facility provides space for Biosafety Level 2 (BSL-2) research, with alpha-emitting and other radionuclides of interest associated with biological systems. Equipped with a Class ll/A2 biological safety cabinet, a radiological fume hood and a host of other analytical equipment, this facility serves an effective resource to evaluate the efficacy of targeted alpha therapeutics, as well as the deleterious effects of radiological materials on living organisms. The facility receives funding through LDRD- 20180005DR, “Establishing a Radiotherapeutic Capability to Counter Biothreats,” and the BES Heavy Element Chemistry Program at the Laboratory.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Pipe Overpack Container Fire Testing: Phase II-B

The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire. This test resulted in one of the POCs generating sufficient internal pressure to pop off its drum lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials that would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible Transuranic (TRU) waste at Department of Energy (DOE) sites. At the request of DOE's Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), SNL started conducting a new series of fire tests in 2015 to examine whether PCs with combustibles would reach a temperature that could result in: (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner contents. In 2016, Phase II of the tests showed that POCs tested in a pool fire failed within 3 minutes of ignition with the POC lid ejecting. These POC lids were fitted with a NUCFIL-019DS filter and revealed that this specific filter did not relieve sufficient pressure to prevent lid ejection. In the Fall of 2017, Phase II-A was conducted to expose POCs to a 30-minute pool fire with similar configurations to those tested in Phase II, except that the POC lids were fitted with an UltraTech (UT) 9424S filter instead. That specific filter was chosen because of its design to help relieve internal pressure during the fire and thus prevent lid ejection. In Phase II-A, however, setups of two POCs stacked upon one another were never tested, which led to this phase of tests, Phase II-B. This report will describe the various tests conducted in Phase II-B, present results from these tests, and implications for the POCs based on the test results will be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SoW for KDP Precision Cleaning System Control Sys Refurbishment

The KDP Optic Precision Cleaning System (PCS) is used is a standalone batch-process system used to clean Potassium di-Hydrogen Phosphate (KDP) optics required for the National Ignition Facility (NIF). There are two nearly identical machines owned by the US government, as provided by Lawrence Livermore National Security (LLNS). One machine is located at Lawrence Livermore National Laboratory in Livermore, CA in a Class 100 cleanroom and the other is located at the Gooch & Housego (G&H) facility in Highland Heights, OH in a Class 1,000 cleanroom.

42 ENGINEERING↗

Machine Learning for Real-time Fusion Plasma Behavior Prediction and Manipulation

This project set out with an ambitious goal: to develop and apply machine learning-based methods of discovering new controllers and operating regimes for achieving better performing plasmas in tokamaks. As summarized in the dozens of papers below, the project was a huge success. It developed several machine learning components and integrated them into a single ML system that was added to the DIII-D PCS. That functionality was demonstrated over a series of experiments on DIII-D. A summary of these results is given here with the details in the published papers below.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗