Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRESS UPDATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

SFWST Disposal Research R&D 5-Year Plan (FY2023 Update)

This FY2023 report is the second update to the Disposal Research (DR) Research and Development (R&D) 5-year plan for the Spent Fuel and Waste Science and Technology (SFWST) Campaign DR R&D activities. In the planning for FY2020 in the U.S. Department of Energy (DOE) NE-81 SFWST Campaign, the DOE requested development of a high-level summary plan for activities in the DR R&D program for the next five (5)-year period, with periodic updates to this summary plan. The DR R&D 5-year plan was provided to the DOE based initially on the FY2020 priorities and program structure (initial 2020 version of this 5-year plan) and provides a strategic summary guide to the work within the DR R&D technical areas (Control Accounts, CA), focusing on the highest priority technical thrusts. This 5-year plan is a living document (planned to be updated periodically) that provides review of SFWST R&D accomplishments (as seen on the 2021 revision of this 5-year plan), describes changes to technical R&D prioritization based on (a) progress in each technical area (including external technical understanding) with specific accomplishments and (b) any changes in SFWST Campaign objectives and/or funding levels (i.e., Program Direction). Updates to this 5-year plan include the DR R&D adjustments to high-priority knowledge gaps to be investigated in the near-term, as well as the updated longer-term DR R&D directions for the program activities. This plan fulfills the Milestone M2SF23SN010304083 in DR Work Package (WP) SF-23SN01030408 (GDSA - Framework Development – SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R&D Adoption and Progress in Full Simulation of the CMS experiment

In this work we report on evolution of usage of Geant4 within CMSSW and adaptation of the newest Geant4 11.2.1, which is expected to be used for CMS simulation production in 2025. Physics validation results and results on CPU performance are reported. For the Phase-2 simulation several R&D are carried out. A significant update for CMS geometry description is performed. Different aspects of geometry description and physics simulation for the new detectors will be discussed. Progress on R&D efforts for the Phase-2 simulation will be presented, which includes reports on experience of application of G4HepEm external library.

Srimanobhas, Norraphat [Chulalongkorn U.]↗

Measuring the Muon Anomalous Magnetic Moment to High Precision [PowerPoint]

The anomalous magnetic moment of the muon, characterized as the anomaly $a_{\mu} \equiv (g_{\mu}-2)/2$, remains a compelling hint of physics beyond the Standard Model (BSM) in light of the Brookhaven E821 measurement from the early 2000s, which differs with theoretical predictions by $>$3\,$\sigma$. To address this discrepancy, the Muon $g-2$ Experiment at Fermilab (E989) has been designed to determine $a_{\mu}$ to a precision of 140 parts per billion, a four-fold improvement over the E821 measurement. This improved precision presents an excellent opportunity to uncover BSM physics, and at minimum constrain BSM prescriptions. To date, the E989 experiment has completed its first two physics runs, recording more than 3 times the statistics recorded in the E821 experiment. The collaboration is preparing for a third physics run starting in October, with the goal of accumulating a factor of three more data than the previous runs combined, resulting in an order of magnitude more statistics than the Brookhaven measurement. An overview of the experimental technique will be discussed, along with a summary of Run 1 and 2. An update of the analysis of the Run 1 data will be presented; additionally, Run 3 progress will be summarized.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Mu2e Calorimeter Final Technical Design Report

Since the first version of the Mu2e TDR released at the beginning of 2015, the Mu2e Calorimeter system has undergone a long list of changes to arrive to its final design. These changes were primarily caused by two reasons: (i) the technology choice between the TDR proposed solution of BaF2 crystals readout with solar blind Avalanche Photodiodes (APDs) and the backup option of CsI crystals readout with Silicon Photomultipliers (SiPM) has been completed and (ii) the channels numbering, the mechanical system and the readout electronics were substantially modified while proceeding with engineering towards the final project. This document updates the description of the calorimeter system adding the most recent engineering drawings and tecnical progresses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗

FY24: Progress Report on the MELCOR Modeling of the Liquid Salt Test Loop

This report outlines the activities conducted in FY24 focused on updating the liquid salt test loop (LSTL) model through the integration of a new test section featuring 16 radial tubes coupled to a filter section. Some comparative analyses of the updated model with existing experimental data for the LSTL was made and benchmarked against other computational tools, such as the ORNL code, SAM. These actions are part of a comprehensive validation effort and promote collaboration among laboratories participating in the Molten Salt Reactor (MSR) campaign.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-E-E-02: Dashboard for Tracking Physics Resident Progress

Purpose: Design a system to easily and securely track the progress of medical physics residents through their residency. Paper sign-offs while offering a real signature are not easily updated or summarized. A resident or mentor needs to be able to quickly assess what the current assignments are, what are overdue, and whether the resident is on track to complete all the tasks in a timely fashion. An electronic version can accomplish all these goals. Methods: An electronic dashboard was created in excel to not only house the tasks and sign-off but to succinctly summarize the residents progress. The first tab contains the dashboard which displays tables of the progress of the residents in each rotation, their current task, and overdue tasks. It also displays the last meetings with the residents, and timeline of important items, and a burn-down chart of the remaining tasks. This are all tied to the data and current date which auto fills the tables. The second tab contains the data. This is comprised of lists of rotations and their associated tasks along with their due dates. A signature column was also created which is password protected but allows special subset users i.e. mentors to alter without using a password. Results: The dashboard has allowed residents to better track their progress and tells them what they should be working on. It has also allowed the mentors and the program director to rapid assess their progress. Conclusion: The dashboard is successful and has been created to allow easy addition and subtraction of required tasks as the residency evolves. The next step is to create a web app version of the excel sheet with logins.

61 RADIATION PROTECTION AND DOSIMETRY↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global Carbon Budget 2021

Abstract. Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere in a changing climate is critical to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe and synthesize datasets and methodology to quantify the five major components of the global carbon budget and their uncertainties. Fossil CO2 emissions (EFOS) are based on energy statistics and cement production data, while emissions from land-use change (ELUC), mainly deforestation, are based on land use and land-use change data and bookkeeping models. Atmospheric CO2 concentration is measured directly, and its growth rate (GATM) is computed from the annual changes in concentration. The ocean CO2 sink (SOCEAN) is estimated with global ocean biogeochemistry models and observation-based data products. The terrestrial CO2 sink (SLAND) is estimated with dynamic global vegetation models. The resulting carbon budget imbalance (BIM), the difference between the estimated total emissions and the estimated changes in the atmosphere, ocean, and terrestrial biosphere, is a measure of imperfect data and understanding of the contemporary carbon cycle. All uncertainties are reported as ±1σ. For the first time, an approach is shown to reconcile the difference in our ELUC estimate with the one from national greenhouse gas inventories, supporting the assessment of collective countries' climate progress. For the year 2020, EFOS declined by 5.4 % relative to 2019, with fossil emissions at 9.5 ± 0.5 GtC yr−1 (9.3 ± 0.5 GtC yr−1 when the cement carbonation sink is included), and ELUC was 0.9 ± 0.7 GtC yr−1, for a total anthropogenic CO2 emission of 10.2 ± 0.8 GtC yr−1 (37.4 ± 2.9 GtCO2). Also, for 2020, GATM was 5.0 ± 0.2 GtC yr−1 (2.4 ± 0.1 ppm yr−1), SOCEAN was 3.0 ± 0.4 GtC yr−1, and SLAND was 2.9 ± 1 GtC yr−1, with a BIM of −0.8 GtC yr−1. The global atmospheric CO2 concentration averaged over 2020 reached 412.45 ± 0.1 ppm. Preliminary data for 2021 suggest a rebound in EFOS relative to 2020 of +4.8 % (4.2 % to 5.4 %) globally. Overall, the mean and trend in the components of the global carbon budget are consistently estimated over the period 1959–2020, but discrepancies of up to 1 GtC yr−1 persist for the representation of annual to semi-decadal variability in CO2 fluxes. Comparison of estimates from multiple approaches and observations shows (1) a persistent large uncertainty in the estimate of land-use changes emissions, (2) a low agreement between the different methods on the magnitude of the land CO2 flux in the northern extra-tropics, and (3) a discrepancy between the different methods on the strength of the ocean sink over the last decade. This living data update documents changes in the methods and datasets used in this new global carbon budget and the progress in understanding of the global carbon cycle compared with previous publications of this dataset (Friedlingstein et al., 2020, 2019; Le Quéré et al., 2018b, a, 2016, 2015b, a, 2014, 2013). The data presented in this work are available at https://doi.org/10.18160/gcp-2021 (Friedlingstein et al., 2021).

Friedlingstein, Pierre (ORCID:0000000333094739)↗

Out Brief for the Structural Reliability Partnership Workshop

The Structural Reliability Partnership Workshop was held in Albuquerque, NM on August 29-30, 2017 and was hosted by Sandia National Laboratories. Attendees were present from academia, industry and several other national laboratories. The workshop kicked off with an introduction to the SRP to familiarize potential members with what the purpose, structure and benefits would be to their organization. Technical overviews were given on several topics by attendees from each sector – national labs, universities and industry – to provide a snapshot of the type of work that is currently being conducted on structural reliability. Attendees were then given the opportunity to suggest and discuss potential Challenge Scenario topics. Three were ultimately decided upon as being the most important: Additive Manufacturing, Hydrogen Pipeline Steels, and Bolted Joined Structures. These were then analyzed using Quad Charts to determine What, How, Who, and Why these areas would be further investigated. Rather than restricting future research to only one area, the option was left open to investigate both the top two, depending on interest and cost associated with hosting such an event. More informal collaboration may be undertaken for the third topic if members have time and interest. Other items discussed pertained to the organization, structure and policies of the Partnership. Topics including Data Management, IP, and mechanisms of partnering/information sharing were touched upon but final decisions were not made. Further action is needed before this can be done. Action items were outlined and assigned, where possible. The next workshop is to be held in early August 2018 in Boulder, CO and is to be hosted by NIST. In the interim, quarterly updates are to take place via WebEx to maintain a line of communication and to ensure progress on both the administrative and technical tasks.

99 GENERAL AND MISCELLANEOUS↗

Specification of requirements for the virtual environment for reactor applications simulation environment

In 2010, the United States Dept. of Energy initiated a research and development effort to develop modern modeling and simulation methods that could utilize high performance computing capabilities to address issues important to nuclear power plant operation, safety and sustainability. To respond to this need, a consortium of national laboratories, academic institutions and industry partners (the Consortium for Advanced Simulation of Light Water Reactors - CASL) was formed to develop an integrated Virtual Environment for Reactor Applications (VERA) modeling and simulation capability. A critical element for the success of the CASL research and development effort was the development of an integrated set of overarching requirements that provides guidance in the planning, development, and management of the VERA modeling and simulation software. These requirements also provide a mechanism from which the needs of a broad array of external CASL stakeholders (e.g. reactor / fuel vendors, plant owner / operators, regulatory personnel, etc.) can be identified and integrated into the VERA development plans. This paper presents an overview of the initial set of requirements contained within the VERA Requirements Document (VRD) that currently is being used to govern development of the VERA software within the CASL program. The complex interdisciplinary nature of these requirements together with a multi-physics coupling approach to realize a core simulator capability pose a challenge to how the VRD should be derived and subsequently revised to accommodate the needs of different stakeholders. Thus, the VRD is viewed as an evolving document that will be updated periodically to reflect the changing needs of identified CASL stakeholders and lessons learned during the progress of the CASL modeling and simulation program. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PROGRESS TOWARDS NEXT GENERATION, WAVEFORM BASED THREE-DIMENSIONAL MODELS AND METRICS TO IMPROVE NUCLEAR EXPLOSION MONITORING IN THE MIDDLE EAST

Efforts to update current wave speed models of the Middle East require a thoroughly tested database of sources and recordings. Recordings of seismic waves traversing the region from Tibet to the Red Sea will be the principal metric in guiding improvements to the current wave speed model. Precise characterizations of the earthquakes, specifically depths and faulting mechanisms, are essential to avoid mapping source errors into the refined wave speed model. Errors associated with the source are manifested in amplitude and phase changes. Source depths and paths near nodal planes are particularly error prone as small changes may severely affect the resulting wavefield. Once sources are quantified, regions requiring refinement will be highlighted using adjoint tomography methods based on spectral element simulations [Komatitsch and Tromp (1999)]. An initial database of 250 regional Middle Eastern events from 1990-2007, was inverted for depth and focal mechanism using teleseismic arrivals [Kikuchi and Kanamori (1982)] and regional surface and body waves [Zhao and Helmberger (1994)]. From this initial database, we reinterpreted a large, well recorded subset of 201 events through a direct comparison between data and synthetics based upon a centroid moment tensor inversion [Liu et al. (2004)]. Evaluation was done using both a 1D reference model [Dziewonski and Anderson (1981)] at periods greater than 80 seconds and a 3D model [Kustowski et al. (2008)] at periods of 25 seconds and longer. The final source reinterpretations will be within the 3D model, as this is the initial starting point for the adjoint tomography. Transitioning from a 1D to 3D wave speed model shows dramatic improvements when comparisons are done at shorter periods, (25 s). Synthetics from the 1D model were created through mode summations while those from the 3D simulations were created using the spectral element method. To further assess errors in source depth and focal mechanism, comparisons between the three methods were made. These comparisons help to identify problematic stations and sources which may bias the final solution. Estimates of standard errors were generated for each event's source depth and focal mechanism to identify poorly constrained events. A final, well characterized set of sources and stations will be then used to iteratively improve the wave speed model of the Middle East. After a few iterations during the adjoint inversion process, the sources will be reexamined and relocated to further reduce mapping of source errors into structural features. Finally, efforts continue in developing the infrastructure required to 'quickly' generate event kernels at the n-th iteration and invert for a new, (n+1)-th, wave speed model of the Middle East. While development of the infrastructure proceeds, initial tests using a limited number of events shows the 3D model, while showing vast improvement compared to the 1D model, still requires substantial modifications. Employing our new, full source set and iterating the adjoint inversions at successively shorter periods will lead to significant changes and refined wave speed structures of the Middle East.

58 GEOSCIENCES↗

Validating Connected, Automated, and Electric Vehicle Models and Simulation - Research Performance Progress Report

The objective of this project is to test connected and automated vehicles with both electrified and internal combustion engine powertrains to support updates and validation of modeling and simulation tools. This includes the development of the components and network architecture to execute and collect empirical data for multiple scenarios and traffic interactions. Specific program objectives include: • Translate Lab algorithms into vehicle and infrastructure controls • Conduct physical testing at realistic scale • Evaluate system performance • Improve models using empirical data • Improve control algorithms from lessons learned • Identify system and algorithm assumptions which need refinement It is important to note that the objective of this project was not to demonstrate the efficacy of the selected algorithms to improve energy efficiency but rather to validate and improve modeling and simulation tools using empirical data. While it is a desirable outcome to concurrently demonstrate improved energy efficiency through use of these algorithms, and in most cases that was the outcome, the success of this project was not predicated on the performance of the algorithm towards improving energy efficiency across all scenarios and test matrices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ORNL Infrastructure: Status Update on BEA Research Reactor Cask Planning Activities Completed During FY 2025

This report documents Oak Ridge National Laboratory’s (ORNL’s) FY 2025 progress toward establishing readiness to use the Battelle Energy Alliance (BEA) Research Reactor (BRR) shipping cask in support of the Nuclear Science User Facilities (NSUF). The BRR cask will provide a new shared infrastructure capability for transporting irradiated fuels and materials between ORNL and Idaho National Laboratory (INL), thereby supporting NSUF’s mission of enabling user access to advanced nuclear research facilities. In FY 2025, ORNL advanced the regulatory, contractual, safety review, and planning activities necessary to qualify its facilities and staff for BRR cask handling. Although loaded shipments were delayed due to fabrication lead times for Orano Federal Services LLC’s internal basket hardware, the program progressed to the point where an empty cask dry run is scheduled for October 2025. This dry run represents a critical step in demonstrating ORNL’s ability to receive, handle, and return the BRR cask.

99 GENERAL AND MISCELLANEOUS↗

The PDF4LHC21 combination of global PDF fits for the LHC Run III

A precise knowledge of the quark and gluon structure of the proton, encoded by the parton distribution functions (PDFs), is of paramount importance for the interpretation of high-energy processes at present and future lepton–hadron and hadron–hadron colliders. Motivated by recent progress in the PDF determinations carried out by the CT, MSHT, and NNPDF groups, we present an updated combination of global PDF fits: PDF4LHC21. It is based on the Monte Carlo combination of the CT18, MSHT20, and NNPDF3.1 sets followed by either its Hessian reduction or its replica compression. Extensive benchmark studies are carried out in order to disentangle the origin of the differences between the three global PDF sets. In particular, dedicated fits based on almost identical theory settings and input datasets are performed by the three groups, highlighting the role played by the respective fitting methodologies. We compare the new PDF4LHC21 combination with its predecessor, PDF4LHC15, demonstrating their good overall consistency and a modest reduction of PDF uncertainties for key LHC processes such as electroweak gauge boson production and Higgs boson production in gluon fusion. We study the phenomenological implications of PDF4LHC21 for a representative selection of inclusive, fiducial, and differential cross sections at the LHC. The PDF4LHC21 combination is made available via the LHAPDF library and provides a robust, user-friendly, and efficient method to estimate the PDF uncertainties associated to theoretical calculations for the upcoming Run III of the LHC and beyond.

quantum chromodynamics↗

Lawrence Livermore National Laboratory FY 2016 Laboratory Directed Research and Development Annual Report

The LDRD annual report for FY2016 consists of two parts: The Overview. This section contains a broad description of the LDRD Program, highlights of recent accomplishments and awards, Program statistics, and the LDRD portfolio-management processes. Project Reports. Project reports are submitted by all principal investigators at the end of the fiscal year. The length and depth of the report depends on the project’s lifecycle. For projects that will be continuing the following year, the principal investigator submits a continuing project report, which is a brief update containing descriptions of the goals, scope, motivation, relevance (to DOE/NNSA and Livermore mission areas), and technical progress achieved in FY16, as well as a list of selected publications and presentations that resulted from the research. For projects that concluded in FY16, a more detailed final report is provided that is technical in nature and includes the background, objectives, scientific approach, accomplishments, and impacts on the Laboratory missions, as well as a list of publications and presentations that resulted from the research. Project reports are listed under their research topics and organized by year and type, such as exploratory research (ER), feasibility study (FS), laboratory-wide competition (LW), and strategic initiative (SI). Each project is assigned a unique tracking code, an identifier that consists of three elements. The first is the fiscal year in which the project began, the second represents the project type, and the third identifies the serial number of the project for that fiscal year. For example, 16-ERD-100 means the project is an exploratory research project that began in FY16. The three-digit number (100) represents the serial number for the project.

36 MATERIALS SCIENCE↗