Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pre-Launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

MODIS Solar Diffuser On-orbit Performance

MODIS is a key instrument for the NASA Earth Observing System (EOS), currently operated on both the Terra and Aqua missions. Each MODIS instrument has 20 reflective solar bands (RSBs) and 16 thermal emissive bands (TEBs). MODIS RSB on-orbit calibration is reflectance based using an on-board solar diffuser (SD). The SD bi-directional reflectance factors (BRFs) were characterized pre-launch using reference diffuser samples, which are traceable to NIST reflectance standards. The SD BRF on-orbit degradation (or change) is tracked by another onboard device, called the solar diffuser stability monitor (SDSM). The SDSM is operated during each scheduled SD calibration event, making alternate observations of direct sunlight and the diffusely reflected sunlight from the SD. The time series of the ratios of SDSM's SD view to its Sun view provide SD degradation information. This paper presents and compares the Terra and Aqua MODIS SD on-orbit performance. Results show that the SD on-orbit degradation depends on the amount of solar exposure of the SD plate. In addition, it is strongly wavelengthdependent, with a larger degradation rate at shorter wavelengths. For Terra MODIS, an SD door anomaly occurred in May 2003 that led to a decision to fix the door permanently at an "open" position. Since then, the SD degradation rate has significantly increased due to more frequent solar exposure. As expected, the SD on-orbit performance directly impacts the RSB calibration performance. The lessons learned from MODIS on-orbit calibration will provide useful insights into the development and operation of future SD calibration systems.

Xiong, Xiaoxiong↗

Multiyear On-orbit Calibration and Performance of Terra MODIS Thermal Emissive Bands

Since launch in December 1999, Terra MODIS has been making continuous Earth observations for more than seven years. It has produced a broad range of land, ocean, and atmospheric science data products for improvements in studies of global climate and environmental change. Among its 36 spectral bands, there are 20 reflective solar bands (RSB) and 16 thermal emissive bands (TEB). MODIS thermal emissive bands cover the mid-wave infrared (MWIR) and long-wave infrared (LWIR) spectral regions with wavelengths from 3.7 to 14.4pm. They are calibrated on-orbit using an on-board blackbody (BB) with its temperature measured by a set of thermistors on a scan-by-scan basis. This paper will provide a brief overview of MODIS TEB calibration and characterization methodologies and illustrate on-board BB functions and TEB performance over more than seven years of on-orbit operation and calibration. Discussions will be focused on TEB detector short-term stability and noise characterization, and changes in long-term response (or system gain). Results show that Terra MODIS BB operation has been extremely stable since launch. When operated at its nominal controlled temperature of 290K, the BB temperature variation is typically less than +0.30mK on a scan-by-scan basis and there has been no time-dependent temperature drift. In addition to excellent short-term stability, most TEB detectors continue to meet or exceed their specified noise characterization requirements, thus enabling calibration accuracy and science data product quality to be maintained. Excluding the noisy detectors identified pre-launch and those that occurred post-launch, the changes in TEB responses have been less than 0.7% on an annual basis. The optical leak corrections applied to bands 32-36 have been effective and stable over the entire mission

Xiong, Xiaoxiong↗

Characterization of MODIS Solar Diffuser On-orbit Degradation

MODIS reflective solar bands (RSB) are calibrated on-orbit by a solar diffuser (SD) and a solar diffuser stability monitor (SDSM). The SD bi-directional reflectance factor (BRF) was characterized pre-launch by the instrument vendor using reference samples traceable to NIST reflectance standards. Its on-orbit degradation is regularly monitored by the SDSM. It consists of a solar integration sphere (SIS) with 9 filtered detectors with wavelengths ranging from 0.41 to 0.94 micrometer, a rotating mirror assembly, and an electronics module. During each SD/SDSM calibration, the SDSM views the sunlight directly and the sunlight diffusely reflected from the SD panel. The time series of SDSM measurements (ratio of the SD view response to the Sun view response) is used to compute the SD BRF degradation at each SDSM detector wavelength. Since launch Terra MODIS has operated for more than seven years and Aqua for nearly five years. The SD panel on each MODIS instrument has experienced noticeable degradation with the largest changes observed in the VIS spectral region. Following a brief description of the MODIS RSB calibration methodology and SD/SDSM operational activities, this paper illustrates the SD on-orbit degradation results for both Terra and Aqua MODIS. It discusses the impacts on the SD RF degradation due to sensor operational conditions and SD solar exposure time. For Aqua MODIS, operated under the same conditions, the SD annual degradation rate is approximately 2.9% at 0.41 micrometers, 1.6% at 0.47 micrometers, and less than 1.1% at wavelengths above 0.53 micrometers. For Terra MODIS, however, an SD door (SDD) related anomaly in May 2003 had led to a decision to keep the SDD permanently at its open position. Since then its SD has experienced a much faster SD degradation rate.

Xiong, X.↗

Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

risk managment↗

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes↗

Cassini's Test Methodology for Flight Software Verification and Operations

The Cassini spacecraft was launched on 15 October 1997 on a Titan IV-B launch vehicle. The spacecraft is comprised of various subsystems, including the Attitude and Articulation Control Subsystem (AACS). The AACS Flight Software (FSW) and its development has been an ongoing effort, from the design, development and finally operations. As planned, major modifications to certain FSW functions were designed, tested, verified and uploaded during the cruise phase of the mission. Each flight software upload involved extensive verification testing. A standardized FSW testing methodology was used to verify the integrity of the flight software. This paper summarizes the flight software testing methodology used for verifying FSW from pre-launch through the prime mission, with an emphasis on flight experience testing during the first 2.5 years of the prime mission (July 2004 through January 2007).

Cassini Mission↗

JPL Test Effectiveness Analysis

1) The pilot study provided meaningful conclusions that are generally consistent with the earlier Test Effectiveness work done between 1992 and 1994: a) Analysis of pre-launch problem/failure reports is consistent with earlier work. b) Analysis of post-launch early mission anomaly reports indicates that there are more software issues in newer missions, and the no-test category for identification of post-launch failures is more significant than in the earlier analysis. 2) Future work includes understanding how differences in Missions effect these analyses: a) There are large variations in the number of problem reports and issues that are documented by the different Projects/Missions. b) Some missions do not have any reported environmental test anomalies, even though environmental tests were performed. 3) Each project/mission has different standards and conventions for filling out the PFR forms, the industry may wish to address this issue: a) Existing problem reporting forms are to document and track problems, failures, and issues (etc.) for the projects, to ensure high quality. b) Existing problem reporting forms are not intended for data mining.

failure cause↗

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Schwabacher, Mark A.↗

International Space Station External Contamination Status

PResentation slides examine external contamination requirements; International Space Station (ISS) external contamination sources; ISS external contamination sensitive surfaces; external contamination control; external contamination control for pre-launch verification; flight experiments and observations; the Space Shuttle Orbiter waste water dump, materials outgassing, active vacuum vents; example of molecular column density profile, modeling and analysis tools; sources of outgassing induced contamination analyzed to date, quiescent sources, observations on optical degradation due to induced external contamination in LEO; examples of typical contaminant and depth profiles; and status of the ISS system, material outgassing, thruster plumes, and optical degradation.

Mikatarian, Ron↗

Space Environment Factors Affecting the Performance of International Space Station Materials: The First Two Years of Flight Operations

In this paper, the natural and induced space environment factors affecting materials performance on ISS are described in some detail. The emphasis will be on ISS flight experience and the more significant design and development issues of the last two years. The intent is to identify and document the set of space environment factors, affecting materials, that are producing the largest impacts on the ISS flight hardware verification and acceptance process and on ISS flight operations. Orbital inclination (S1.6 ) and altitude (nominal3S0 km to 400 km altitude) determine the set of natural environment factors affecting the functional life of materials and subsystems on ISS. ISS operates in the F2 region of Earth's ionosphere in well-defined fluxes of atomic oxygen, other ionospheric plasma species, and solar UV, VUV, and x-ray radiation, as well as galactic cosmic rays, trapped radiation, and solar cosmic rays (1,2). The high latitude orbital environment also exposes external surfaces to significantly less well-defined or predictable fluxes of higher energy trapped electrons and auroral electrons (3 ,4). The micrometeoroid and orbital debris environment is an important determinant of spacecraft design and operations in any orbital inclination. Environment factors induced by ISS flight operations include ram-wake effects, magnetic induction voltages arising from flight through Earth's magnetic field, hypergolic thruster plume impingement from proximity operations of visiting vehicles, materials outgassing, venting and dumping of fluids, ISS thruster operations, as well as specific electrical power system interactions with the ionospheric plasma (S-7). ISS must fly in a very limited number of approved flight attitudes leading to location specific environmental exposures and extreme local thermal environments (8). ISS is a large vehicle and produces a deep wake structure from which both ionospheric plasma and neutrals (atomic oxygen) are largely excluded (9-11). At high latitude, the ISS wake may produce a spacecraft charging environment similar to that experienced by the DMSP and Freja satellites (800 to 100 km altitude polar orbits), especially during geo-magnetic disturbances (12-14). ISS is also subject to magnetic induction voltages (VxB L) on conducting structure, a result of high velocity flight through Earth's magnetic field. The magnitude of the magnetic induction voltage varies with location on ISS, as well as the relative orientation of the vehicle velocity vector and planetary magnetic field vector, leading to maximum induction voltages at high latitude (15). The space environment factors, natural and induced, that have had the largest impact on pre-launch ISS flight hardware verification and flight operations during the first two years of ISS flight operations are listed below and grouped according to the physical and chemical processes driving their interaction with ISS materials.

Koontz, Steven L.↗

An Infrared Solution to a National Priority NASA Ice Detection and Measurement Problem

NASA has a serious problem with ice that forms on the cryogenic-filled Space Shuttle External Tank (ET) that could endanger the crew and vehicle. This problem has defied resolution in the past. To find a solution, a cooperative agreement was developed between NASA-Kennedy Space Center (KSC) and the U.S. Army-Tank-Automotive, armaments Research, Development & Engineering Center (TARDEC). This paper describes the need, initial investigation, solution methodology, and some results for a mobile near-IR ice detection and measurement system developed by MDA of Canada and jointly tested by the U.S. Army TARDEC and NASA. Performance results achieved demonstrate that the pre-launch inspection system has the potential to become a critical tool in addressing NASA's ice problem.

Meitzler, Thomas↗

Enhancing the NASA Expendable Launch Vehicle Payload Safety Review Process Through Program Activities

The safety review process for NASA spacecraft flown on Expendable Launch Vehicles (ELVs) has been guided by NASA-STD 8719.8, Expendable Launch Vehicle Payload Safety Review Process Standard. The standard focused primarily on the safety approval required to begin pre-launch processing at the launch site. Subsequent changes in the contractual, technical, and operational aspects of payload processing, combined with lessons-learned supported a need for the reassessment of the standard. This has resulted in the formation of a NASA ELV Payload Safety Program. This program has been working to address the programmatic issues that will enhance and supplement the existing process, while continuing to ensure the safety of ELV payload activities.

Palo, Thomas E.↗

Safety Considerations in the Ground Environment

In the history of humankind, every great space adventure has begun on the ground. While this seems to be stating the obvious, mission and spacecraft designers who have overlooked this fact have paid a high price, either in loss or damage to the spacecraft pre-launch, or in mission failure or reduction. Spacecraft personnel may risk not only their flight hardware, but they may also risk their lives, their co-workers lives and even the general public by not heeding safety on the ground. Their eyes may be on the stars but their feet are on the ground! One additional comment: Although the design requirements are very different for human rated and nonhuman rated flight hardware, while on the ground that flight hardware (and its ground support equipment) doesn't care about what it is flying on. On the ground, additional requirements are often levied to protect the work force and general public. (Authors' Note: The source material for this chapter is primarily taken from the Kennedy Space Center Handbook (KHB) 1700.7/45 SW Handbook S-100 Space Shuttle Payload Ground Safety Handbook and the authors' personal experiences.

Kirkpatrick, Paul D.↗

Ground Safety Issues

In the history of humankind, every space adventure, great or small, has begun on the ground. While this seems to be stating the obvious, mission and flight hardware designers who have overlooked this fact have paid a high price, either in loss or damage to the hardware pre-launch, or in mission failure or reduction. Designers may risk not only their flight hardware, but they may also risk their lives, their co-workers lives and even the general public by not heeding safety on the ground. Their eyes may be on the stars but their feet are on the ground! This discussion applies to all forms of flight hardware from the largest rockets to the smallest spare parts.

Kirkpatrick, Paul D.↗

Cassini-Huygens Maneuver Experience: Ending the Prime Mission

The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year cruise, it entered a Saturnian orbit for a four-year, prime mission. This paper highlights significant maneuver activities performed during the last year of the prime mission. Specifically, results of 42 recent maneuvers are presented. Many maneuvers have been skipped, saving fuel and flight team effort. The system has performed more accurately than the pre-launch expectations and requirements. This is in large part why the Cassini-Huygens spacecraft has been navigated with tremendous success during the prime mission.

Saturn↗

Overview of the TOPEX/Poseidon Platform Harvest Verification Experiment

An overview is given of the in situ measurement system installed on Texaco's Platform Harvest for verification of the sea-level measurement from the TOPEX/POSEIDON satellite. The pre-launch error budget suggested that the total root mean square (RMS) error due to measurements made at this verification site would be less than four centimeters.

satellite↗

TOPEX/Poseidon Electrical Power System - Performance

This paper shows that the power system performance (batteries, solar array, power regulator) on-board the TOPEX/Poseidon satellite has met or exceeded pre-launch predicitons and has successfully managed the performance of NiCd batteries which had shown anomalous performance on other missions such as UARS and GRO.

batteries↗

Ground-based Validation of the EOS Multi-angle Imaging SpectroRadiometer (MISR) Aerosol Retrieval Algorithms and Science Data Products

A plan for the ground-based validation of MISR aerosol retrieval is outlined. Activities occur in two phases: (1) pre-launch, work is focused on technique development and MISR algorithm validation using conventional ground-base methods and a MISR simulator (AirMISR) operating from the ER-2 aircraft to simulate MISR on-orbit observations. (2) Post-launch, the validation program relies on ground campaigns, underflights wit the MISR simulator and the use of local measurements fo aerosol loading and properties and irradiance measurements derived from the AERONET and ISIS networks.

algorithm↗