Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Exploration of Use of Copulas in Analysing the Relationship between Precipitation and Meteorological Drought in Beijing, China

Drought risk analysis is essential for regional water resource management. In this study, the probabilistic relationship between precipitation and meteorological drought in Beijing, China, was calculated under three different precipitation conditions (precipitation equal to, greater than, or less than a threshold) based on copulas. The Standardized Precipitation Evapotranspiration Index (SPEI) was calculated based on monthly total precipitation and monthly mean temperature data. The trends and variations in the SPEI were analysed using Hilbert-Huang Transform (HHT) and Mann-Kendall (MK) trend tests with a running approach. The results of the HHT and MK test indicated a significant decreasing trend in the SPEI. The copula-based conditional probability indicated that the probability of meteorological drought decreased as monthly precipitation increased and that 10 mm can be regarded as the threshold for triggering extreme drought. From a quantitative perspective, when R ≤ mm, the probabilities of moderate drought, severe drought, and extreme drought were 22.1%, 18%, and 13.6%, respectively. This conditional probability distribution not only revealed the occurrence of meteorological drought in Beijing but also provided a quantitative way to analyse the probability of drought under different precipitation conditions. Furthermore, the results provide a useful reference for future drought prediction.

54 ENVIRONMENTAL SCIENCES↗

Treatment of Passive Component Reliability in Risk-Informed Safety Margin Characterization FY 2010 Report

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, is founded on probabilistic characterizations of SSC performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bridging Resilience Engineering and Human Reliability Analysis

There has been strong interest in the new and emerging field called resilience engineering. This field has been quick to align itself with many existing safety disciplines, but it has also distanced itself from the field of human reliability analysis. To date, the discussion has been somewhat one-sided, with much discussion about the new insights afforded by resilience engineering. This paper presents an attempt to address resilience engineering from the perspective of human reliability analysis (HRA). It is argued that HRA shares much in common with resilience engineering and that, in fact, it can help strengthen nascent ideas in resilience engineering. This paper seeks to clarify and ultimately refute the arguments that have served to divide HRA and resilience engineering.

99 GENERAL AND MISCELLANEOUS↗

Dakota uncertainty quantification methods applied to the NEK-5000 SAHEX model.

This report summarizes the results of a NEAMS project focused on the use of uncertainty and sensitivity analysis methods within the NEK-5000 and Dakota software framework for assessing failure probabilities as part of probabilistic risk assessment. NEK-5000 is a software tool under development at Argonne National Laboratory to perform computational fluid dynamics calculations for applications such as thermohydraulics of nuclear reactor cores. Dakota is a software tool developed at Sandia National Laboratories containing optimization, sensitivity analysis, and uncertainty quantification algorithms. The goal of this work is to demonstrate the use of uncertainty quantification methods in Dakota with NEK-5000.

Weirs, V. Gregory↗

Probabilistic model for fracture mechanics service life analysis

The service longevity of complex propulsion systems, such as the Space Shuttle Main Engine (SSME), can be at risk from several competing failure modes. Conventional life assessment practice focuses upon the most severely life-limited feature of a given component, even though there may be other, less severe, potential failure locations. Primary, secondary, tertiary failure modes, as well as their associated probabilities, must also be considered. Futhermore, these probabilities are functions of accumulated service time. Thus a component may not always succumb to the most severe, or even the most probable failure mode. Propulsion system longevity must be assessed by considering simultaneously the actions of, and interactions among, life-limiting influences. These include, but are not limited to, high frequency fatigue (HFF), low cycle fatigue (LCF), and subsequent crack propagation, thermal and acoustic loadings, and the influence of less-than-ideal nondestructive evaluation (NDE). An outline is provided for a probabilistic model for service life analysis, and the progress towards its implementation is reported.

Annis, Charles↗

Development of Probabilistic Risk Assessment Model for BWR Shutdown Modes 4 and 5 Integrated in SPAR Model

Nuclear plant operating experience and several studies show that the risk from shutdown operation during modes 4, 5, and 6 can be significant This paper describes development of the standard template risk evaluation models for shutdown modes 4, and 5 for commercial boiling water nuclear power plants (BWR). The shutdown probabilistic risk assessment model uses full power Nuclear Regulatory Commission’s (NRC’s) Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The shutdown PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from SPAR full power model with shutdown event tree logic. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheet, including the performance shaping factors (PSFs). The results are then used to estimate HEP of interest. The preliminary results indicate the risk is dominated by the operator’s ability to diagnose the events and provide long term cooling.

99 GENERAL AND MISCELLANEOUS↗

Estimating the Likelihood of GHG Concentration Scenarios From Probabilistic Integrated Assessment Model Simulations

The climate scenarios that form the basis for current climate risk assessments have no assigned probabilities, and this impedes the analysis of future climate risks. This paper proposes an approach to estimate the probability of carbon dioxide (CO 2 ) concentration scenarios used in key climate change modeling experiments. It computes the CO 2 emissions compatible with the concentrations prescribed by Coupled Model Intercomparison Project Phase 5 (CMIP5) and CMIP6 experiments. The distribution of these compatible cumulative emissions is interpreted as the likelihood of future emissions given a concentration pathway. Using Bayesian analysis, the probability of each pathway can be estimated from a probabilistic sample of future emissions. The approach is demonstrated with five probabilistic CO 2 emission simulation ensembles from four Integrated Assessment Models (IAM), leading to independent estimates of the likelihood of the CO 2 concentration of Representative Concentration Pathways (RCP) and Shared Socioeconomic Pathways (SSP). Results suggest that SSP5-8.5 is unlikely for the second half of the 21st century, but offer no clear consensus on which of the remaining scenarios is most likely. Estimates of likelihoods of CO 2 concentrations associated with RCP and SSP scenarios are affected by sampling errors, differences in emission sources simulated by the IAMs, and a lack of a common experimental framework for IAM simulations. These shortcomings, along with a small IAM ensemble size, limit the applicability of the results presented here. Novel joint IAM and the Earth System Model experiments are needed to deliver actionable probabilistic climate risk assessments.

54 ENVIRONMENTAL SCIENCES↗

A Hygrothermal Risk Analysis Applied to Residential Unvented Attics

Aresidential building, constructed with an unvented attic, is acommonroof assembly in the United States.The expected hygrothermal performance and service life of the roof are difficult to estimate due to a number of varying parameters.Typical parameters expected to vary are the climate, direction, and slope of the roof as well as the radiation properties of the surface material. Furthermore, influential parameters are indoor moisture excess, air leakages through the attic floor, and leakages from air-handling unit and ventilation ducts. In addition, the type of building materials such as the insulation material and closed or open cell spray polyurethane foam will influence the future performance of the roof. A development of a simulation model of the roof assembly will enable a risk and sensitivity analysis, in which the most important varying parameters on the hygrothermal performance can be determined. The model is designed to perform probabilistic simulations using mathematical and hygrothermal calculation tools. The varying input parameters can be chosen from existing measurements, simulations, or standards. An analysis is applied to determine the risk of consequences, such as mold growth, rot, or energy demand of the HVAC unit. Furthermore, the future performance of the roof can be simulated in different climates to facilitate the design of an efficient and reliable roof construction with the most suitable technical solution and to determine the most appropriate building materials for a given climate

Pallin, Simon B↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Research Roadmap for Computation-Based Human Reliability Analysis

The United States (U.S.) Department of Energy (DOE) is sponsoring research through the Light Water Reactor Sustainability (LWRS) program to extend the life of the currently operating fleet of commercial nuclear power plants. The Risk Informed Safety Margin Characterization (RISMC) research pathway within LWRS looks at ways to maintain and improve the safety margins of these plants. The RISMC pathway includes significant developments in the area of thermalhydraulics code modeling and the development of tools to facilitate dynamic probabilistic risk assessment (PRA). PRA is primarily concerned with the risk of hardware systems at the plant; yet, hardware reliability is often secondary in overall risk significance to human errors that can trigger or compound undesirable events at the plant. This report highlights ongoing efforts to develop a computation-based approach to human reliability analysis (HRA). This computation-based approach differs from existing static and dynamic HRA approaches in that it: (i) interfaces with a dynamic computation engine that includes a full scope plant model, and (ii) interfaces with a PRA software toolset. The computation-based HRA approach presented in this report is called the Human Unimodels for Nuclear Technology to Enhance Reliability (HUNTER) and incorporates in a hybrid fashion elements of existing HRA methods to interface with new computational tools developed under the RISMC pathway. The goal of this research effort is to model human performance more accurately than existing approaches, thereby minimizing modeling uncertainty found in current plant risk models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dependence in probabilistic modeling Dempster-Shafer theory and probability bounds analysis

This report summarizes methods to incorporate information (or lack of information) about inter-variable dependence into risk assessments that use Dempster-Shafer theory or probability bounds analysis to address epistemic and aleatory uncertainty. The report reviews techniques for simulating correlated variates for a given correlation measure and dependence model, computation of bounds on distribution functions under a specified dependence model, formulation of parametric and empirical dependence models, and bounding approaches that can be used when information about the intervariable dependence is incomplete. The report also reviews several of the most pervasive and dangerous myths among risk analysts about dependence in probabilistic models.

Ferson, Scott↗

Dynamic systems-engineering process - The application of concurrent engineering

A system engineering methodology is described which enables users, particulary NASA and DOD, to accommodate changing needs; incorporate emerging technologies; identify, quantify, and manage system risks; manage evolving functional requirements; track the changing environment; and reduce system life-cycle costs. The approach is a concurrent, dynamic one which starts by constructing a performance model defining the required system functions and the interrelationships. A detailed probabilistic risk assessment of the system elements and their interrelationships is performed, and quantitative analysis of the reliability and maintainability of an engineering system allows its different technical and process failure modes to be identified and their probabilities to be computed. Decision makers can choose technical solutions that maximize an objective function and minimize the probability of failure under resource constraints.

Wiskerchen, Michael J.↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Evaluation of the Benefits of ATF, FLEX, and Passive Cooling System for an Enhanced Resilient PWR Model

This report, along with report INL/EXT-19-53556, documents the activities performed by Idaho National Laboratory (INL) during the fiscal year (FY) 2019 for the DOE Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. This report includes additional accident scenarios for risk-informed ATF analysis, and examines the risk impacts of FLEX and passive cooling system on nuclear power plants (NPPs) from additional perspectives. The same analysis process, risk analysis approaches, and analysis tools as in FY 2018 were used for near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the small break loss-of-coolant accident (SBLOCA) scenarios, two types of general transient scenarios (locked rotor and turbine trip), and main steam line break (MSLB) scenarios. Benchmark calculations for ATF analysis using RELAP5-3D and MELCOR are also presented. In addition, based on the generic probabilistic risk assessment (PRA) model, the risk impacts of FLEX and the dynamic natural convection (DNC) system on NPPs are evaluated through a risk-informed decision-making process, i.e., significance determination process (SDP).

99 GENERAL AND MISCELLANEOUS↗

Sensitivity Analysis of Successful Evacuee Proportion in Hypothetical Seismic Nuclear Emergency Situation

A magnitude 5.8 earthquake, which is the strongest earthquake ever detected in Korea, occurred in Gyeongju on 12 September, 2016. People were worried about not only the impact to their safety and quality of life as directly affected from the earthquake, but also the secondary impact from such a nuclear power plant (NPP) accident incurred by the earthquake. Public awareness is changing such that the risk of earthquakes is no longer a story of other countries. Even if the current situation in Korea is not regarded, it is important to assess the seismic hazard to an NPP and prepare for preventing the effects related with the earthquake impact. Developing a seismic evacuation model is necessary in a part of a level 3 probabilistic safety assessment (PSA) because it is one of the most affecting factors of public radiation exposure and health effects in an emergency phase. In a previous study, a sensitivity analysis of the evacuation speed in a hypothetical NPP accident by an earthquake has been carried out, and population doses resulting from various seismic evacuation scenarios associated with evacuation speed have been compared. In addition to the previous study, the proportion of evacuees who evacuate successfully with adequate speed has been considered and a sensitivity analysis has been performed in this study.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Common-Cause Failure Analysis in Event Assessment

This paper describes the approach taken by the U. S. Nuclear Regulatory Commission to the treatment of common-cause failure in probabilistic risk assessment of operational events. The approach is based upon the Basic Parameter Model for common-cause failure, and examples are illustrated using the alpha-factor parameterization, the approach adopted by the NRC in their Standardized Plant Analysis Risk (SPAR) models. The cases of a failed component (with and without shared common-cause failure potential) and a component being unavailable due to preventive maintenance or testing are addressed. The treatment of two related failure modes (e.g., failure to start and failure to run) is a new feature of this paper. These methods are being applied by the NRC in assessing the risk significance of operational events for the Significance Determination Process (SDP) and the Accident Sequence Precursor (ASP) program.

99 GENERAL AND MISCELLANEOUS↗