Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Astrometric Telescope Facility - Status report

The advent of the Space Station Program has provided an unexpected opportunity for the Astrometric Telescope Facility (ATF) study program by providing a potential long-duration on-orbit serviceable platform. It required a concept change for ATF from a free-flyer observatory to a Space-Station-based Observatory. The program was sent in this new direction at the start of fiscal year 1985, and program plans including study schedules and science and technical requirements are being revised and defined. The facility is designed to be versatile and capable of fulfilling the primary goal of planet detection, and to be highly useful for other astrophysics observations. Basically the ATF observing program is a long-duration plan requiring repetitive observations of single stars over a one to two decade period. These repetitive observations are needed to provide data necessary to conclusively determine the existence (or nonexistence) of planets of the Uranus and Neptune class in extrasolar planetary systems.

Nishioka, K.↗

Background, current status, and prognosis of the ongoing slush hydrogen technology development program for the NASP

Among the Hydrogen Projects at the NASA Lewis Research Center (NASA LeRC), is the task of implementing and managing the Slush Hydrogen (SLH2) Technology Program for the United States' National AeroSpace Plane Joint Program Office (NASP JPO). The objectives of this NASA LeRC program are to provide verified numerical models of fluid production, storage, transfer, and feed systems and to provide verified design criteria for other engineered aspects of SLH2 systems germane to a NASP. The pursuit of these objectives is multidimensional, covers a range of problem areas, works these to different levels of depth, and takes advantage of the resources available in private industry, academia, and the U.S. Government. A summary of the NASA LeRC overall SLH2 program plan, is presented along with its implementation, the present level of effort in each of the program areas, some of the results already in hand, and the prognosis for the effort in the immediate future.

Dewitt, R. L.↗

SWITCH user's manual

The planning program, SWITCH, and its surrounding changed-goal-replanning program, Runaround, are described. The evolution of SWITCH and Runaround from an earlier planner, DEVISER, is recounted. SWITCH's plan representation, and its process of building a plan by backward chaining with strict chronological backtracking, are described. A guide for writing knowledge base files is provided, as are narrative guides for installing the program, running it, and interacting with it while it is running. Some utility functions are documented. For the sake of completeness, a narrative guide to the experimental discrepancy-replanning feature is provided. Appendices contain knowledge base files for a blocksworld domain, and a DRIBBLE file illustrating the output from, and user interaction with, the program in that domain.

Source record↗

Certainty grids for mobile robots

A numerical representation of uncertain and incomplete sensor knowledge called Certainty Grids has been used successfully in several mobile robot control programs, and has proven itself to be a powerful and efficient unifying solution for sensor fusion, motion planning, landmark identification, and many other central problems. Researchers propose to build a software framework running on processors onboard the new Uranus mobile robot that will maintain a probabilistic, geometric map of the robot's surroundings as it moves. The certainty grid representation will allow this map to be incrementally updated in a uniform way from various sources including sonar, stereo vision, proximity and contact sensors. The approach can correctly model the fuzziness of each reading, while at the same time combining multiple measurements to produce sharper map features, and it can deal correctly with uncertainties in the robot's motion. The map will be used by planning programs to choose clear paths, identify locations (by correlating maps), identify well-known and insufficiently sensed terrain, and perhaps identify objects by shape. The certainty grid representation can be extended in the same dimension and used to detect and track moving objects.

Moravec, H. P.↗

The Nation's Vision for Exploration: An Update

I.Current key activities: a) Constellation Level2-System Engineering. b) Lunar Architecture Team (LAT)2-technology assessment and architectural option for the lander. c) Mars Architecture Team-system engineering support, Science integration, precursor program planning. d) Lunar Lander Project Core Team-GN&C and Flight system engineering. e) Technology program-supporting multiple projects in robotics, power systems, aero entry technology. f) Mission Operation Project-Mission operations system engineering. g) Advanced Environmental Monitoring Instruments. H. Lunar Reconnaissance Orbiter instrument (Diviner). II. Mission Proposals a) Lunar Sample return. b) Lunar Gravity field mapper.

space exploration↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, human lunar exploration to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Systems cost/performance analysis (study 2.3). Volume 3: Programmer's manual and user's guide

The systems cost/performance model was implemented as a digital computer program to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses. The computer is described along with the operating environment in which the program was written and checked, the program specifications such as discussions of logic and computational flow, the different subsystem models involved in the design of the spacecraft, and routines involved in the nondesign area such as costing and scheduling of the design. Preliminary results for the DSCS-II design are also included.

Janz, R. F.↗

Research opportunities in human behavior and performance

Extant information on the subject of psychological aspects of manned space flight are reviewed; NASA's psychology research program is examined; significant gaps in knowledge are identified; and suggestions are offered for future research program planning. Issues of human behavior and performance related to the United States space station, to the space shuttle program, and to both near and long term problems of a generic nature in applicable disciplines of psychology are considered. Topics covered include: (1) human performance requirements for a 90 day mission; (2) human perceptual, cognitive, and motor capabilities and limitations in space; (3) crew composition, individual competencies, crew competencies, selection criteria, and special training; (4) environmental factors influencing behavior; (5) psychosocial aspects of multiperson space crews in long term missions; (6) career determinants in NASA; (7) investigational methodology and equipment; and (8) psychological support.

Christensen, J. M.↗

From Here to There - Bird's Eye Perspective on Grant Lifecycle and Administration

“What gets measured gets done ”or “measure it to manage it”. The statements have become matter of fact. However, measurement (and even metrics) alone cannot fully communicate an organization’s story without the point of accountability. As a dynamic org, we must measure what is necessary, using the appropriate lenses to analyze the most relevant information that allows robust decision-making. A key function of Program Planning and Control (PP&C) is to assist HRP in the development of such strategy that ensures the proper execution of program research goals. With introspection of the Technical Officer role as defined by 2 CFR(i.e., Part 200, Part 1800)and subsequent governance under the NASA Grant and Cooperative Agreement Manual (GCAM), we’ve realized an obvious disconnect among Principal Investigator’s (PI),technical communication with the elements and some of the administrative/fiduciary requirements that should run parallel to the science work. This find has introduced new program risks as evidenced through incomplete deliverables or other less-than-successful requirements through the lifecycle for work we fund. One solution the Grants Technical Officer proposes is for PP&C to share in the communication with stakeholders of grants administration much earlier in the award process in attempt to reduce programmatic risks; particularly in data, reporting and performance management. As such, the planned IWS 2022 session will focus on(plenary) topics that include (1) definition of the grant lifecycle, (2) anatomy of a grant(NF1687 the award document), and (3)performance measurement/post-award monitoring. As HH&P pursues its strategic objectives to evolve the directorate into a data rich and knowledge rich organization, it has become increasingly important to develop the multiple levels of insight across the program to ensure data and other reporting(qualitative/quantitative), alongside proper administration. And the desired outcome is to make certain HRP meets/exceeds the accountability standard that our research information is received, maintained and accessible in posterity.

Lucy D Barnes-Moten↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station and other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, all human exploration beyond Low Earth Orbit to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to the average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Upward Mobility Program Handbook

This handbook contains the policy and program objectives of the NASA Upward Mobility Program. In addition it gives guidance regarding program planning, implementation, and evaluation and also describes the roles and responsibilities of key personnel responsible for the successful implementation of the program. The Federal Personnel Manual Chapter 720 explains the Federal Government's policy on upward mobility and is available from the installation personnel office upon request. This handbook is applicable to all NASA installations. Unless specifically limited, all responsibilities set forth in this plan for the Installation Personnel Director may be administered wholly or in part by the Personnel Director's designee. This handbook will be revised by page changes.

Source record↗

A Contrast in Use of Metrics in Earth Science Data Systems

In recent years there has been a surge in the number of systems for processing, archiving and distributing remotely sensed data. Such systems, working independently as well as in collaboration, have been contributing greatly to the advances in the scientific understanding of the Earth system, as well as utilization of the data for nationally and internationally important applications. Among such systems, we consider those that are developed by or under the sponsorship of NASA to fulfill one of its strategic objectives: "Study Earth from space to advance scientific understanding and meet societal needs." NASA's Earth science data systems are of varying size and complexity depending on the requirements they are intended to meet. Some data systems are regarded as NASA's "Core Capabilities" that provide the basic infrastructure for processing, archiving and distributing a set of data products to a large and diverse user community in a robust and reliable manner. Other data systems constitute "Community Capabilities". These provide specialized and innovative services to data users and/or research products offering new scientific insight. Such data systems are generally supported by NASA through peer reviewed competition. Examples of Core Capabilities are 1. Earth Observing Data and Information System (EOSDIS) with its Distributed Active Archive Centers (DAACs), Science Investigator-led Processing Systems (SIPSs), and the EOS Clearing House (ECHO); 2. Tropical Rainfall Measurement Mission (TRMM) Science Data and Information System (TSDIS); 3. Ocean Data Processing System (ODPS); and 4. CloudSat Data Processing Center. Examples of Community Capabilities are projects under the Research, Education and Applications Solutions Network (REASON), and Advancing Collaborative Connections for Earth System Science (ACCESS) Programs. In managing these data system capabilities, it is necessary to have well-established goals and to measure progress relative to them. Progress is measured through "metrics", which can be a combination of quantitative as well as qualitative assessments. The specific metrics of interest depend on the user of the metrics as well as the type of data system. The users of metrics can be data system managers, program managers, funding agency or the public. Data system managers need metrics for assessing and improving the performance of the system and for future planning. Program managers need metrics to assess progress and the value of the data systems sponsored by them. Also, there is a difference in the metrics needed for core capabilities that tend to be more complex, larger and longer-term compared to community capabilities and the community capabilities that tend to be simpler, smaller and shorter-term. Even among community capabilities there are differences; hence the same set of metrics does not apply to all. Some provide data products to users, some provide services that enable better utilization of data or interoperability among other systems, and some are a part of a larger project where provision of data or services is only a minor activity. There is also a contrast between metrics used for internal and external purposes. Examples of internal purposes are: ensuring that the system meets its requirements, and planning for evolution and growth. Examples of external purposes are: providing to sponsors indicators of success of the systems, demonstrating the contributions of the system to overall program success, etc. This paper will consider EOSDIS, REASON and ACCESS programs to show the various types of metrics needed and how they need to be tailored to the types of data systems while maintaining the overall management goals of measuring progress and contributions made by the data systems.

Ramapriyan, Hampapuram↗

Exploration Capabilities Data Analysis: An Integrated Approach

In preparation for humanity’s return to the Moon, it is necessary to advance technologies and capabilities that will allow for human sustainability on the lunar surface, as well as on eventual missions to send humans to Mars. Guided by Space Policy Directive-1 and through the National Aeronautical and Space Administration (NASA) Artemis program, the advancement and development of technologies on the lunar surface will be leveraged towards technologies and knowledge needed for humans to successfully and safely go to Mars and return. In order to understand the capability needs for lunar and Mars missions, the Capabilities Integration Team identifies integration approaches and overlaps between missions to develop strategies for advancing key capabilities that support those needs. Since 2013, the Capabilities Integration Team has reached out to subject matter experts, principal technologists, and system capability leadership teams throughout NASA to gather information about the critical technologies and capabilities needed in order to support the lunar and Mars exploration missions. To properly gather this data, the Capabilities Integration Team used a capability-driven approach to identify gaps between the current state of the art and the needs of proposed exploration missions, as well as activities that may close those gaps. These inputs are used to shape technology investment strategies and are incorporated in missions to the lunar and Mars surfaces. Data collected included: gap definitions and identifying information; gap closure information and metrics for success; mapping of gaps to elements of NASA's Artemis program and future exploration architecture. . The data collected, specifically from the technology gap list, has been used to support the NASA Human Exploration and Operations Mission Directorate Planning, Programming, Budgeting, and Execution processes, as well as the NASA Space Technology Mission Directorate Strategic Technology Plans. This paper discusses the integration approach used by the Capabilities Integration Team to identify current capability gaps for the Moon to Mars architecture and what capabilities exist or must be developed to support those architecture needs. In addition, this paper also details the performance, gap characterization, current capability gap closure opportunities, and risk impacts towards Artemis, and the overall Moon to Mars architecture.

Gregory Benjamin↗

Third International Symposium on Artificial Intelligence, Robotics, and Automation for Space 1994

The Third International Symposium on Artificial Intelligence, Robotics, and Automation for Space (i-SAIRAS 94), held October 18-20, 1994, in Pasadena, California, was jointly sponsored by NASA, ESA, and Japan's National Space Development Agency, and was hosted by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology. i-SAIRAS 94 featured presentations covering a variety of technical and programmatic topics, ranging from underlying basic technology to specific applications of artificial intelligence and robotics to space missions. i-SAIRAS 94 featured a special workshop on planning and scheduling and provided scientists, engineers, and managers with the opportunity to exchange theoretical ideas, practical results, and program plans in such areas as space mission control, space vehicle processing, data analysis, autonomous spacecraft, space robots and rovers, satellite servicing, and intelligent instruments.

Source record↗

Fermilab Neutrino Program – Accelerators & Experiments

We provide an overview of the Fermilab neutrino program, including details for both the accelerator and experiment aspect of the program. On the accelerator side, the current operation of the proton complex is presented, alongside the status of the upcoming PIP-II upgrade and the newly proposed ACE-MIRT upgrade. On the detector side, the SBN and NOVA programs are presented, as well as the status of the upcoming DUNE/LBNF upgrade. The Fermilab neutrino program planning is contextualized in terms of the recent P5 report, as well as ongoing discussions on future flavor and collider programs.

43 PARTICLE ACCELERATORS↗

Study on utilization of advanced composites in commercial aircraft wing structures. Volume 1: Executive summary

The effort required by commercial transport manufacturers to accomplish the transition from current construction materials and practices to extensive use of composites in aircraft wings was investigated. The engineering and manufacturing disciplines which normally participate in the design, development, and production of an aircraft were employed to ensure that all of the factors that would enter a decision to commit to production of a composite wing structure were addressed. A conceptual design of an advanced technology reduced energy aircraft provided the framework for identifying and investigating unique design aspects. A plan development effort defined the essential technology needs and formulated approaches for effecting the required wing development. The wing development program plans, resource needs, and recommendations are summarized.

Sakata, I. F.↗

NASA FY 2000 Accountability Report

This Accountability Report consolidates reports required by various statutes and summarizes NASA's program accomplishments and its stewardship over budget and financial resources. It is a culmination of NASA's management process, which begins with mission definition and program planning, continues with the formulation and justification of budgets for the President and Congress, and ends with scientific and engineering program accomplishments. The report covers activities from October 1, 1999, through September 30, 2000. Achievements are highlighted in the Statement of the Administrator and summarized in the Report.

Source record↗

Space Shuttle Program Orbiter Approach and Landing Test

The orbiter approach and landing test (ALT) reports are published to provide senior NASA management with timely information on ALT program plans and accomplishments. The ALT reports will be comprised of this pre-ALT report, ALT pre-flight memoranda, and an ALT post-flight report following each flight. The purpose of this pre-ALT report is to provide an overview of the ALT program, describing the flight vehicles involved and summarizing the planned flights.

Source record↗