Operational abort plan for the Apollo 8 mission. Project Apollo
Operational abort plan for Apollo 8 flight with computerized simulation
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Operational abort plan for Apollo 8 flight with computerized simulation
Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.
Graphical evaluation and review technique for research and development planning process
The National Aeronautics and Space Administration (NASA) Global Hawk Project became operational in 2009 and began support of Earth science in 2010. Thus far, the NASA Global Hawk has completed three Earth science campaigns and preparations are under way for two extensive multi-year campaigns. One of the most desired performance capabilities of the Global Hawk aircraft is very long endurance: the Global Hawk aircraft can remain airborne longer than almost all other jet-powered aircraft currently flying, and longer than all other aircraft available for airborne science use. This paper describes the NASA Global Hawk system, payload accommodations, concept of operations, and the scientific data-gathering campaigns.
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
Perspective projections of cockpit displays of traffic information (CDTI) on CRTs to present vertical separation information to airline pilots were examined. The perspective projection was compared with plan view projections of the same air traffic situations. Comparison of the pilots' avoidance maneuvers made when using the perspective display with those made while using more the conventional plan view display showed that pilots maneuvered somewhat earlier with perspective displays. With the perspective display, they maneuvered more frequently in the vertical dimension. The bias to maneuver horizontally probably reflected the poorer presentation of vertical separation on previously used plan view traffic displays. The avoidance decisions made by pilots using both perspective and plan view displays shows fewer unsuccessful maneuvers and fewer maneuvers producing spacing violations with the perspective format.
The plan to get all the National Advisory Committee on Aeronautics (NACA) collection online, with quality records, led to the NACA Documents Data base Project. The project has a two fold purpose: (1) to develop the definitive bibliography of NACA produced and/or held documents; and (2) to make that bibliography and the associated documents available to the aerospace community. This study supports the first objective by providing an analysis of the NACA collection and its bibliographic records, and supports the second objective by defining the NACA archive and recommending methodologies for meeting the project objectives.
Mission planning for manned, circular, synchronous orbit missions
Technical review of Voyager spacecraft design and project implementation plans
This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.
This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.
This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.
Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.
Mission planning, astronaut training and hardware requirements for Gemini and Apollo manned spacecraft
Phase 5 of the Deepwater Methane Hydrate Characterization and Scientific Assessment research project (DOE Award No. DE-FE0023919) occurred from Oct. 1, 2020 to Nov. 15, 2023. Throughout Phase 5, UT performed all aspects of project management and planning according to the award, project management plan, and statement of project objectives (Task 1). UT maintained and augmented the capability to transport, store, manipulate and analyze pressure cores (Task 13). UT’s hydrate core effective stress chamber can now run tests at effective stresses up to 20 MPa. A benchmark study was conducted and confirmed that the K0 permeameter accurately estimates geomechanical and petrophysical properties of geomaterials under uniaxial strain conditions. UT continued to analyze remaining UT-GOM2-1 pressure cores from GC955 (Task 10).
Status and plans for GPCP are presented along with scientific findings from the current data set. Global and large regional rainfall variations and possible long-term changes are examined using the 26-year (1979-2004) monthly dataset from the Global Precipitation Climatology Project (GPCP). One emphasis is to discriminate among the variations due to ENSO, volcanic events and possible long-term changes. Although the global change of precipitation in the data set is near zero, the data set does indicate an upward trend (0.13 mm/day/25yr) and a downward trend (-0.06 mm/day/25yr) over tropical oceans and lands (25S-25N), respectively. This corresponds to a 4% increase (ocean) and 2% decrease (land) during this time period. Simple techniques are derived to attempt to eliminate variations due to ENSO and major volcanic eruptions in the Tropics. Using only annual values two "volcano years" are determined by examining ocean-land coupled variations in precipitation related to ENSO and other phenomena. The outlier years coincide with Pinatubo and El Chicon eruptions. The ENSO signal is reduced by deriving mean ocean and land values for El Nino, La Nina and neutral conditions based on Nino 3.4 SST and normalizing the annual ocean and land precipitation to the neutral set of cases. The impact of the two major volcanic eruptions over the past 25 years is estimated to be about a 5% reduction in tropical rainfall. The modified data set (with ENSO and volcano effect at least partially removed) retains the same approximate linear change slopes over the data set period, but with reduced variance leading to significance tests with results in the 90-95% range. Intercomparisons between the GPCP, SSM/I (1988-2004), and TRMM (1998-2004) satellite rainfall products and alternate gauge analyses over land are made to attempt to increase or decrease confidence in the changes seen in the GPCP analysis.
Mission planning and spacecraft design criteria for interplanetary space flight
Regional planning agencies are currently expressing a need for detailed land cover/use information to effectively meet the requirements of various federal programs. Individual data sources have advantages and limitations in fulfilling this need, both in terms of time/cost and technological capability. A methodology has been developed to merge land cover/use data from LANDSAT, aerial photography and map sources to maximize the effective use of a variety of data sources in the provision of an integrated information system for regional analysis. A test of the proposed inventory method is currently under way in four central Michigan townships. This test will evaluate the compatibility, accuracy and cost of the integrated method with reference to inventories developed from a single data source, and determine both the technological feasibility and analytical potential of such a system.