Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Real-Time Dispatcher for a Distributed Energy Resource Power Plant to Provide Grid Services [SWR-25-17]

This software dispatches the aggregated power of a distributed energy resource (DER) plant located on an electrical distribution network. It is designed to provide the following services to the grid in real-time: (i) voltage support of the distribution network, (ii) virtual power plant at the substation with power factor support, and (iii) operating reserves for automatic generator control for the transmission system. This dispatcher integrates with the local power plant controller and utilizes the battery energy storage system (BESS) to smooth the volatile net power output from the DERs. It can also integrate with a day-ahead scheduler to strategically charge and discharge.

Comden, Joshua [National Renewable Energy Laborato↗

VC3: Virtual Clusters for Community Computation

A traditional HPC computing facility provides a large amount of computing power but has a fixed environment designed to satisfy local needs. This makes it very challenging for users to deploy complex applications that span multiple sites and require specific application software, scheduling middleware, or sharing policies. This project addressed many of these challenges by making it possible for researchers to easily aggregate and share resources, install custom software environments, and deploy clustering frameworks across multiple HPC facilities through the concept of “virtual clusters”. We designed and implemented a prototype virtual cluster facility that enabled unprivileged users to create dynamic aggregations of computing power across multiple sites, deployed with custom middleware and complex software dependencies. This service is hosted at the University of Chicago and available through the site virtualclusters.org.

97 MATHEMATICS AND COMPUTING↗

Recent Improvements In Interface Management For Hanfords Waste Treatment And Immobilization Plant - 13263

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the Waste Treatment and Immobilization Plant (WTP). The RPP mission is to store, retrieve and treat Hanford's tank waste; store and dispose of treated wastes; and close the tank farm waste management areas and treatment facilities by 2047. The WTP is currently being designed and constructed by Bechtel National Inc. (BNI) for DOE-ORP. BNI relies on a number oftechnical services from other Hanford contractors for WTP's construction and commissioning. These same services will be required of the future WTP operations contractor. The WTP interface management process has recently been improved through changes in organization and technical issue management documented in an Interface Management Plan. Ten of the thirteen active WTP Interface Control Documents (ICDs) have been revised in 2012 using the improved process with the remaining three in progress. The value of the process improvements is reflected by the ability to issue these documents on schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emulation and detection of physical faults and cyber-attacks on building energy systems through real-time hardware-in-the-loop experiments

The increasing use of remote or mobile access, integrated wearable technologies, data exchange, and cloud-based data analytics in modern smart buildings is steering the building industry towards open communication technologies. The increased connectivity and accessibility could lead to more cyber-attacks in smart buildings. On the other hand, physical faults (e.g., HVAC -heating, ventilation, and air-conditioning faults) may have similar adverse impacts as those from the cyber-attacks on building energy systems, such as occupant discomfort, energy wastage, and equipment downtime. However, current physical behavior-based anomaly detection methods fail to differentiate between cyber-attacks and physical faults in building energy systems. Moreover, the challenge in collecting real-world threat data with ground truth has led researchers to rely on numerical models with user-defined assumptions, which may not accurately reflect real-world conditions due to the lack of in-situ experimental datasets. To address these challenges and gaps, this paper presents a flexible hardware-in-the-loop (HIL) testbed for generating cyber-attack and physical fault datasets and demonstrating threat detection algorithms in a real building automation system (BAS) environment. This testbed combines hardware (i.e., real BAS with local HVAC controllers and a physical network) with software (i.e., high-fidelity models to represent behaviors of building envelope and HVAC energy systems), enabling emulations of realistic threats. Five HIL experiments, including one baseline without any threats, two with physical faults, and two with cyber-attacks, were conducted to generate datasets containing detailed network traffic and system states. A joint classification framework, incorporating a network analyzer and a physical HVAC fault detector, was proposed to automatically detect cyber-physical abnormalities on BAS at both the network and the physical HVAC levels. The network analyzer comprises a conditional random fields (CRF) based command validator and a statistics-based detection strategy. The fault detector employs a weather and schedule-based pattern matching and feature-based principal component analysis (WPM-FPCA) method. Evaluation of the classification using four metrics from the multi-class confusion matrix revealed an average accuracy of 90.2%, recall of 89.7%, precision of 88.5% and F1-score of 89.2%. Finally, these results demonstrate that the proposed joint classification framework can effectively differentiate between specific types of cyber-attacks (e.g., device reinitialization attack, network Denial-of-Service attack) and physical faults (e.g., air handling unit operational fault, cooling coil valve stuck) in real time for improved building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hanford Double Shell Tank Integrity Inspection - Integration of Customized Robotics - 18400

28 steel, double-shell, million gallon waste storage tanks located at the Hanford site in Washington State store both radioactive and hazardous waste. To monitor their condition and ensure continued viability, these tanks are inspected periodically through a comprehensive integrity program. In 2012, the first leak in a double-shell tank at Hanford was discovered in the 241-AY tank farm (Tank AY-102) and the failure was observed to be from the primary tank bottom. However, the exact failure location and damage mechanism have not been determined. A decision was made to pursue the capability to inspect the primary tank bottom region in order to provide additional tank integrity information. This work is particularly challenging due to the confined space in the double-shell tank annulus region (i.e. the 30 inch space between the primary and secondary tank shells), the limited dimensions of the tank risers that provide access to the annulus space (risers as small as 10 inches in diameter), and also the very small dimensions of the air channels in the concrete refractory pad that the primary waste storage tank rests on (channels are approximately two inches in diameter). Veolia Nuclear Solutions, along with Key Subcontractor Inuktun, were contracted to provide the capability to conduct these tank inspections in support of Hanford's double-shell tank integrity program. The Veolia Nuclear Solutions /Inuktun team designed, built, tested and delivered a tethered miniature robotic crawler system that utilizes the marsupial approach - a larger deployment crawler positions a smaller inspection crawler. The deployment crawler is installed via the tank riser, is magnetically coupled to the side of the tank shell, and drives to the selected deployment location at the end of one of the refractory channels where the small inspection robot is subsequently deployed. Operation of the equipment is controlled from a trailer outside the tank farm (a distance of several hundred feet). The system design includes a custom mechanism that provides for positioning and cable handling as well as the controls interface (laptop connected via control cables). The solution leveraged the Veolia Nuclear Solutions/Inuktun team's experience with delivering similar modular systems for other US and international sites. This simple but innovative solution delivered on an accelerated project schedule underlines the ability to provide effective robotic solutions to the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Approach to Better Understanding Integration Costs

This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance. There is currently a premium on processing and storage space in the radioactive liquid waste tank system. To enable continuation of risk reduction initiatives, the Plan establishes a processing strategy that provides tank space required to meet, or minimizes the impacts to meeting, programmatic objectives. The Plan also addresses perturbations in funding and schedule impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of activation products and resulting decommissioning implications for the Varian TruBeam linear accelerator - Paper 52

Modern medical linear accelerators used for the treatment of cancers are capable of operating at electron energies as high as 20 MeV. Above electron energies of 6 MeV, a measurable dose rate is obtained at the isocenter after beam termination. This is attributed to the activation of linear accelerator components through photonuclear reactions and neutron capture. Photons are produced as Bremsstrahlung during the collision of high-energy electrons with a heavy metal target, typically comprised of copper or tungsten. When photons exceeding the nucleon binding energy interact with a nucleus, neutrons are ejected. In the process of neutron capture, neutrons produced through ({gamma}, n) reactions are absorbed by a nucleus and the excess energy is emitted as a photon. Over the lifetime of an accelerator many components, such as the target, flattening filter, collimators, jaws, and treatment couch, are activated through these interactions. Although dependent on operating conditions, linear accelerators have an expected lifetime of 7 to 10 years. In Canada, at the end of their service, accelerators are typically sold for scrap, returned to a remanufacturing enterprise, or if the machine is still operational it can be retasked for continued use. Since many of the accelerator components have been exposed to a neutron fluence and activated to various extents, the requirements of the Canadian Nuclear Substance and Radiation Device regulations apply prior to final removal from the hospital. For shipments to the USA, there are exemption regulations to be considered. NRC regulation 10CFR 30.71 Schedule B lists a number of common radionuclides and the specific exemption quantity. Below these levels, radioactive materials may be freely transported from Canada to the USA without prior licensing from the Canadian Nuclear Safety Commission (CNSC) or United States Nuclear Regulatory Commission (NRC). (authors)

43 PARTICLE ACCELERATORS↗

Plutonium-238 Loadout Calorimeter Return To Service

The calorimeter in the transfer area in Building 7920 at the US Department of Energy’s Oak Ridge National Laboratory is used to measure the amount of 238 Pu in the Plutonium Heat Source Oxide. The calorimetry measurement is taken after the oxide is packaged in an ORISC (Oak Ridge Inner Shipping Capsule)/FSO (Fuel Storage Outer) assembly before loading into the Containment Vessel and shipping container. The equipment is used in three specific configurations: zero measurement (nothing in the sample cup), FSO measurement (actual measurement of 238 Pu), and reference calibration measurement (using the reference FSO as a known heat source). System checks were performed in July 2023 in preparation for scheduled material loadout. During these checks, personnel discovered that the reference FSO had experienced an electrical short in the heater cable and was no longer functional. The calorimeter was in the reference calibration measurement configuration at this time. Facility management was notified when the damage was discovered. The data from the Yokogawa recorder were pulled and analyzed for a span of time between September 2022 and July 2023. An unusual spike was found in the sample cup temperature data that started on October 19, 2022, and ended on October 20, 2022. The sample cup reached a temperature of 191.1°C. The maximum allowable temperature for the calorimeter thermopile to reach is 220°C based on the manufacturer statement provided in Appendix B of this report [1]. The calorimeter thermopile and the sample cup thermocouple are physically close to each other; therefore, the data suggest that the calorimeter itself never saw a temperature in excess of 191.1°C. Physical damage present on the cable, tape, and insulation suggests that the temperature reached a higher value in some locations within the sample cup than the data shows. Because of this discrepancy, testing of the calorimeter was required to confirm that the calorimeter is functioning the same as it was before the electrical short. The intent of this report is to assess the functionality of the calorimeter and determine if it is acceptable to use for 238 Pu loadout material measurement. Testing showed that the calorimeter is functionally equivalent to the initial calibration that was performed in the summer of 2021, and thus, the calorimeter was cleared to be used for its intended purposes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Augmenting Trust Establishment in Dynamic Systems with Social Networks

Social networking has recently flourished in popularity through the use of social websites. Pervasive computing resources have allowed people stay well-connected to each other through access to social networking resources. We take the position that utilizing information produced by relationships within social networks can assist in the establishment of trust for other pervasive computing applications. Furthermore, we describe how such a system can augment a sensor infrastructure used for event observation with information from mobile sensors (ie, mobile phones with cameras) controlled by potentially untrusted third parties. Pervasive computing systems are invisible systems, oriented around the user. As a result, many future pervasive systems are likely to include a social aspect to the system. The social communities that are developed in these systems can augment existing trust mechanisms with information about pre-trusted entities or entities to initially consider when beginning to establish trust. An example of such a system is the Collaborative Virtual Observation (CoVO) system fuses sensor information from disaparate sources in soft real-time to recreate a scene that provides observation of an event that has recently transpired. To accomplish this, CoVO must efficently access services whilst protecting the data from corruption from unknown remote nodes. CoVO combines dynamic service composition with virtual observation to utilize existing infrastructure with third party services available in the environment. Since these services are not under the control of the system, they may be unreliable or malicious. When an event of interest occurs, the given infrastructure (bus cameras, etc.) may not sufficiently cover the necessary information (be it in space, time, or sensor type). To enhance observation of the event, infrastructure is augmented with information from sensors in the environment that the infrastructure does not control. These sensors may be unreliable, uncooperative, or even malicious. Additionally, to execute queries in soft real-time, processing must be distributed to available systems in the environment. We propose to use information from social networks to satisfy these requirements. In this paper, we present our position that knowledge gained from social activities can be used to augment trust mechanisms in pervasive computing. The system uses social behavior of nodes to predict a subset that it wants to query for information. In this context, social behavior such as transit patterns and schedules (which can be used to determine if a queried node is likely to be reliable) or known relationships, such as a phone's address book, that can be used to determine networks of nodes that may also be able to assist in retrieving information. Neither implicit nor explicit relationships necessarily imply that the user trusts an entity, but rather will provide a starting place for establishing trust. The proposed framework utilizes social network information to assist in trust establishment when third-party sensors are used for sensing events.

97 MATHEMATICS AND COMPUTING↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

Optimizing vehicle recharging to maximize use of energy generated from particular identified sources

Implementations of the present invention contemplate utilizing a communicative infrastructure represented by a telematics unit of an electric vehicle and a telematics service provider (TSP) communicatively coupled to the telematics unit to control an amount of power reserved for a charging event of the vehicle. Specifically, the TSP utilizes information provided by the telematics unit, electrical power utilities, and electrical power metering devices to determine the characteristics of electrical energy available for charging the vehicle. The TSP can utilize the characteristics of the available energy along with additional information, such as charging preferences established by a subscriber of the TSP and vehicle use schedules, to determine an amount of power to reserve for the charging event. The amount of power reserved for the charging event may be determined based on cost, greenhouse gas emissions, a combination thereof, and on other factors.

33 ADVANCED PROPULSION SYSTEMS↗

Design and Characterization of the Engineering Model of the Spectrometer Onboard LuSEE‐Night

Abstract The Lunar Surface Electromagnetics Explorer—Night, LuSEE‐Night, is a low‐frequency radio astronomy experiment that will explore the cosmic Dark Ages signal on the radio‐quiet farside of the Moon. The LuSEE‐Night carries a radio frequency spectrometer consisting of a set of antennas, analog and digital processing electronics, and will be launched by NASA's Commercial Lunar Payload Services in 2025. The spectrometer is designed to observe the spectrum of the radio sky in the 0.5−50 MHz band. The engineering model (EM) of the four‐channel spectrometer has been developed. The EM has been characterized for linearity, gain, noise, and their temperature dependence, confirming that the EM meets all the requirements for LuSEE‐Night. Three mitigation techniques have been implemented and verified to suppress self‐induced electromagnetic interference. The flight model of the spectrometer is currently being developed and is scheduled to be shipped to the integration site in early 2024.

Tamura, Emi↗

How Many Trip Requests Could We Support? An Activity-Travel Based Vehicle Scheduling Approach

In a world of ever-changing travel behavior and ever-increasing modal options, is vital to have integrated models that could capture the interactions between supply and demand layers of travel. Addressing this need, we propose three different versions of network representation and mathematical models for the activity-based vehicle routing problem to connect activity-travel graphs of passengers (demand layer) to spatio-temporal networks of vehicles (supply layer). Versions I and II are arc-based, while version III is path-based. In version I, we introduce the concept of activity-travel graphs for passengers. For vehicles, we construct space–time networks and add a new dimension, called “under-service state”, to track the execution status of trip requests at any location and time. In version II, we reduce the complexity of the network structure by eliminating the state dimension and some other modifications in the structure of the passengers’ and vehicles’ network. Although both versions can capture various behavioral constraints of the activity-based vehicle routing problem (e.g., mandatory and optimal activities, duration of activities, chain of activities, preferred starting and ending times of activities), due to the high level of complexity of the network structure, both versions can only solve small-sized problems. To tackle the computational complexity, we propose a path-based network representation in version III, and to make a balance between the disutility of passengers and vehicles, we present a tolled user equilibrium problem. Mathematical models are coded in C and GAMS and implemented on real-world Phoenix regional transportation network with more than 39 million trip requests, which demonstrate the effectiveness of the proposed solution for the original and restricted master problems.

33 ADVANCED PROPULSION SYSTEMS↗

NDE Technology Engineering Program for Hanford DST Non-Visual Volumetric Inspection Technology: Phase II RAVIS Radiation Tolerance Test Report

This test report provides the results of radiation tolerance robustness testing that was performed on samples of robotic components and an ultrasonic guided wave air-slot sensor that represent components/sub-systems of the Robotic Air-slot Volumetric Inspection System (RAVIS) that has been engineered for volumetric inspection of Hanford tank bottom plates via under-tank refractory pad air-slots. The specific components tested for 1) functionality during active irradiation and 2) tolerance to cumulative radiation dose (until failure or upon reaching a cumulative dose test limit) were: • four samples each of a printed circuit board (PCB) and direct current (DC) motor, which are robotic components, and • 26 ultrasonic piezoelectric elements (samples) inside an air-slot sensor. The robotic components are part of the RAVIS air-slot inspection crawler drive control system that is responsible for remote communication with and actuation of the air-slot inspection crawler. The failure of either of these components during under-tank deployment would require manual retrieval via the crawler’s tether, which risks damage to the robot/refractory/tank. Preemptive replacement of the components at appropriately conservative dose/time intervals informed by failure dose would reduce the likelihood of under-tank failure. The components were included in radiation tolerance testing to quantify their failure doses to inform replacement intervals. The air-slot sensor is responsible for collecting ultrasonic inspection data (scan images) for the tank bottom plates during under-tank deployment. Compromised signal quality due to elevated noise levels caused by gamma radiation would compromise inspection performance. The air-slot sensor was included in radiation tolerance testing to quantify the impact of active irradiation on sensor signal quality. The irradiation and in-situ functional tests of the PCBs, DC motors and air-slot sensor took place in June and July 2020 at the Pacific Northwest National Laboratory. Testing was performed at a gamma dose rate near 300 rad/hr., which, in the absence of under-tank dose rate data, has been conservatively estimated to be the upper-bound dose rate beneath the primary tanks at Hanford. Irradiation took place at elevated temperatures of 150-200°F to determine failure doses that reflect the compounding effects of gamma radiation and heat. The test results revealed: • The DC motors can tolerate being actively irradiated at the high dose rate at 200°F and can tolerate a cumulative dose of 300,000 rad, that which would be incurred after 5 years of service at the 300 rad/hr dose rate. The component therefore meets minimum and preferred radiation tolerance and lifecycle requirements for robotic components. • The air-slot sensor can tolerate being actively irradiated at the high dose rate at 150°F and can tolerate a cumulative dose of 60,000 rad, that which would be incurred after 1 year of service at the 300 rad/hr dose rate. The sensor therefore meets minimum radiation tolerance and lifecycle requirements. • The PCB can tolerate being actively irradiated at the high dose rate, but can only tolerate a cumulative dose of 19,000 rad at 150-200°F. The PCB does not meet minimum radiation tolerance and lifecycle requirements; however, because the component is considered replaceable, it can be replaced before a cumulative dose of 19,000 rad is reached, determined through either monitoring with a dosimeter or scheduled time intervals that are calculated based on conservative estimates of under-tank dose rates.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Real-time Ridesharing for Transportation Hubs with Demand and Supply Uncertainty

Transportation hubs in major cities generate a significant amount of trips by taxis and for-hail vehicles (FHV), with many of the trips sharing similar destinations. This suggests promising opportunities to leverage the collective travel needs with dedicated ridesharing solutions to reduce the externalities of excessive traffic at transportation hubs. In this study, we develop a novel dynamic ridesharing approach to serve trips from the transportation hub by considering (1) demand (new passengers) and supply (newly available vehicles) in the near future and (2) the uncertainty of future predictions. Our approach consists of two stages. In the first stage, we develop a data structure called hub mobility tree to generate potential combinations of shareable trips as candidate schedules efficiently. Then the generated schedules are used in the second stage to formulate the stochastic hub-based ridesharing problem (SHRP), which is a stochastic integer programming problem with the objective to maximize the total expected ridesharing profit over time. Due to the prohibitive number of shareable trips, we then approximately solve SHRP by the sample average approximate method (SAA), and a dual Lagrangian technique is implemented to further improve the scalability of the solution approach. We demonstrate the performances of the proposed method by simulating the ridesharing service at JFK airport using NYC taxi and FHV data. The results indicate that the proposed method outperforms the myopic ridesharing (maximize profit for a single time step) and the rolling horizon method with point estimation of future demand and supply.

dynamic ridesharing↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗