Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

High-Density Automated Vertiport Concept of Operations

The National Aeronautics and Space Administration (NASA) vision for Advanced Air Mobility (AAM) includes Urban Air Mobility (UAM) – a concept involving vertical takeoff and landing (VTOL) aircraft, decentralized (or federated) traffic management, and new infrastructure to support urban, suburban, and rural flight operations. High-density performance-based routes or corridors enable prompt transportation of people and goods from node to node, where each node represents a vertiport, defined as an identifiable ground or elevated area used for the takeoff and landing of VTOL aircraft. In the presence of uncertainty surrounding aircraft turnaround time on the ground, vertiports are the critical end points in scheduling, sequencing, and spacing (SSS) of aircraft in dense metropolitan environments. This Concept of Operations (ConOps) includes vertiports of varying sizes, configurations, service offerings, and locations. UAM air vehicles include conventional rotorcraft, unmanned VTOL aircraft, and novel piloted VTOL aircraft. This ConOps focuses on operations at a high-density vertiport, supported by a Vertiport Automation System (VAS) with high-throughput operation capabilities under conditions defined as NASA’s Urban Air Mobility Maturity Level Four (UML-4).

UAM↗

High-Density Automated Vertiport Concept of Operations

The National Aeronautics and Space Administration (NASA) vision for Advanced Air Mobility (AAM) includes Urban Air Mobility (UAM) – a concept involving vertical takeoff and landing (VTOL) aircraft, decentralized (or federated) traffic management, and new infrastructure to support urban, suburban, and rural flight operations. High-density performance-based routes or corridors enable prompt transportation of people and goods from node to node, where each node represents a vertiport, defined as an identifiable ground or elevated area used for the takeoff and landing of VTOL aircraft. In the presence of uncertainty surrounding aircraft turnaround time on the ground, vertiports are the critical end points in scheduling, sequencing, and spacing (SSS) of aircraft in dense metropolitan environments. This Concept of Operations (ConOps) includes vertiports of varying sizes, configurations, service offerings, and locations. UAM air vehicles include conventional rotorcraft, unmanned VTOL aircraft, and novel piloted VTOL aircraft. This ConOps focuses on operations at a high-density vertiport, supported by a Vertiport Automation System (VAS) with high-throughput operation capabilities under conditions defined as NASA’s Urban Air Mobility Maturity Level Four (UML-4).

Urban Air Mobility↗

Biotechnology Facility: An ISS Microgravity Research Facility

The International Space Station (ISS) will support several facilities dedicated to scientific research. One such facility, the Biotechnology Facility (BTF), is sponsored by the Microgravity Sciences and Applications Division (MSAD) and developed at NASA's Johnson Space Center. The BTF is scheduled for delivery to the ISS via Space Shuttle in April 2005. The purpose of the BTF is to provide: (1) the support structure and integration capabilities for the individual modules in which biotechnology experiments will be performed, (2) the capability for human-tended, repetitive, long-duration biotechnology experiments, and (3) opportunities to perform repetitive experiments in a short period by allowing continuous access to microgravity. The MSAD has identified cell culture and tissue engineering, protein crystal growth, and fundamentals of biotechnology as areas that contain promising opportunities for significant advancements through low-gravity experiments. The focus of this coordinated ground- and space-based research program is the use of the low-gravity environment of space to conduct fundamental investigations leading to major advances in the understanding of basic and applied biotechnology. Results from planned investigations can be used in applications ranging from rational drug design and testing, cancer diagnosis and treatments and tissue engineering leading to replacement tissues.

Gonda, Steve R.↗

Space time neural networks for tether operations in space

A space shuttle flight scheduled for 1992 will attempt to prove the feasibility of operating tethered payloads in earth orbit. due to the interaction between the Earth's magnetic field and current pulsing through the tether, the tethered system may exhibit a circular transverse oscillation referred to as the 'skiprope' phenomenon. Effective damping of skiprope motion depends on rapid and accurate detection of skiprope magnitude and phase. Because of non-linear dynamic coupling, the satellite attitude behavior has characteristic oscillations during the skiprope motion. Since the satellite attitude motion has many other perturbations, the relationship between the skiprope parameters and attitude time history is very involved and non-linear. We propose a Space-Time Neural Network implementation for filtering satellite rate gyro data to rapidly detect and predict skiprope magnitude and phase. Training and testing of the skiprope detection system will be performed using a validated Orbital Operations Simulator and Space-Time Neural Network software developed in the Software Technology Branch at NASA's Lyndon B. Johnson Space Center.

Lea, Robert N.↗

Interferometers Sharpen Measurements for Better Telescopes

Over the last decade, there have been a number of innovations that have made possible the largest and most powerful telescope of its time: the James Webb Space Telescope (JWST). Scheduled to launch in 2018, JWST will provide insight into what the oldest, most distant galaxies look like. When engineers build a first-of-its-kind instrument like the JWST, they often must make new tools to construct the new technology. Throughout the decades of planning, development, and construction of the JWST, NASA has worked with numerous partners to spur innovations that have enabled the telescope s creation. Though the JWST s launch date is still several years away, a number of these innovations are spinning off to provide benefits here on Earth. One of these spinoffs has emerged from the extensive testing the JWST must undergo to ensure it will function in the extreme environment of space. In order to test the JWST instruments in conditions that closely resemble those in space, NASA uses a cryogenic vacuum chamber. By dropping the temperatures down to -400 F and employing powerful pumps to remove air from the chamber, engineers can test whether the JWST instruments will function once the spacecraft leaves Earth. Traditionally, a phase-shifting interferometer is used to measure optics like the JWST s mirrors to verify their precise shape, down to tens of nanometers, during manufacturing. However, the large size of the mirrors, coupled with vibration induced by the cryo-pumps, prohibits the use of traditional phase-shifting interferometers to measure the mirrors within the chamber environment. Because the JWST will be located in deep space, far from any possible manned service mission, it was essential to find a robust solution to guarantee the performance of the mirrors.

Source record↗

A tow concept for the space shuttle orbiter approach and landing test

The tow concept provides the means for evaluating the orbiter aerodynamic performance and handling qualities in the same configuration as expected in actual space shuttle flight operation. A Boeing 747-100 aircraft has engine-out capability to tow the orbiter to an altitude that permits a safe orbiter approach and landing. The tow concept also provides a means for conducting a comprehensive ground test program before proceeding into the actual ALT flight operations. The implementation of the tow concept requires only a minor structural modification in the nose section of the orbiter vehicle; requires minor modifications in the 747 cargo bay; and makes use of those orbiter onboard systems installed in the ALT orbiter vehicle. The 747 wake turbulence does not constitute a problem for the orbiter during take-off or climb to altitude. The impact that the tow concept would have on the cost and schedule of the space shuttle program was not evaluated in this study.

Bonner, T. F., Jr.↗

Using Common Graphics Paradigms Implemented in a Java Applet to Represent Complex Scheduling Requirements

The experiments planned for the International Space Station promise to be complex, lengthy and diverse. The scarcity of the space station resources will cause significant competition for resources between experiments. The scheduling job facing the Space Station mission planning software requires a concise and comprehensive description of the experiments' requirements (to ensure a valid schedule) and a good description of the experiments' flexibility (to effectively utilize available resources). In addition, the continuous operation of the station, the wide geographic dispersion of station users, and the budgetary pressure to reduce operations manpower make a low-cost solution mandatory. A graphical representation of the scheduling requirements for station payloads implemented via an Internet-based application promises to be an elegant solution that addresses all of these issues. The graphical representation of experiment requirements permits a station user to describe his experiment by defining "activities" and "sequences of activities". Activities define the resource requirements (with alternatives) and other quantitative constraints of tasks to be performed. Activities definitions use an "outline" graphics paradigm. Sequences define the time relationships between activities. Sequences may also define time relationships with activities of other payloads or space station systems. Sequences of activities are described by a "network" graphics paradigm. The bulk of this paper will describe the graphical approach to representing requirements and provide examples that show the ease and clarity with which complex requirements can be represented. A Java applet, to run in a web browser, is being developed to support the graphical representation of payload scheduling requirements. Implementing the entry and editing of requirements via the web solves the problems introduced by the geographic dispersion of users. Reducing manpower is accomplished by developing a concise representation which eliminates the misunderstanding possible with verbose representations and which captures the complete requirements and flexibility of the experiments.

Jaap, John↗

Solid-State Compressor for Space Station Oxygen Recovery

At present, the life support system on the International Space Station Alpha vents overboard the carbon dioxide (CO2) produced by the crew members. Recovering the oxygen contained in the CO2 has the potential to reduce resupply mass by 2000 pounds per year or more, a significant weight that could be used for experimental payloads and other valuable items. The technologies used to remove CO2 from the air and to recover O2 from CO2 are flight-ready; however, the interface between the devices is a problem for the Space Station system. Ames Research Center has developed a new technology that solves the interface issue, possibly allowing closure of the oxygen loop in a spacecraft for the first time. CO2 produced by the crew is removed in the Carbon Dioxide Removal Assembly (CDRA). This device effectively produces a pure CO2 stream, but at a very low pressure. Elsewhere, the oxygen generation system which makes O2 by electrolyzing water produces a hydrogen stream. In principle the CO2 and H2 can react to form methane and water over a suitable catalyst. Water produced in this methane-formation reactor can be returned to the water electrolyzer, where the O2 can be returned to the cabin; however, the methane-formation reactor requires CO2 at a much higher pressure than that produced by the CDRA. Furthermore, the CO2 and H2 are often not available at the same time, due to power management and scheduling on the space station. In order to get the CO2 to the reactor at the right pressure and at the right time, a device or assembly that functions as a vacuum pump, compressor, and storage tank is required.

Finn, John E.↗

Using SCIAMACHY and Ground-based FTS Measurements to Test the OCO X(sub CO2) Retrieval and Validation Approach

Global, space-based observations of atmospheric CO2 with precision, resolution, and coverage needed to monitor sources and sinks: a) Spectra of reflected/scattered sunlight in NIR CO2 and O2 bands used to estimate X(sub CO2) with large sensitivity to surface; b) A-train orbit (1:15 PM polar sun sync); c) 16 day repeat cycle samples seasonal cycle on semi-monthly intervals; and d) NASA ESSP (Earth Space System Pathfinder) scheduled for Sept 2008 launch; 2 yrs lifetime. Initial comparison of SCIAMACHY and FTS retrievals for Park Falls: a) Positive bias in X(sub CO2) of approx. 10 ppm; and b) Negative bias in surface pressure After correction of spectral artifacts in O2A band: a) Largely improved agreement between SCIAMACHY and FTS X(sub CO2) (without clear bias) and in surface pressure; and b) Standard deviation of SCIAMACHY X(sub CO2 approx. 6 ppm. Good qualitative agreement with GEOS-CHEM, with GEOS-CHEM underestimating seasonal cycle. OCO is a dedicated CO2 instrument and will achieve much higher accuracy and precision: a) much higher spectral resolution (by factor of 20); and b) smaller ground pixels (by factor of 600).

CO2 measurements↗

NASA scheduling technologies

This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

Adair, Jerry R.↗

NASA management of the Space Shuttle Program

The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

Peters, F.↗

Summary of spacecraft technology, systems reliability, and tracking data acquisition

Goddard activities are reported for 1973. An eight-year flight schedule for projected space missions is presented. Data acquired by spacecraft in the following disciplines are described: stellar ultraviolet, stellar X-rays, stellar gamma rays, solar radiation, radio astronomy, particles/fields, magnetosphere, aurora, and the upper atmosphere.

Source record↗

Doppler measurements of the ionosphere on the occasion of the Apollo-Soyuz test project. Part 1: Computer simulation of ionospheric-induced Doppler shifts

A computer simulation of the ionospheric experiment of the Apollo-Soyuz Test Project (ASTP) was performed. ASTP is the first example of USA/USSR cooperation in space and is scheduled for summer 1975. The experiment consists of performing dual-frequency Doppler measurements (at 162 and 324 MHz) between the Apollo Command Service Module (CSM) and the ASTP Docking Module (DM), both orbiting at 221-km height and at a relative distance of 300 km. The computer simulation showed that, with the Doppler measurement resolution of approximately 3 mHz provided by the instrumentation (in 10-sec integration time), ionospheric-induced Doppler shifts will be measurable accurately at all times, with some rare exceptions occurring when the radio path crosses regions of minimum ionospheric density. The computer simulation evaluated the ability of the experiment to measure changes of columnar electron content between CSM and DM (from which horizontal gradients of electron density at 221-km height can be obtained) and to measure variations in DM-to-ground columnar content (from which an averaged columnar content and the electron density at the DM can be deduced, under some simplifying assumptions).

Grossi, M. D.↗

Beneficial uses of space

The study elicited over 100 ideas for Space Processing. Of the elicited ideas, more than 20% involved processing of biologicals, or related medical and life sciences applications. Among these were High Purity Separation of Isoenzymes, and Development of Biorhythms applications data. Program planning for four products is outlined. Experimentation and testing resulted in definition of nearly 70 series of tests in ground-based laboratories, sounding rockets, etc., and space shuttle. Development schedules established timing and interrelationships of decisions involved in carrying these products to the point of production. The potential profitability of the four products is determined. Resources needed to achieve full scale production included use of shuttle for transportation, for which cost apportionment model was developed. R and D resources for the four products totalled $46,000,000 with Isoenzymes requiring the smallest expenditure, $4,000,000. A computerized profitability model (INVEST) was used to determine the measures of profitability of each product. Results build confidence that there will be a payoff.

Bloom, H. L.↗

Pioneer Venus 1978 mission support

The Deep Space Network master schedule for the Pioneer Venus 1978 mission is updated. Current support status for the mission is described.

Miller, R. B.↗

Language for Allocation and Network Scheduling

Programing Language for Allocation and Network Scheduling, Plans, handles many scheduling requirements of Space Shuttle program. Also generalized, high-level tree manipulation language.

Willoughby, J. K.↗

Future ultraviolet observations from space

Astronomical facilities to observe from space in the ultraviolet are reviewed. For the immediate future, IUE and the extreme ultraviolet spectrometers of Voyager 1 and Voyager 2 are available for furthering knowledge of cataclysmic variables. The Hubble Space telescope is scheduled for launch in 1986 and will be available to guest observers. The Far Ultraviolet Spectroscopic Explorer, which is expected to provide the capability to observe in the far and extreme ultraviolet, is planned for launch in the 1990s.

Kondo, Y.↗