Vacuum-thermal environmental testing of the Nimbus I control system.
Vacuum thermal environmental testing of Nimbus I control system
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Vacuum thermal environmental testing of Nimbus I control system
Due to the unique thermal vacuum testing requirements for a Mars Rover instrument, NASA Goddard developed a low cost, high fidelity thermal control system utilizing Thermal Electric Coolers (TECs) combined with a heat rejection fluid loop to actively control 8 independent payload thermal boundary zones in a simulated Mars pressure vacuum chamber with a Carbon Dioxide atmosphere. These zones could control instrument components to a specific temperature as a function of time to simulate exact temporal flight boundary predictions.The Mars Organic Molecule Analyzer (MOMA) instrument is a dual source (pyrolysis gas chromatograph and laser desorption) mass spectrometer (MS) based package that detects and characterizes organic molecules, as part of ESA's 2020 ExoMars Rover mission to seek the signs of life on Mars.Due to the unique thermal vacuum testing requirements for a Mars Rover instrument, NASA Goddard developed a low cost, high fidelity thermal control system utilizing Thermal Electric Coolers (TECs) combined with a heat rejection fluid loop to actively control 8 independent payload thermal boundary zones in a simulated Mars pressure vacuum chamber with a Carbon Dioxide atmosphere. These zones could control instrument components to a specific temperature as a function of time to simulate exact temporal flight boundary predictions.The Mars Organic Molecule Analyzer (MOMA) instrument is a dual source (pyrolysis gas chromatograph and laser desorption) mass spectrometer (MS) based package that detects and characterizes organic molecules, as part of ESA's 2020 ExoMars Rover mission to seek the signs of life on Mars.
A double-chamber vacuum laminator was required to investigate the processing and control of the fabrication of large terrestrial photovoltaic modules, and economic problems arising therefrom. Major design considerations were low cost, process flexibility and the exploration of novel equipment approaches. Spherical end caps for industrial tanks were used for the vacuum chambers. A stepping programmer and adjustable timers were used for process flexibility. New processing options were obtained by use of vacuum sensors. The upper vacuum chamber was provided with a diaphragm support to reduce diaphragm stress. A counterweight was used for handling ease and safety. Heat was supplied by a large electrical strip heater. Thermal isolation and mechanical support were provided inexpensively by a bed of industrial marbles. Operational testing disclosed the need for a differential vacuum gauge and proportional valve. Reprogramming of the process control system was simple and quick.
This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.
Some scientific missions require to an extreme extent the absence of any on-board microvibration. Recent projects dedicated to measuring the Earth's gravity field and modeling the geoid with extremely high accuracy are examples. Their missions demand for extremely low micro-vibration environment on orbit for: (1) Not disturbing the measurement of earth gravity effects with the installed gradiometer or (2) Even not damaging the very high sensitive instruments. Based on evidence from ongoing missions multi-layer insulation (MLI) type thermal control blankets have been identified as a structural element of spacecrafts which might deform under temperature variations being caused by varying solar irradiation in orbit. Any such deformation exerts tiny forces which may cause small reactions resulting in micro-vibrations, in particular by exciting the spacecraft eigenmodes. The principle of the test set-up for the micro-vibration test was as follows. A real side wall panel of the spacecraft (size about 0.25 m2) was low-frequency suspended in a thermal vacuum chamber. On the one side of this panel, the MLI samples were fixed by using the standard methods. In front of the MLI, an IR-rig was installed which provided actively controlled IR-radiation power of about 6 kW/m2 in order to heat the MLI surface. The cooling was passive using the shroud temperature at a chamber pressure <1E-5mbar. The resulting micro-vibrations due to MLI motion in the heating and the cooling phase were measured via seismic accelerometers which were rigidly mounted to the panel. Video recording was used to correlate micro-vibration events to any visual MLI motion. Different MLI sample types were subjected to various thermal cycles in a temperature range between -60 C to +80 C. In this paper, the experience on these micro-vibration measurements will be presented and the conclusions for future applications will be discussed
The thermal resistance was experimentally determined of the bolted joints of the first Brazilian satellite (SCD 01). These joints, used to connect the satellite structural panels, are reproduced in an experimental apparatus, keeping, as much as possible, the actual dimensions and materials. A controlled amount of heat is forced to pass through the joint and the difference of temperature between the panels is measured. The tests are conducted in a vacuum chamber with liquid nitrogen cooled walls, that simulates the space environment. Experimental procedures are used to avoid much heat losses, which are carefully calculated. Important observations about the behavior of the joint thermal resistance with the variation of the mean temperature are made.
The Environmental Effects Branch (EM50) at the Marshall Space Flight Center has developed a unique capability within the agency, namely the Lunar Environment Test System (LETS). LETS is a cryo-pumped vacuum chamber facility capable of high vacuum (10-7 Torr). LETS is a cylindrical chamber, 30 in. (0.8 m) diameter by 48 in. (1.2 m) long thermally controlled vacuum system. The chamber is equipped with a full array of radiation sources including vacuum ultraviolet, electron, and proton radiation. The unique feature of LETS is that it contains a large lunar simulant bed (18 in. x 40 in. x 6 in.) holding 75 kg of JSC-1a simulant while operating at a vacuum of 10-7 Torr. This facility allows three applications: 1) to study the charging, levitation and migration of dust particles, 2) to simulate the radiation environment on the lunar surface, and 3) to electrically charge the lunar simulant enhancing the attraction and adhesion of dust particles to test articles more closely simulating the lunar surface dust environment. LETS has numerous diagnostic instruments including TREK electrostatic probes, residual gas analyzer (RGA), temperature controlled quartz crystal microbalance (TQCM), and particle imaging velocimeter (PIV). Finally, LETS uses continuous Labview data acquisition for computer monitoring and system control.
This paper describes the theoretical background and implementation methodology of using a thermoelectric converter (TEC) for operating temperature control of a loop heat pipe (LHP). In particular, experimental results from ambient and thermal vacuum tests of an LHP are presented for illustrations. The most commonly used state-of-the-art method to control the LHP operating temperature is to cold bias its compensation chamber (CC) and use an electrical heater to maintain the CC at the desired set point temperature. Although effective, this approach has its shortcomings in that the electrical heater can only provide heating to the CC, and the required power can be large under certain conditions. An alternative method is to use a TEC, which is capable of providing both heating and cooling to the CC. In this method, one side of the TEC is attached to the CC, and the other side is connected to the evaporator via a thermal strap. Using a bipolar power supply and a control algorithm, a TEC can function as a heater or a cooler, depending on the direction of the current flow. Extensive ground tests of several LHPs have demonstrated that a TEC can provide very tight temperature control for the CC. It also offers several additional advantages: (1) The LHP can operate at temperatures below its natural operating temperature at low heat loads; (2) The required heater power for a TEC is much less than that for an electrical heater; and (3) It enhances the LHP start-up success. Although the concept of using a TEC for LHP temperature control is simple, there are many factors to be considered in its implementation for space applications because the TEC is susceptible to the shear stress and yet has to sustain the dynamic load under the spacecraft launch environment. The added features that help the TEC to withstand the dynamic load will inevitably affect the TEC thermal performance. Some experiences and lessons learned are addressed in this paper.
The environmental heat flux routine version 4, (EHFR-4) is a generalized computer program which calculates the steady state and/or transient thermal environments experienced by a space system during lunar surface, deep space, or thermal vacuum chamber operation. The specific environments possible for EHFR analysis include: lunar plain, lunar crater, combined lunar plain and crater, lunar plain in the region of spacecraft surfaces, intervehicular, deep space in the region of spacecraft surfaces, and thermal vacuum chamber generation. The EHFR was used for Extra Vehicular Mobility Unit environment analysis of the Apollo 11-17 missions, EMU manned and unmanned thermal vacuum qualification testing, and EMU-LRV interface environmental analyses.
The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis conducted include: pneumatic analysis to calculate the WDD's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. Since LAVA is a scientific subsystem, the near-infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.
A document discusses a simulation chamber that represents a shift from the thermal-vacuum chamber stereotype. This innovation, currently in development, combines the capabilities of space simulation chambers, the user-friendliness of modern-day electronics, and the modularity of plug-and-play computing. The Mobile Chamber is a customized test chamber that can be deployed with great ease, and is capable of bringing payloads at temperatures down to 20 K, in high vacuum, and with the desired metrology instruments integrated to the systems control. Flexure plans to lease Mobile Chambers, making them affordable for smaller budgets and available to a larger customer base. A key feature of this design will be an Apple iPad-like user interface that allows someone with minimal training to control the environment inside the chamber, and to simulate the required extreme environments. The feedback of thermal, pressure, and other measurements is delivered in a 3D CAD model of the chamber's payload and support hardware. This GUI will provide the user with a better understanding of the payload than any existing thermal-vacuum system.
Temperature gradients in ceramic light water reactor (LWR) uranium dioxide (UO 2 ) nuclear fuel pellets generate thermal stresses that cause fractures in the fuel beginning early in the life of fresh fuel. The combination of heating due to fission and forced convective cooling on the exterior of LWR fuel rods generates a temperature profile that is difficult to replicate outside the reactor environment. In the present study, a state-of-the-art experimental set-up using electrical heating to replicate fission heating was built and surrogate fuel materials such as ceria (CeO 2 ) were used to validate the system. Cracking experiments were conducted on these surrogates by inducing reactivity-initiated-accident (RIA) like temperature gradients in the pellets via induction and direct resistance heating. Induction heating was done using copper coils and molybdenum susceptors which heated the surrogates to a threshold temperature that is sufficiently high for the fuel material to conduct current. Thereafter, direct resistance heating was used by a D.C. power supply to introduce volumetric heating to replicate LWR operating conditions analogous to fission heating. The pellets were held against nickel electrodes and mounted on a boron nitride test-stand. All the tests were carried out in a stainless-steel vacuum chamber. Simultaneous real-time dual imaging of the surrogate pellet surface has been implemented using an optical and infrared camera system which will be mounted along axial and perpendicular directions to the pellet surface respectively. A beam-splitter was used to split the incoming radiation from the sample into two halves. While one of the beams is transmitted from the splitter through a bandpass filter to obtain optical images, the other beam is reflected from the splitter to the thermal camera to capture full field temperature gradients of the as fabricated pellet surface during crack initiation and propagation. In the current series of tests, a 2-color pyrometer was used for recording and comparing the surface and centerline temperatures of the surrogate pellets in lieu of the thermal camera. A LabVIEW data acquisition system has been set up for collecting useful data during experiments.
The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.
The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.
The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.
The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.
The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.
A satellite X-ray test facility (SXTF) is planned for studying system generated electromagnetic pulse effects on full scale, operational spacecraft. The environment created by a distant, high altitude nuclear burst can be simulated using pulsed X-ray sources. The facility is to be installed in a thermal vacuum chamber with dimensions greater then 10 m diameter and 20 m height and equipped with solar simulators and equipment for simulating the charging environment of space. The spacecraft charging system consists of several low energy electron and hydrogen ion sources (5-25 keV), one or two medium energy electron accelerators (150-300 keV), an array of vacuum ultraviolet lamps, and geomagnetic field suppression coils. Military, scientific, and commercial spacecraft can be tested before launching into the radiation environment of space. construction of SXTF is scheduled to begin in 1982 and the facility should be available for general use in 1984. Potential users are encouraged to express their needs for specific testing environments in SXTF.